[Construction Case] Nursing Facility: Correction Work for Sunken Earthen Floor
Up to 60mm of subsidence in the central Slavic region! Ground consolidation and strengthening with the foaming pressure of polyurethane resin.
Here is a case study of "floor sinking correction work" carried out at a nursing care facility in Shizuoka Prefecture. Due to weak ground, subsidence occurred, resulting in visible sinking of the floor within the facility. During a preliminary survey, a maximum subsidence of 60mm was observed at the center of the slab, and a gap of 50mm was confirmed near the beams. Using the foam pressure of polyurethane resin, the ground was compacted and strengthened, filling the gaps between the slab and the ground, while simultaneously correcting the floor sinking. [Case Overview] ■ Construction Area: Approximately 60m2 ■ Location: Nursing care facility in Shizuoka Prefecture ■ Construction Period: 1 day *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other