FCR Liner Method (Remote Response, Short Curing Type) | FCR Method Association
FCR Liner Method (Remote Response, Quick Curing Type) FCR Method Association
Repair of the buried section that construction vehicles cannot approach within 300 meters.
If construction vehicles can approach within 300 meters of the railway drainage pipe facilities (including the inlet, outlet, and downspout) that need repair, it can be carried out using the FCR liner method (standard type). However, if they cannot approach within 300 meters, extensive preliminary preparations such as the installation of temporary roads must be made to carry out the work. We have developed the "FCR liner method (remote response, quick curing type)" that can be used for repairs even when construction vehicles cannot get within 300 meters. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Features】 1. Repairable cover that can be approached within 300m by construction vehicles. 2. Compact cleaning and repair equipment, loaded onto rail vehicles. 3. Portable cover-specific camera reduces payload. 4. Short curing time for FCR lining material. ● For more details, please contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.