Reinforcement method Product List and Ranking from 43 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Reinforcement method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. コンステック Osaka//General contractors and subcontractors
  2. 横山基礎工事 Hyogo//General contractors and subcontractors
  3. ESP Hiroshima//Other construction industries
  4. 4 日鉄ケミカル&マテリアル コンポジット事業部 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 ケー・エフ・シー Osaka//Building materials, supplies and fixtures manufacturers

Reinforcement method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  2. Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事
  3. Construction Method Comparison Table ESP
  4. 4 Pole Repair and Reinforcement Method: YCK Method 'Carbon Fiber' ヨシモトポール
  5. 5 Shear Reinforcement Method "RMA Method" ケー・エフ・シー

Reinforcement method Product List

256~270 item / All 372 items

Displayed results

Stainless coat spray type

Just spray it on stainless steel! Excellent effects for corrosion resistance, rust prevention, and weather resistance!

The "Stainless Coat Spray Type" allows for the formation of a coating of Stainless Coat SUS316-L simply by spraying, and can be used on various materials such as metal, plastic, PVC, wood, stone, and concrete. The leaf-like stainless pigment layers overlap to form a high-density multi-layered coating that completely prevents contact with water and air, protecting against the effects of ultraviolet rays and the atmosphere. 【Lineup】 ■ General Use (PU Type): General-purpose coating that can be widely used for rust prevention and corrosion protection. ■ Decorative Use (SB Type): High decorative finish such as hairline and mirror surface. ■ Heat Resistant (SIL Type): Remarkable heat resistance that withstands high temperatures of up to 650℃. *For more details, please download the PDF or feel free to contact us.

  • Rust Inhibitor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Surface coating material "Alonbur Coat Z-X / Z-Y method"

Environmentally friendly and structure-friendly! Concrete surface protection material using acrylic rubber.

The "Alonbur Coat Z-X and Z-Y Method" is a concrete surface protection material that uses acrylic rubber. Repair methods for concrete structures that utilize the features of "Alonbur Coat" include the Z-X method (prevention of deterioration + prevention of peeling) and the Z-Y method (prevention of deterioration). All standard materials used are water-based, resulting in minimal organic solvent odors or unpleasant smells, as well as reduced skin irritation commonly associated with organic materials, making it environmentally friendly for both the surrounding area and workers. The coating can be reapplied, which is effective for environmental measures and waste reduction during the next repainting. 【Features】 ■ Environmentally friendly due to the use of water-based materials ■ Repainting of the coating is possible ■ Allows moisture release from within the concrete ■ Good adhesion durability of the membrane layer to the concrete ■ Easy maintenance *For more details, please refer to the catalog or feel free to contact us.

  • Other civil engineering works
  • Concrete construction
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SK Bar Mesh Unit Construction Method

Tunnel reinforcement rebar labor-saving method! A cycle every two days is now possible, significantly reducing work time!

We would like to introduce our "SK Bar Mesh Unit Construction Method." By pre-manufacturing the reinforcing bars in a lattice shape at the factory, the rebar assembly work on site is significantly reduced, leading to labor savings and a reduction in work time. Additionally, by scanning the two-dimensional code on the product label, the production history (information about the materials used, etc.) can be confirmed on the spot. We have production bases in two locations, Kyushu and Eastern Japan, allowing for stable supply throughout Japan. 【Features】 ■ Reinforcing bars are pre-manufactured in a lattice shape at the factory ■ Significantly reduces rebar assembly work on site, leading to labor savings and reduced work time ■ Scanning the two-dimensional code on the product label allows for on-the-spot confirmation of production history (information about materials used, etc.) ■ Stable supply is possible throughout Japan (with production bases in Kyushu and Eastern Japan) ■ Over 900 successful deliveries from Hokkaido to Okinawa *For more details, please refer to the PDF materials or feel free to contact us.

