Case Study of Station Platform Slab Reinforcement | Significant Reduction in Nighttime Overtime Costs through Daytime Construction
Suppressing noise and vibration, enabling daytime construction during train operations. A case that eliminates additional costs and security expenses associated with nighttime work, achieving both safety and cost reduction.
This is a proven track record that demonstrates high workability and safety in the reinforcement of station platform slabs. Daytime construction was completed while trains were running, minimizing the impact on the surrounding area. ■ Daytime work eliminates the need for night shift premium wages, lighting equipment, and additional security personnel costs, thereby reducing construction expenses. ■ The lightweight sheet material can be transported manually, allowing for flexible responses even in sites with restricted access routes. ■ The risk of accidents and contact associated with heavy machinery operation is eliminated, ensuring high safety for both workers and users. ■ Noise, vibration, and exhaust emissions are significantly reduced, lowering the risk of complaints from nearby residents and users. ■ Quick and quiet construction achieves reinforcement with minimal burden even in facilities that are operational. *For more details on the above case and information about the APLAS sheet method, please refer to the catalog download.
Inquire About This Product
basic information
【Product Specifications (Partial)】 ■Fiber: PAN-based (High Strength Type) ■Resin: PPS ■Fiber Weight: 200g/m2 ■Product Thickness: 0.25mm ■Design Thickness: 0.111mm ■Width: 250mm *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 ■ Road Bridge Deck Reinforcement - Adopted for the reinforcement of road bridge decks that have deteriorated. - Simplifies the work process compared to carbon fiber bonding methods, achieving greater construction efficiency. ■ Station Platform Deck Reinforcement - Enables construction during the day while trains are running, carrying out reinforcement work on aging platform decks. - A new method that does not require heavy machinery, ensuring both safety and cost reduction. *For more details, please download the PDF or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Aurostech Technologies LLC is a company engaged in research and development related to plasma surface modification technology, as well as the manufacturing, planning, and sales of products related to these technologies. With a professional team possessing extensive technical expertise and know-how in plasma technology, we have set our mission as "solving adhesion challenges in core industries and enriching people's lives," and we are committed to daily research activities and product development while looking toward the future society. Depending on the combination of plasma treatment conditions and materials, it is possible to maintain high adhesion for an extended period or to achieve direct bonding without adhesives. Additionally, since roll-to-roll processing is possible under a reduced pressure atmosphere, we can achieve both stable processing effects and high productivity.






