Ground reinforcement work | The SMD pile method boasts overwhelming tip resistance and ministerial certification technology.
The SMD pile method, certified by the Minister of Land, Infrastructure, Transport and Tourism, prevents initial shaft deflection due to its special inner and outer wing structure, demonstrating immense tip support capacity with a complete blockage effect.
Ground reinforcement work is an essential process to ensure the long-term structural safety and asset value of buildings. To prevent settlement and tilting accidents in soft ground, it is necessary to select reinforcement methods based on reliable ground surveys and analyses. The SMD pile method provided by Geotech Co., Ltd. is a construction method certified by the Minister of Land, Infrastructure, Transport and Tourism, which uses small-diameter steel pipe piles equipped with special outer and inner wings at the open-type steel pipe tip. During the initial phase of rotary penetration, the inner wing effectively captures soil to prevent axial deviation and maintains high straightness. Upon completion of penetration, the soil inside the pipe is compacted, resulting in a completely sealed state that exhibits extremely strong tip bearing capacity. This unique sealing effect ensures reliable support performance even for soft layers with an N value of less than 15 or cohesive soil layers. Additionally, rigorous product inspections at our factory and thorough construction monitoring using real-time data management devices on-site accurately track and record the stopping depth and torque values. We support the safe foundation of buildings with reliable technical specifications and a robust quality management system.
- Company:ジオテック
- Price:Other