  • Tunnel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underground piping seismic reinforcement method "WT method + TNF method"

Construction is possible on weak ground! A method that allows for low cost and short construction time.

The "WT Method + TNF Method" is a seismic reinforcement method for underground piping. It includes the "Underground Tank Rising Section and Base (WT Method)" which achieves a retaining effect through cement slurry improvement using a special mixer, measures against cutting due to tank foundation uplift, and piping reinforcement (seismic) effects achieved through "Underground Piping Surrounding Improvement (WT Method)." Additionally, the "Building Ground Improvement (TNF Method)" prevents differential settlement with powder improvement and eliminates the need for foundation formwork due to its soil formwork design, and the "External Ground Improvement (TNF Method)" provides liquefaction suppression effects through improvement. 【Features】 [WT Method] ○ Construction is possible on soft ground ○ No sheet piles or supports are required ○ Patent Number: No. 4039445 [TNF Method] ○ Construction is possible at low cost and in a short period ○ Patent Number: No. 3608568 For more details, please contact us or download the catalog.

  • Renovation and repair methods
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Internal Pressure Filling Joint Reinforcement Method "IPH Method"

For the long lifespan, prevention of re-deterioration, and regeneration of concrete structures! Construction can be carried out while using the facility!

The "IPH method" involves drilling into the structure and rapidly injecting resin to create airflow, which extracts air from within the cracks and releases it outside, replacing it with resin. This principle allows the resin to fill and penetrate even the finest cracks, curing at ultra-low pressure. As a result, it is a method that can bond and reinforce concrete, integrating and densifying the structure, thereby restoring its strength. 【Features】 ■ High-density filling (replacement of air with resin) ■ Strength recovery and durability improvement ■ Reinforcement against rust and suppression of carbonation ■ Construction can be carried out while the facility is in use *For more details, please refer to the PDF document or feel free to contact us.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete repair and reinforcement method *NETIS: CG-070007-V

Injecting even 0.01 mm fine cracks while removing air! With high density, high depth, and high diffusion filling, extending the lifespan of rebar and concrete structures!

In conventional low-pressure resin injection methods, the resin sometimes fails to reach the internal structure of the concrete due to the obstruction of air inside. With the concrete repair and reinforcement method "IPH method," the resin injected while removing the air present inside the structure can now diffuse radially within the concrete, allowing it to fill even the finest cracks at the ends. By filling in detail, it enhances the adhesion strength between the rebar and concrete, and also provides anti-corrosion effects, as confirmed by technical evaluations from the Japan Society of Civil Engineers. 【Features】 - Extracts air from inside the cracks and releases it outside - Achieves high-density filling through ultra-low-pressure injection - Restores and enhances the strength of the internal structure - Provides anti-corrosion effects, neutralization suppression effects, and measures against salt damage by filling voids - Construction can be carried out while utilizing facilities such as roads, bridges, and buildings *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case Study "RBP Wall Method"

[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.

The "RBP Wall Method" combines reverse bolt paneling and rebar insertion work to prevent collapse by stabilizing cut slopes and natural slopes. It is applicable in areas with low ground stress, places with limited space, and cut areas adjacent to structures, for purposes such as road widening, land development, steep slope countermeasures, fall prevention work platforms, and slope stabilization work. Excavation of the ground is performed using a sloping method that lowers the slope while securing it with reverse bolt panels from the top of the slope. For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Panel formwork hardware "Separat"

Angle with screws for formwork used as auxiliary materials for retaining wall formwork! Hardware developed from on-site work.

"Sepatle" is an angle with female threads for attaching a round separator. It considers the safety and health of workers by reducing the risk of slipping due to oil, which is common during handling, and by minimizing the combustion of adhered oil and the generation of fumes during welding operations. Additionally, by using carefully selected oils, we have reduced the amount of oil adhesion that occurs during the manufacturing process (compared to our company standards). 【Features】 ■ Less likely to become sticky with oil ■ Uses carefully selected oils ■ Reduces the amount of oil adhesion during the manufacturing process ■ Reduces combustion of adhered oil and generation of fumes ■ Considers the safety and health of workers *For more details, please refer to the PDF materials or feel free to contact us.

