[Construction Example] Bag Manufacturing Factory Floor Slab Settlement Correction Work and Underfloor Void Filling Work
The machine's level cannot be secured, and spacers are being used. A malfunction has occurred in the machine, affecting product accuracy. This can be resolved with the up-con method.
This time, we will introduce a case study of a bag manufacturing factory in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake that occurred in March 2011, the floor sank, causing the machines to tilt and hindering production. The Upcon method was adopted because it allows for corrections to be made in a short time without moving the machines. "We cannot secure the level of the machines and are using spacers." "Malfunctions are occurring in the machines, affecting product accuracy." We receive many inquiries about floor repairs like these at Upcon. The characteristic of the Upcon method is that it can correct floor subsidence in a short time, but a significant advantage is that it does not require the movement of machines or materials for the construction. [Site Information] Miyagi Prefecture, Bag Manufacturing Factory Construction Area: Approximately 730 square meters Maximum Subsidence: 111mm Construction Period: 3 days For detailed information about the construction process, you can view it by downloading the PDF below.
Inquire About This Product
basic information
■ What is the Upcon Method? The Upcon method involves drilling small holes with a diameter of 16mm into existing concrete floors that have experienced subsidence, steps, tilting, or gaps. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands rapidly under pressure, compacting and strengthening the ground, improving bearing capacity, and lifting the concrete to correct it. The final strength of the resin is achieved in about 60 minutes. Additionally, if there are gaps beneath the floor, they can be filled using the same method. *The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or cargo. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 that of conventional methods. 2. No interruption of operations: There is no need to move machinery or cargo. 3. Comprehensive high technical capability: Responsible construction by 100% in-house staff. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence compared to conventional methods. We provide total support for on-site surveys, repair planning, and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff, trained in the field, will propose the optimal repair plan tailored to your site.
Price range
Delivery Time
Applications/Examples of results
■Ground floor sinking correction work ■Ground floor void filling work
catalog(8)
Download All Catalogs![[Construction Case Study/Warehouse Edition Vol. 3] Correction of Floor Settlement (Leveling Correction) in a Logistics Center](https://image.www.ipros.com/public/catalog/image/01/440/691142/IPROS92327252784948285479.jpeg?w=120&h=170)
![[Construction Case Study/Factory Edition Vol. 1] Settlement Correction and Void Filling Work for a Bag Manufacturing Factory](https://image.www.ipros.com/public/catalog/image/01/2e3/649428/IPROS09434185074319628739.jpeg?w=120&h=170)
![[Construction Case Study/Factory Edition Vol.2] Settlement Correction and Void Filling Work for Precision Parts Manufacturing Factory](https://image.www.ipros.com/public/catalog/image/01/60a/649429/IPROS31170878921170722761.jpeg?w=120&h=170)
![[Construction Case Study Factory Edition Vol. 3] Correction Work for Sunken Floor Slab in a Metal Processing Factory](https://image.www.ipros.com/public/catalog/image/01/7cc/727508/IPROS94865378217145340721.jpeg?w=120&h=170)
![[Construction Case Study/Warehouse Vol.2] Settlement Correction Work for Automobile Manufacturer's Office and Parts Storage](https://image.www.ipros.com/public/catalog/image/01/d82/644772/IPROS41981554215493828964.png?w=120&h=170)
![[Construction Case Study/Warehouse Vol. 1] Settlement Correction and Void Filling Work for Warehouse and Factory](https://image.www.ipros.com/public/catalog/image/01/d17/644938/IPROS68258418151929232212.jpeg?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.