[Construction Case] Parts Manufacturer Factory: Floor Slab Settlement Correction Work
A case where the earthen floor, which had subsided and developed gaps due to the earthquake, was repaired in a short construction period without breaking the existing floor!
We would like to introduce a case where "floor sinking correction work" and "void filling work under the floor" were carried out at a parts manufacturer factory in Fukushima Prefecture. There were various areas within the factory experiencing sinking and deflection, resulting in a wavy floor and the occurrence of voids in addition to the sinking. After the construction, the factory floor was corrected to a nearly level state, and to suppress vibrations caused by forklift passage, we focused on injecting and filling the corridor areas to mitigate the vibrations. [Case Overview] ■ Construction Area: Approximately 1,470 m² ■ Maximum Sinking Amount: 40 mm ■ Maximum Void: 60 mm ■ Area: Parts manufacturer located in Fukushima Prefecture ■ Construction Period: 11 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other