1~1 item / All 1 items
Filter by category

Iron coating peeling
Regarding the substrate preparation, the level of substrate adjustment according to "Renovation Common Work" is set to RA, and the surface preparation is classified as cleanliness level 2 (Type 2 Keren). However, in "Renovation Common Work," the cleanliness level 2 (Type 2 Keren) states that "rust and paint film remain in recessed and narrow areas," whereas the IMI method is characterized by the removal of rust and paint film in those areas as well. Complete stripping is made possible by combining high-pressure hot water washing with paint film softening stripping agents. Additionally, in areas where a high-pressure hot water washer cannot be used (such as narrow spaces), the substrate adjustment level is maintained by using a combination of paint film softening stripping agents with power tools and hand tools.