Drainage treatment of 36 tons per day is now possible! We will introduce examples of construction in areas without sewage systems.
We would like to introduce the installation of "PPP-180" at a restaurant in Oyama City, Tochigi Prefecture. Although it is relatively in the city center, the location does not have access to sewage, so "PPP-180" was introduced for the construction of the restaurant. After installation, it became possible to treat wastewater at a rate of 36 tons per day, accommodating 180 people. This also led to a reduction in construction time and budget. 【Background for the Installation】 - Although it is relatively in the city center, there is no sewage system. - The work request came from a purification tank manufacturer who received the order from the main contractor. - Construction period: 1 week - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
**Effect** - The capacity to process 180 people has enabled wastewater treatment of 36 tons per day. - This has led to a reduction in construction time and budget. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in the construction and sales of purification tanks, as well as the manufacturing and sales of on-site treatment devices PPP (Sleepy), various wastewater treatment, and general services. The on-site purification treatment device "PPP (Sleepy)" is installed in Tochigi Prefecture, Ibaraki Prefecture, Gunma Prefecture, Chiba Prefecture, Yamagata Prefecture, Shizuoka Prefecture, and Miyagi Prefecture. Please feel free to contact us if you have any requests.