Protect against the intrusion of deterioration factors into the joint areas of the truss bridge!
The "Steel Truss Bridge Node Cover Method" is a technique that involves covering the node parts of a steel truss bridge to prevent the intrusion of corrosive factors such as dust and sediment, thereby slowing the progression of deterioration. By protecting the node parts in advance, it is expected to have a preventive maintenance effect, which can reduce maintenance costs. Since the materials used are processed in a factory, they can be easily installed. 【Features】 ■ Highly durable ■ Excellent impact resistance and heat resistance ■ Easily inspectable ■ If dust or dirt adheres to the surface, it can easily wash away during rain ■ Structure enhances breathability *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Project】 ■Measurement of grid points ■Manufacturing and assembly of each component ■Installation of the cover *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Examples】 ■Shinbo Ohashi Bridge Seismic Repair Work ■Kisogawa Kawata Bridge, etc. *For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Iida Consultant Co., Ltd. is a consulting company that connects people and cities, supporting a rich society and an environmentally friendly planet. We respond to diverse needs such as civil engineering surveying and design, compensation work, rebar detection, and non-destructive testing, always recommending the latest technologies to ensure safe and secure urban development.