It is possible to directly reach the existing shield through the application of metal cutting technology! We are currently presenting examples of construction where direct cutting was performed on existing shields.
The "Milling Mole Method" is equipped with a specialized bit designed for cutting through obstacles using a tunneling machine. It allows the cutter of the tunneling machine to make ultra-low-speed contact with obstacles through a special telescopic pipe, enabling cutting through the rotation of the cutter. This operates on the same principle as lathe machining. A significant feature of this construction using the "Milling Mole Method" is that it achieved direct cutting of steel segments without performing mirror cutting. Since improvements to the protective measures of the existing shield section could not be made from the surface, a boring machine was mounted, allowing for injection from within the tunneling machine (using a dual-pipe strainer method with multiple phases). Additionally, a formwork for cutting connection was installed inside the existing shield, and fluidized treatment soil was placed, allowing for direct cutting at ultra-low speeds and safely avoiding the risks of water inflow and subsidence accidents that occur during mirror cutting. Previously, mirror cutting was performed from within the shield, raising concerns from customers about the risks to the surrounding environment due to groundwater inflow and ground collapse associated with that construction. We proposed direct cutting of the existing shield, and after executing the construction, we successfully reached the target without affecting water inflow or the surrounding environment, resulting in great satisfaction from the client! 《You can download the construction case from the PDF below!》
Inquire About This Product
basic information
We exhibited at the Sewer Exhibition '19 Yokohama! The exhibition took place at Pacifico Yokohama from August 6 (Tuesday) to August 9 (Friday), 2019. At this exhibition, we conducted a presentation explaining the obstacle-responsive mud concentration type thrust milling mole method. Thank you very much for your visit!
Price range
Delivery Time
Applications/Examples of results
Construction work for advancement
catalog(2)
Download All CatalogsNews about this product(1)
Company information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.