iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35449items
    • Facilities
      Facilities
      55940items
    • Lighting and Interior
      Lighting and Interior
      17253items
    • Common materials
      Common materials
      36612items
    • Civil Engineering Materials
      Civil Engineering Materials
      9530items
    • Construction, work and methods
      Construction, work and methods
      27341items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29315items
    • IT/Software
      IT/Software
      32785items
    • others
      others
      76488items
    • Store and facility supplies
      Store and facility supplies
      4377items
    • Office and commercial supplies
      Office and commercial supplies
      11419items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      955items
    • Logistics Equipment
      Logistics Equipment
      6762items
    • Energy and Resources
      Energy and Resources
      11612items
  • Search for companies by industry

    • Information and Communications
      7213
    • others
      7015
    • Building materials, supplies and fixtures manufacturers
      6660
    • Service Industry
      4644
    • Trading company/Wholesale
      3001
    • Other construction industries
      2453
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      489
    • Construction Consultant
      465
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      289
    • General contractors and subcontractors
      286
    • Interior construction business
      276
    • Medical and Welfare
      274
    • Educational and Research Institutions
      256
    • Building Management
      252
    • Renovation and home construction industry
      223
    • Water supply and drainage construction business
      201
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      37
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Building materials, supplies and fixtures manufacturers
  3. オガワ創研
  4. Product/Service List
Building materials, supplies and fixtures manufacturers
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

オガワ創研

addressTochigi/Utsunomiya-shi/2293 Bōmuhonmachi
phone028-665-3521
  • Official site
last updated:Apr 03, 2019
オガワ創研logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(11)
  • catalog(12)
  • news(0)

オガワ創研 List of Products and Services

  • category

1~11 item / All 11 items

Displayed results

class="retina-image"

[Construction Example] PPP-240 Special Nursing Home for the Elderly (Chikusei City, Ibaraki Prefecture)

Capable of processing 57 tons! Introducing construction examples in locations without sewage on the premises and no discharge destination.

We would like to introduce the installation of "PPP-240" at a special nursing home in Chikusei City, Ibaraki Prefecture. The construction took place in an area without sewage and no discharge outlet, and they requested a system capable of processing 57,000 liters per day for the special nursing home. Thus, we introduced the "PPP-240," which can handle a maximum of 57 tons of wastewater. As a result, instead of starting from scratch to create wastewater facilities, the introduction of our product allowed for the simultaneous creation of an individual wastewater treatment facility, eliminating the problem. This also led to a reduction in construction time and budget. **Background for the Introduction** - No sewage on the premises and no discharge outlet - Request for a system capable of processing 57,000 liters per day for the special nursing home - Construction period: 4 days - Number of workers: 4-5 people *For more details, please refer to the PDF document or feel free to contact us.*

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PPP-180 Restaurant (Oyama City, Tochigi Prefecture)

Drainage treatment of 36 tons per day is now possible! We will introduce examples of construction in areas without sewage systems.

We would like to introduce the installation of "PPP-180" at a restaurant in Oyama City, Tochigi Prefecture. Although it is relatively in the city center, the location does not have access to sewage, so "PPP-180" was introduced for the construction of the restaurant. After installation, it became possible to treat wastewater at a rate of 36 tons per day, accommodating 180 people. This also led to a reduction in construction time and budget. 【Background for the Installation】 - Although it is relatively in the city center, there is no sewage system. - The work request came from a purification tank manufacturer who received the order from the main contractor. - Construction period: 1 week - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PPP-30 Convenience Store Renovation Project (Tochigi Prefecture)

Up to 15 tons of wastewater treatment can be done in one day! Here are examples of construction in locations where there is no discharge destination for wastewater.

We would like to introduce the construction results of the convenience store renovation project (Tochigi Prefecture) where "PPP-30" was implemented. In a location without a drainage outlet, "PPP-30" was introduced for the construction of the convenience store due to the absence of sewage treatment. After the construction, it became possible to process wastewater for 30 people, enabling a treatment capacity of 15 tons per day. Additionally, this led to a reduction in construction time and budget. 【Background Leading to Implementation】 - There was no sewage treatment in a location without a drainage outlet when constructing the convenience store. - Construction period: 3 days - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

What is the on-site purification treatment device PPP (Sleepy)?

