Solving maintenance management issues! We utilized "rack scaffolding" for bridge inspections and repair work!
We would like to introduce our construction achievements for the repair work on the Hamana Ohashi Bridge (a 5-span continuous frame bridge <PC box girder>) on National Route 1, Hamana Bypass. As the bridge spans Lake Hamana and has a high superstructure girder height, the large-scale temporary scaffolding became a maintenance management issue. To address this, we utilized "rack scaffolding" for the bridge inspection and repair work. 【Overview】 ■ Location/Prefecture: Shizuoka Prefecture ■ Client: Ministry of Land, Infrastructure, Transport and Tourism, Chubu Regional Development Bureau, Hamamatsu River and National Route Office ■ Construction Company: Nakamura Corporation ■ Start Date of Use: May 2017 ■ Local workers' experience with rack scaffolding: First time ■ Presence of rack scaffolding handling instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
Related Videos
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
Our company, with the motto "Let's bring products that make the workplace happy," has consistently manufactured equipment that transports people and goods vertically, horizontally, and diagonally using rack and pinion systems. Since developing the "Monorack" for orchards in 1966, we have produced various products including the cargo lift "Rack Lifter," the "Tree Rack" for traversing forests, the shaft elevator "Mog Rack," the mobile scaffolding "Rack Scaffolding," and elevators for port container cranes. Please feel free to contact us if you have any inquiries.