Acquisition of architectural technical performance certification! High quality and high support capacity! Pile foundation reinforcement method for detached houses regardless of ground type.
The "Pure Pile Method" is a foundation reinforcement technique for single-family homes that solidifies cement milk into pile shapes underground, demonstrating high quality and high load-bearing capacity regardless of soil type. The construction procedure involves only one round of excavation and filling, allowing for fast construction speed and the creation of high-quality columns. By adopting a conical excavation head, the risk of soil clumping contamination during excavation has been eliminated. 【Features】 - Does not mix cement milk with the ground - The quality of the pile-shaped columns is not affected by soil type at all - Can be applied even in humus soil where solidification is difficult with conventional column improvement methods - Due to the principles of the construction method and procedure, the ground is not loosened, resulting in high vertical load-bearing capacity - Straight rods or spiral rods can be used according to soil type - Since straight rods do not have a soil discharge mechanism, there is almost no generated residual soil For more details, please feel free to contact us.
Inquire About This Product
basic information
【Applicable Ground and Construction Specifications】 ■ Applicable Ground - Ground at the tip of the column: sandy ground, clayey ground - Ground around the column: sandy ground, clayey ground, humus soil (However, the friction of humus soil is not considered) ■ Maximum Construction Depth - Ground at the tip of the column: sandy ground (10m from the construction ground surface) clayey ground (8m from the construction ground surface) ■ Applicable Buildings - 3 stories or fewer above ground, building height of 13m or less - Eaves height of 9m or less, total floor area of 500m² or less *For more details, please feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.