Solving issues such as 'no sewage system' and 'even with a septic tank, there is no discharge destination'! We are introducing case studies from special nursing homes and restaurants!
This document is a collection of case studies summarizing the installation of the on-site purification treatment device "PPP (Sleepy)" handled by Ogawa Souken Co., Ltd. "PPP (Sleepy)" is a device that evaporates and disperses the effluent from a purification tank on-site in areas where there is no sewage system and no discharge destination even if a purification tank is installed. It addresses concerns such as: - "I need to start by creating drainage facilities, but there is no time." - "I don't have the budget to create drainage facilities." - "The price doesn't even match for installing a purification tank." It has been widely utilized in various settings, including special nursing homes, restaurants, and convenience store renovation projects. [Featured Cases] - "PPP-240" Special Nursing Home (Chikusei City, Ibaraki Prefecture) - "PPP-180" Restaurant (Oyama City, Tochigi Prefecture) - "PPP-30" Convenience Store Renovation Project (Tochigi Prefecture) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Case Study of Special Nursing Home (Chikusei City, Ibaraki Prefecture)】 ■Location: Special Nursing Home (Chikusei City, Ibaraki Prefecture) ■Product: PPP-240 ■Background for Introduction ・There is no sewage system on the premises, and there is no discharge destination. ・Since it is a special nursing home, we wanted to introduce a system capable of processing 57,000L/day. ・Construction period: 4 days ・Number of workers: 4-5 people ■Effects ・Enabled processing of up to 57 tons through drainage and other means. ・Normally, we would have to start from building drainage facilities, but with this introduction, it combined with the creation of an individual wastewater treatment plant, eliminating the problem. ・Led to budget reduction and shortened construction period. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in the construction and sales of purification tanks, as well as the manufacturing and sales of on-site treatment devices PPP (Sleepy), various wastewater treatment, and general services. The on-site purification treatment device "PPP (Sleepy)" is installed in Tochigi Prefecture, Ibaraki Prefecture, Gunma Prefecture, Chiba Prefecture, Yamagata Prefecture, Shizuoka Prefecture, and Miyagi Prefecture. Please feel free to contact us if you have any requests.