Up to 15 tons of wastewater treatment can be done in one day! Here are examples of construction in locations where there is no discharge destination for wastewater.
We would like to introduce the construction results of the convenience store renovation project (Tochigi Prefecture) where "PPP-30" was implemented. In a location without a drainage outlet, "PPP-30" was introduced for the construction of the convenience store due to the absence of sewage treatment. After the construction, it became possible to process wastewater for 30 people, enabling a treatment capacity of 15 tons per day. Additionally, this led to a reduction in construction time and budget. 【Background Leading to Implementation】 - There was no sewage treatment in a location without a drainage outlet when constructing the convenience store. - Construction period: 3 days - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Effect】 ■ By being able to process 30 people, it has become possible to treat 15 tons of wastewater per day. ■ This has led to a reduction in construction time and budget. * For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in the construction and sales of purification tanks, as well as the manufacturing and sales of on-site treatment devices PPP (Sleepy), various wastewater treatment, and general services. The on-site purification treatment device "PPP (Sleepy)" is installed in Tochigi Prefecture, Ibaraki Prefecture, Gunma Prefecture, Chiba Prefecture, Yamagata Prefecture, Shizuoka Prefecture, and Miyagi Prefecture. Please feel free to contact us if you have any requests.