Latest tunnel leakage prevention methods
The KB panel method (both line drainage and surface drainage) is a technique developed to address the shortcomings of conventional leak prevention measures and is considered an economical solution for leak prevention. It involves making cutter grooves (20mm to 30mm) in the concrete structure, filling them with adhesive, and inserting and pressing the KB panel insertion plates to secure them.
Inquire About This Product
basic information
【Features】 ◯ Can limit protrusion from the wall to a minimum of 3 to 50 mm ◯ Can appropriately adjust the flow space according to the amount of leakage Ensures reliable water guidance and minimizes leakage by securing a water flow path ◯ Short construction period and low installation costs ◯ Has little impact on the strength of the structure due to construction Additionally, repairs can be easily made in case of damage or destruction ◯ Can be installed at the bottom of the side wall to easily create a side ditch ◯ Both line drainage and surface drainage are possible, and installation is feasible even with uneven surfaces ● For more details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
Company information
Environmental shaping refers to the creation of social and cultural spaces by adding artistic value to buildings. It is our hope that these shaped objects can delight the eyes of viewers, soothe their hearts, and even encourage them. Our company's operations are structured around five pillars that align with this philosophy. 〇 Architecture Division Production of specialized decorative formwork, decorative materials for building interiors and exteriors, displays, window frames, moldings, decorative columns, and more. 〇 Art Division Restoration and reconstruction of artworks, design and construction of reliefs, ceramic panels, ceramic walls, and various monuments. 〇 Civil Engineering Division Design, production, and construction of KB panel method, tunnel entrances, retaining walls, wall surfaces, exterior walls, and the design of main pillars, handrails, and deck surfaces that represent bridges. 〇 Styrofoam Processing Division Processing and molding of various types of styrofoam. 〇 Barrier-Free Division Production and construction of barrier-free products such as ramps for eliminating steps, stepping stools, and impact-absorbing cushions.