On-site purification treatment system composed of ultra-high-density polyethylene containers and high-void crushed stone filling layers.

"PPP (Sleepy)" is a device that evaporates and disperses the effluent from a treatment tank on-site in areas where there is no sewage system and no discharge destination even if a treatment tank is installed. The structure consists of a super high-density polyethylene container with a diameter of 600 mm and a height of 900 mm, along with a high-void crushed stone filling layer. If you are having trouble with on-site purification treatment devices, please feel free to leave it to us. [Features] - Evaporates and disperses effluent from a treatment tank on-site in areas where there is no sewage system and no discharge destination, even if a treatment tank is installed. - Composed of a super high-density polyethylene container with a diameter of 600 mm and a height of 900 mm, and a high-void crushed stone filling layer. *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Presenting Construction Case Studies!] On-site purification treatment system PPP (Sleepy)

Solving issues such as 'no sewage system' and 'even with a septic tank, there is no discharge destination'! We are introducing case studies from special nursing homes and restaurants!

This document is a collection of case studies summarizing the installation of the on-site purification treatment device "PPP (Sleepy)" handled by Ogawa Souken Co., Ltd. "PPP (Sleepy)" is a device that evaporates and disperses the effluent from a purification tank on-site in areas where there is no sewage system and no discharge destination even if a purification tank is installed. It addresses concerns such as: - "I need to start by creating drainage facilities, but there is no time." - "I don't have the budget to create drainage facilities." - "The price doesn't even match for installing a purification tank." It has been widely utilized in various settings, including special nursing homes, restaurants, and convenience store renovation projects. [Featured Cases] - "PPP-240" Special Nursing Home (Chikusei City, Ibaraki Prefecture) - "PPP-180" Restaurant (Oyama City, Tochigi Prefecture) - "PPP-30" Convenience Store Renovation Project (Tochigi Prefecture) *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ogawa Soken Co., Ltd. Company Overview

For anything related to on-site purification treatment systems, contact Ogawa Souken! We have numerous installation achievements.

Ogawa Soken Co., Ltd. is a company engaged in the construction and sales of purification tanks, as well as the manufacturing and sales of on-site purification treatment systems and the development of self-generating power systems. The on-site purification treatment system we handle, "PPP (Sleepy)," evaporates and disperses the effluent from the purification tank on-site in areas where there is no sewage and no discharge destination even if a purification tank is installed. If you are having trouble with on-site purification treatment systems, please feel free to leave it to us. 【Business Items】 ■ Purification tank construction ■ Purification tank sales ■ Manufacturing and sales of on-site treatment system PPP (Sleepy) ■ Various wastewater treatment, general ■ Development of self-generating power systems ■ Development of rainwater infiltration tanks *For more details, please refer to the PDF materials or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

On-site purification treatment system Combined purification tank for 10 people PPP-10 construction specifications

Standard specifications, floor plans, and cross-sectional drawings for parking lot specifications. Specifications for a combined septic tank for 10 people.

Ogawa Souken is engaged in purification tank construction and sales, as well as the manufacturing and sales of on-site treatment devices PPP (Sleepy), various wastewater treatment, general self-generating power device development, and rainwater infiltration tank development. This document is the "On-Site Purification Treatment Device Combined Purification Tank for 10 People PPP-10 Construction Specifications." It includes specifications for the PPP-10, such as inflow water volume and treatment capacity, as well as floor plans and cross-sectional views for standard specifications and parking lot specifications. Please use this information for product consideration and other purposes. [Contents] ■ PPP-10 Specifications ■ Standard Specification Floor Plan S 1:30 ■ Standard Specification Cross-Sectional View S 1:30 ■ Parking Lot Specification Floor Plan S 1:30 ■ Parking Lot Specification Cross-Sectional View S 1:30 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

On-site purification treatment system Combined purification tank for 7-person tank PPP-7 Construction specifications

Standard specifications and floor plans and cross-sectional views for parking lot specifications. Specifications for a combined septic tank for 7 people.

