Improvement of safety rates and cost reduction are also possible! Construction examples are also introduced with photos.
When the drainage method alone does not meet the required safety factor, combining it with Paralink can improve the safety factor. Additionally, when a denser drainage pitch (≤1.0m) is necessary, using Paralink in conjunction allows for widening the pitch, which can also reduce costs. 【Construction Example】 ■ Japan Highway Public Corporation Kisarazu Construction Office, Tateyama Expressway, Kimitsu IC Construction *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
[Construction Example] Japan Highway Public Corporation Kisarazu Construction Office Tateyama Expressway Kimitsu IC Construction Ground Mesh Work
catalog(1)
Download All CatalogsCompany information
"Simple is Best - Always question the truth and add even a little value." This is our mission. Through collaboration with the rapidly growing Macaferri (Italy) and its subsidiary Linear Composites (UK), which joined in June 2006, we aim to tackle challenges such as the development of geosynthetic parapets for soft ground stabilization measures and seismic design issues like liquefaction deformation suppression. We will continue to learn from everyone's wisdom and innovate daily.