iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36730items
    • Facilities
      Facilities
      57257items
    • Lighting and Interior
      Lighting and Interior
      17502items
    • Common materials
      Common materials
      37138items
    • Civil Engineering Materials
      Civil Engineering Materials
      9973items
    • Construction, work and methods
      Construction, work and methods
      28638items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29689items
    • IT/Software
      IT/Software
      33188items
    • others
      others
      80624items
    • Store and facility supplies
      Store and facility supplies
      4575items
    • Office and commercial supplies
      Office and commercial supplies
      11636items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1022items
    • Logistics Equipment
      Logistics Equipment
      7237items
    • Energy and Resources
      Energy and Resources
      11999items
  • Search for companies by industry

    • Information and Communications
      7310
    • others
      7189
    • Building materials, supplies and fixtures manufacturers
      6580
    • Service Industry
      4695
    • Trading company/Wholesale
      3020
    • Other construction industries
      2427
    • Electrical equipment construction business
      635
    • Interior Design
      520
    • Facility Design Office
      491
    • Construction Consultant
      476
    • retail
      360
    • Architectural design office
      356
    • Warehousing and transport related industries
      324
    • General contractors and subcontractors
      314
    • Electricity, Gas and Water Industry
      288
    • Interior construction business
      279
    • Medical and Welfare
      274
    • Building Management
      258
    • Educational and Research Institutions
      254
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      202
    • Housing manufacturers and construction companies
      184
    • Transportation
      164
    • Real Estate Developers
      157
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      65
    • Finance, securities and insurance
      40
    • self-employed
      31
    • Restaurants and accommodations
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
    • Property Owner
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • retail
  • Architectural design office
  • Warehousing and transport related industries
  • General contractors and subcontractors
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Building Management
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • self-employed
  • Restaurants and accommodations
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Government
  • Individual
  • Property Owner
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Civil Engineering Method
  6. HiroWork Kmighty Method

HiroWork Kmighty Method

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Jan 21, 2020

Taiyo Kisokogyo Co.,Ltd.
Taiyo Kisokogyo Co.,Ltd.
  • Special site
  • Official site

NETIS registration! The "full-length extraction method" pulls out existing piles with ultra-low vibration and ultra-low noise.

By combining a specially developed flexible casing and an auger drilling motor to generate rotational force with a high-pressure water jet, this "full-length extraction method" releases the friction between existing piles and the ground, allowing for the extraction of existing piles with ultra-low vibration and ultra-low noise. 【Features】 1. NETIS registration No. KT-120066-A 2. Ultra-low vibration and ultra-low noise 3. Compatible with inclined piles 4. Suitable for close proximity and narrow space construction 5. High work efficiency for various pile types with high-pressure water jet 6. Step construction is possible 7. Reduction of work time 8. Safety during operation For more details, please refer to the catalog or feel free to contact us.

    Pile and foundation workCivil Engineering Method
ヒロワーク.png

HiroWork Kmighty Method

ヒロワーク.png
ヒロワーク.png
  • Special site - Product/service details - https://pr.www.ipros.com/taiyoukiso/product/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

【Types of Piles Available for Construction, Applicable Pile Diameters, and Depths】 ■ Timber Piles  ・Pile Diameter: φ150–300  ・Pile Length: up to 20m ■ RC, PC, PHC Piles, Steel Pipe Piles  ・Pile Diameter: φ250–1200  ・Pile Length: up to 70m ■ Cast-in-Place Piles  ・Pile Diameter: φ700–1400 / φ1500–1700 / φ1800–2000 / φ2100–2500  ・Pile Length: up to 64m / up to 50m / up to 40m / up to 30m ■ Others  ・Pile Diameter: Inclined Piles, SMW Core Material  ・Pile Length: up to 20m *For more details, please refer to the catalog or feel free to contact us.

Price information

Please contact us.

Delivery Time

Please contact us for details

※Please contact us.

Applications/Examples of results

For more details, please refer to the catalog or feel free to contact us.

catalog(1)

Download All Catalogs
HiroWork Kmighty Method

HiroWork Kmighty Method

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

Taiyo

Taiyo Kisokogyo Co.,Ltd.

General contractors and subcontractors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.

Product/Service List (57)

Popular products in related categories

HiroWork Kmighty Method
Construction, work and methods
HiroWork Kmighty Method
Taiyo Kisokogyo Co.,Ltd.
Shin-ei Heavy Machinery Construction Co., Ltd. Business Introduction
Construction, work and methods
Shin-ei Heavy Machinery Construction Co., Ltd. Business Introduction
新栄重機建設工業
Quality Control Method: "Mixing Tester Method"
Construction, work and methods
Quality Control Method: "Mixing Tester Method"
山下工業
Achieving a solid foundation for buildings: "Rising W Method ECO"
Construction, work and methods
Achieving a solid foundation for buildings: "Rising W Method ECO"
山下工業
[Construction Case] Ground Support Strengthening Injection Work for a Pool at a Certain Embassy
Construction, work and methods
[Construction Case] Ground Support Strengthening Injection Work for a Pool at a Certain Embassy
平成テクノス

Related New Products

"Specially processed mesh fabric" New product! Water-draining FRECONE bag
Construction, work and methods
"Specially processed mesh fabric" New product! Water-draining FRECONE bag
インターアクション
Pile construction under the restriction of optical cable air head 'SPACE21 Method'
Construction, work and methods
Pile construction under the restriction of optical cable air head 'SPACE21 Method'
松村組 本社
Nighttime road occupancy pile construction under the cover board "SPACE21 Method"
Construction, work and methods
Nighttime road occupancy pile construction under the cover board "SPACE21 Method"
松村組 本社
Construction of temporary platform piles for the Dotonbori River promenade using the "SPACE21 method."
Construction, work and methods
Construction of temporary platform piles for the Dotonbori River promenade using the "SPACE21 method."
松村組 本社
Construction of the Ebisu Bridge Replacement in the Center of Minami's Entertainment District using the "SPACE21 Method"
Construction, work and methods
Construction of the Ebisu Bridge Replacement in the Center of Minami's Entertainment District using the "SPACE21 Method"
松村組 本社

The related categories of Pile and foundation work

  • Construction, work and methods
  • Construction methods and technologies
  • Civil Engineering Method
  • Construction Works
  • Pile and foundation work
Find products and companies by related keywords
  • #Construction method
  • #Improvement works
  • #Work method
  • #Ground improvement work
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.