The temporary waterproof sheet method is characterized by its ability to significantly reduce underwater construction by divers. We will cooperate in the design!
The temporary deadline FPS method has many advantages compared to conventional methods, including construction costs and timelines. Lifting fixtures and floating work platforms are installed, and the liner plates are assembled in the air before being lowered and installed underwater. 【Advantages】 ■ Manual construction is possible ■ Large-scale temporary structures are not required ■ Simple construction and processes, etc. 【Evaluation】 ■ Improved safety due to reduced underwater construction ■ Cost reduction For more details, please download the materials or contact us directly.
Inquire About This Product
basic information
We handle temporary cutoff waterproof sheet methods, temporary cutoff FPS methods, special excavation pump dredging methods, and underwater investigation and surveying. Please feel free to contact us if you have any requests. Business Activities ■ Construction Consultant ■ General Civil Engineering ■ Marine Surveying
Price range
Delivery Time
Applications/Examples of results
For details, please download the materials or contact us directly.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in construction consulting and general civil engineering. We handle temporary cutoff waterproof sheet methods, temporary cutoff FPS methods, special excavation pump dredging methods, and underwater surveys and measurements. Please feel free to contact us if you have any inquiries.