It is a pipe rehabilitation method that forms CIPP within the pipeline by curing thermosetting resin.
We would like to introduce the "K-2 Method," a pipe rehabilitation system. The "K2 Liner," which is a tubular resin adsorbent material covered on both the inner and outer surfaces with a plastic film, is impregnated with thermosetting resin and then pulled into the pipeline. Fluid pressure is applied to the lining material, which is adhered to the wall of the pipeline, and the lining material is heated with hot water or a hot water shower to cure the thermosetting resin, thereby forming CIPP within the pipeline. After curing, the plastic film on the inner surface is peeled off. 【Application Range】 ■ Main sewer pipes: φ150 to φ1200 ■ Sewer connection pipes: φ100 to φ200 ■ Construction length - Main pipes: up to 100m - Connection pipes: up to 30m *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Get Co., Ltd., we primarily focus on pipe rehabilitation projects, and we engage in the development of technology, as well as the manufacturing and sales of materials and equipment. Additionally, we are expanding our business by importing and exporting products (such as water stop plugs, water stop valves, and water stop balls), as well as providing installation services. Please feel free to contact us if you have any inquiries.