No operational pollution or water quality pollution will occur! Introducing construction methods that can reduce total costs.
We would like to introduce our "River and Coastal Erosion Repair Work." A composite pipe, which integrates a pressure pipe and a water suction pipe, is inserted into the cavity of the erosion structure to discharge stagnant water while preventing damage expansion through concrete pressure placement. There is no displacement of the river width, and it does not disrupt the landscape or form. Additionally, construction machinery and manual labor are not required, allowing for a reduction in workforce. 【Features】 ■ No displacement of the river width ■ Does not disrupt the landscape or form ■ No water replacement needed for low water volume affected areas ■ Construction by extending the pressure placement hose from a distant mixing vehicle ■ Short-term construction is possible *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 ■ No need for temporary roads or leased land ■ Construction machinery and manual labor are not required, allowing for a reduction in workforce ■ No work-related pollution or water quality contamination occurs ■ Possible reduction in total costs *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
ESP Corporation is a company located in Hiroshima City, Hiroshima Prefecture, specializing in stone masonry reinforcement, river erosion control, and bank erosion repair focused on landscape aesthetics. Please consult us for repairs and reinforcements related to water, such as landscape-forming empty stone masonry wall reinforcement using the "Auto-Tsu Method," small-scale riverbank erosion control, small-scale coastal erosion control, sediment control dam erosion, and the Toosui CON filling method.