Stable supply with no price fluctuations! Can be accommodated at depths of soft ground. Construction with compact machinery.
We will introduce the reasons why the "Ultra Wood Column Method" is adopted. Methods such as column improvement and steel pipe pile methods require a supporting layer or stable layer, but this method can be applied at the depth of soft ground. Additionally, it can be implemented up to a maximum of 4.5 meters, specifically addressing soft ground, so there is no need for large, high-power machinery; compact machines like pile drivers can be used. Due to these characteristics, it is adopted in cases such as: "I was told by a ground reinforcement construction company that 'reinforcement work cannot be designed because there is no supporting layer.'" "I was told that the cost of reinforcement work with steel pipe piles is high because the supporting layer is deep." "I was told that I need to implement column improvement for 8 meters in the intermediate layer of the ground." 【Features】 ■ Can be designed for soft ground ■ Construction with small machinery ■ Low raw material costs ■ Reliable because it is a construction method with certified building technology performance *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Yamashita Kogyo Co., Ltd. smoothly manages the process from accepting ground surveys necessary for the application of the defect warranty system to the completion of ground improvement and reinforcement work, also taking responsibility for the added trust of ground warranty. ■ "Defect Warranty" A defect warranty is a promise to "compensate for losses incurred when a defect is found." When a defect warranty is provided, if a "defect" is identified in a major structural part of the house and repairs are made, insurance money will be paid. A ground survey is required when applying for insurance to fulfill the defect warranty. Our company conducts everything from proposals for the necessary ground surveys and ground improvements for the defect warranty to the actual execution of the work. * Based on the data obtained from the ground survey, we will propose suitable ground reinforcement and improvement work by utilizing our accumulated experience while considering various ground characteristics. * For housing suppliers such as construction companies and real estate firms who are wondering "What should we do?" regarding housing defect warranties and ground surveys, please feel free to contact us.