[Construction Case] Slab Foundation House: Settlement Correction Work (Gifu Prefecture)
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
We would like to introduce a case of "settlement repair work" carried out on a certain house with a flat foundation in Gifu Prefecture. There was a request to perform settlement repair before the exterior wall work, and we were contacted by the client. We injected resin under the flat foundation to carry out the settlement repair, completing the work in two days. 【Case Overview】 ■ Construction Area: Approximately 36m2 ■ Maximum Settlement Amount: 48mm ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.