Ogawa Souken is engaged in the construction and sale of purification tanks, as well as the manufacturing and sale of on-site treatment devices PPP (Sleepy), various wastewater treatment, general development of self-generating power devices, and development of rainwater infiltration tanks. This document is the "Construction Specifications for On-Site Purification Treatment Device Combined Purification Tank for 7 People PPP-7." It includes the specifications for PPP-7, as well as floor plans and cross-sectional views for standard specifications and parking lot specifications. Please use this information for product consideration and other purposes. [Contents] ■ PPP-7 Specifications ■ Standard Specification Floor Plan S 1:30 ■ Standard Specification Cross-Sectional View S 1:30 ■ Parking Lot Specification Floor Plan S 1:30 ■ Parking Lot Specification Cross-Sectional View S 1:30 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

On-site purification treatment facility PPP maintenance management guidelines for 5-person to 10-person tanks.

Description of 7 inspection items. Maintenance management guidelines for PPP (Sleepy) for 5 to 10 person tanks.

Ogawa Souken is engaged in the construction and sale of purification tanks, as well as the manufacturing and sale of on-site treatment devices PPP (Sleepy), various wastewater treatment services, general development of self-generating power devices, and the development of rainwater infiltration tanks. This document introduces the 'Maintenance Management Guidelines for On-Site Purification Treatment Devices PPP for 5 to 10 Person Tanks,' which includes seven inspection items. In addition to the inspection items, it also includes cross-sectional diagrams of 5 to 10 person tanks. Please make use of this information for the maintenance management of your products. [Contents] ■ Inspection Items ■ Cross-Sectional Diagram of PPP 5 to 10 Person Tanks *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Delivery Performance Table for On-Site Purification Treatment Device PPP (Sleepy)

Publication of delivery results for PPP (Sleepy) from fiscal year 2012 to fiscal year 2017.

This document is a delivery performance report for the on-site purification treatment device PPP (Sleepy) manufactured and sold by Ogawa Souken. It includes the delivery performance of PPP from fiscal year 2012 to fiscal year 2017. PPP (Sleepy) has been installed in Tochigi Prefecture, Ibaraki Prefecture, Gunma Prefecture, Chiba Prefecture, Yamagata Prefecture, Shizuoka Prefecture, Miyagi Prefecture, Kanagawa Prefecture, Aichi Prefecture, Kumamoto Prefecture, and others. Please use this information for product consideration and other purposes. [Contents] ■ Fiscal Year 2012 PPP Delivery Performance Report ■ Fiscal Year 2013 PPP Delivery Performance Report ■ Fiscal Year 2014 PPP Delivery Performance Report ■ Fiscal Year 2015 PPP Delivery Performance Report ■ Fiscal Year 2016 PPP Delivery Performance Report ■ Fiscal Year 2017 PPP Delivery Performance Report *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

On-site purification treatment device "PPP (Sleepy)"

The processing tank has been made more compact while achieving greater processing capacity.

PPP (Sleepy) is a device that allows the evaporation and diffusion of treated wastewater on sites without sewage systems, where even if a septic tank is installed, there is no outlet for discharge. It consists of a super high-density polyethylene container with a diameter of 600 mm and a height of 900 mm, along with a high-void crushed stone filling layer. Processing Steps: The treated wastewater from the combined septic tank is sprayed from the top of the treatment device, where a scum removal net adsorbs impurities, and a carrier sponge performs adsorption and filtration of suspended solids (SS), followed by decomposition by microorganisms. By installing a waterproof sheet at the bottom of the treatment layer, the treated water is stored in the high-void crushed stone layer and gradually diffuses into the soil from the walls of the treatment layer, ultimately evaporating into the atmosphere. To ensure that the water quality is conducive to easy diffusion into the soil within the treatment device, stable functionality is maintained. PPP (Sleepy) has been installed in Tochigi Prefecture, Ibaraki Prefecture, Gunma Prefecture, Chiba Prefecture, Yamagata Prefecture, Shizuoka Prefecture, Miyagi Prefecture, Kanagawa Prefecture, Aichi Prefecture, Kumamoto Prefecture, and others.

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • 位置情報で実現するスマートロジスティクス 排出ガスも待機時間も”見える化”で解決
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.