It is possible to minimize the impact on ground operations! We were able to install it without any issues by utilizing its characteristics.
We would like to introduce our construction achievements related to the ceiling finishing work for the new international passenger terminal building at New Chitose Airport. Since the installation rail components (large roof truss) are curved in a planar manner, the track width has changed. However, by utilizing the characteristics of the "rack scaffolding," we were able to install it without any issues. Additionally, during the lateral reconfiguration, the movable floor was never lowered to the ground, which minimized the impact on ground operations. 【Overview】 ■ Location/Prefecture: Hokkaido ■ Client: Hokkaido Airport Co., Ltd. ■ Construction Company: Kajima, Miyasaka, Arai Joint Venture ■ Start of Use: August 2009 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
Related Videos
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
Our company, with the motto "Let's bring products that make the workplace happy," has consistently manufactured equipment that transports people and goods vertically, horizontally, and diagonally using rack and pinion systems. Since developing the "Monorack" for orchards in 1966, we have produced various products including the cargo lift "Rack Lifter," the "Tree Rack" for traversing forests, the shaft elevator "Mog Rack," the mobile scaffolding "Rack Scaffolding," and elevators for port container cranes. Please feel free to contact us if you have any inquiries.