The "Hybrid Joint," a flexible device that has proven long-term durability and high water resistance.
Proven durability of 50 or 100 years through fatigue load testing!
建設現場で欠かせない資材や工法などさまざまな関連製品・技術をご紹介!
掲載開始:
46~88 item / All 88 items
Proven durability of 50 or 100 years through fatigue load testing!
Introducing features and product examples with photos! Please use this as a reference when choosing a telescopic device.
Reinforcement is possible just by applying the NETIS registration sheet. Construction can be completed in as little as one day. Reduces on-site construction time by 40%. A reinforcement method that makes upward installation easy.
Suppressing noise and vibration, enabling daytime construction during train operations. A case that eliminates additional costs and security expenses associated with nighttime work, achieving both safety and cost reduction.
The construction period was shortened from 4 days to 2 days. This is an example from a road bridge in Suzu City, Ishikawa Prefecture, where the man-hours were reduced by half compared to conventional methods, achieving both a reduction in on-site burden and cost control.
Realization of 10-year effectiveness: A termite prevention method compatible with insulated homes, air cycle homes, and low-floor homes.
Basic Knowledge of Termites - Available for Free
Key Points of Chemical Treatment and Chemical Selection in World Heritage Sites
Elevate your space with wall-mounted options! A wide variety of fixed-angle and adjustable-angle types available.
An arm type that allows you to freely adjust the direction of the TV!
Active in various scenes such as hotels, hospitals, and commercial and public facilities!
Introducing a fully permeable drainage material with both excellent drainage capacity and high pressure resistance! Featuring a three-dimensional mesh spiral structure.
Achieving a "quiet presence" that blends into the space and a "specification" that responds to the site environment!
It circulates the limited freezing capacity of the lightweight and compact interior widely!
To a new stage that unfolds beyond the ceiling! An aluminum frame system ceiling that realizes a clean space.
A prefabricated cold storage facility that accommodates diversification, quick delivery, and flexibility! It allows for structural work to be completed in a short period during new installations, expansions, or renovations!
It can be quickly implemented in existing facilities such as outdoor areas and lockers where securing power is difficult. Rental options help reduce the costs of implementation and operation.
Eliminate "go and check" to streamline progress management at construction sites.
No metal clamps are needed, making installation easy! Lightweight at approximately 1.4 kg and "safe and secure" without using metal! The binding hooks improve recovery and transport efficiency.
Excellent durability and corrosion resistance! Outstanding usability! Steel supports for Tsuka and Kanamono.
Assemble like "LEGO"! It's a simple yet versatile product.
Insulation enhanced with a 99% installation rate of insulation material! A plywood system that can be installed after the floor framing.
A cold mix material that allows for easy repair of pavement depressions and holes. Please use it for pavement repairs.
For repairing asphalt pavement and concrete! With moderate low viscosity, it's easy to work with! Please use it for road repairs and pavement repairs.
"No mowing for 10 years! *" A silicone-based filler with excellent weather resistance, 'Sukimahaze.'
It is a soil water-absorbing agent specialized for pile driving operations. It quickly solidifies the mud water generated during excavation, making transportation and disposal easier.
Lightweight, durable, and slip-resistant! Recyclable aluminum gutter cover made from high-purity aluminum.
Reduction of costs for measuring and managing parent piles and steel sheet piles of retaining walls using wireless inclinometers - Easy on-site DX (NETIS registered product)
Integration with various cloud systems is possible through API collaboration!
Automatic measurement of mountain retaining displacement using cloud technology achieved at low cost! (NETIS registered product)
This is a step elimination construction that reduces the impact when passing through joints and improves the productivity of forklift operations. It is also effective for preventing cargo collapse. Survey responses are available.
A floor bridge method that smoothly connects joints and eliminates step differences, improving vehicle movement in logistics warehouses and factories.
Ensure construction quality that considers flatness, durability, dust suppression, and static electricity control for high-load data center floor slabs.
Secure against crime even in places without power!
Stable images in wide locations, high places, and scaffolding. Streamlining safety checks with stable remote presence.
Share real-time progress on-site with Teams smart glasses.
This is a dedicated formwork that suppresses quality variation by the contractor and enables stable column base grout construction. <Sample requests are currently being accepted>
<Sample acceptance ongoing> Easily create formwork to solve the labor shortage problem. With the same number of workers, nearly twice the amount of grouting can be performed!
<Sample Submission Accepted> Are you looking to address labor shortages and shorten construction time with column base grout work using Easy Formwork Pro?
For disaster recovery of slopes! Compared to conventional methods, it is possible to reduce costs and shorten construction time.
A collection of case studies on slope mitigation methods in special warning areas for landslide disasters is being presented. Consideration for landscape, shortened construction period, cost reduction, and the ability to construct in small spaces.
Impact the tip bit to increase propulsion. A new driven drainage pipe made of stainless steel, resistant to rust [patent obtained].
Stay Updated with Our Newsletter
The next update is,.