  • Subsidiary materials
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transparent resin tile pin fixation peeling prevention method "JK Cerider Method"

High waterproofing and barrier properties unique to acrylic resin! Prevents deterioration of exterior walls and contributes to the longevity of buildings.

The "JK Serider Method" is a tile falling prevention method that reinforces tiled exterior walls using a special acrylic resin called "JK Serider," which contains short fibers, and special anchor pins. Thanks to the high waterproofing and barrier properties of the acrylic resin, it prevents the deterioration of exterior walls and contributes to the longevity of the building. The coating is colorless and transparent, preserving the luxurious texture of the tile finish, allowing it to be maintained beautifully over time. 【Features】 ■ Excellent tile falling prevention function ■ Improved durability ■ Colorless and transparent finish *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shear Reinforcement Method "RMA Method"

Construction technology certification acquisition method! No need for mortar mixing or installation of injection holes on site!

The "RMA method" is a shear reinforcement method that allows for reinforcement without encroaching on the inner cross-section of continuous walls. It employs capsules containing premixed mortar as a bonding agent. This method enables construction using impact techniques for long or thick reinforcing bars, making it a post-installed method. Since there is no need for mortar mixing or the installation of injection holes on-site, special management is unnecessary. Reinforcement is carried out only for the insufficient shear capacity, allowing for a transition from shear failure-dominant to bending failure-dominant. 【Features】 ■ Drilling can be done with a small diameter and only once ■ No mixing on-site, maintaining consistent quality ■ Simple product composition and construction method, reducing construction time ■ Minimal interference with existing structural rebar, allowing for reduced re-drilling due to high stopping capability ■ A method that does not use large or special machinery, saving space *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Sewerage facilities
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid seismic reinforcement method

It is a seismic resistance construction method that joins seismic braces using epoxy resin and anchors in two different ways.

Compared to conventional methods, the number of post-installed anchors can be reduced, and since roughening of the existing structure is unnecessary, noise, vibration, and dust can be minimized, allowing for construction while remaining in the building. By adjusting the number of post-installed anchors on the existing framework, reinforcement effects can be secured as needed. Due to the indirect connection with head-mounted studs, the lap length can be reliably secured, ensuring high quality. This method can also be used as a steel brace with openings.

  • ハイブリッド工法7.JPG
  • ハイブリッド工法6.JPG
  • ハイブリッド工法8.JPG
  • ハイブリッド工法9.JPG
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ESP Corporation "Toosui CON Filling Method"

Creating conservation areas that utilize natural landscapes and waterfronts.

The "Tosuicon Filling Method" is a construction technique aimed at preserving and maintaining existing structures while maintaining landscape formation. In response to the deterioration of stone masonry and stone walls in riverbanks, waterways, and residential areas, a plant is set up on-site to inject and fill with Tosuicon (aggregate, cement, water, B.CON + S), which excels in permeability, strength, durability, and workability from joints and cracks, thereby maintaining the stability of the stone masonry and allowing drainage from the joints to suppress piping phenomena. Waterproofing is also possible by changing the materials used. 【Features】 ■ Discharge of backwater is possible ■ Does not encroach on river cross-sections ■ Easy construction in narrow areas ■ Compact plant yard ■ Extension of the pumping hose allows for extensive construction *For more details, please refer to the catalog or feel free to contact us.

  • Company:ESP
  • Price:Other
  • River construction
  • Other construction services
  • stone

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Characteristics of the Tōsui CON Filling Method

Introducing the characteristics of the TOSUI CON filling method for landscape maintenance, cost reduction, and conservation.

The "Tosui CON Filling Method" is a maintenance and preservation measure aimed at extending the lifespan of structures. By pumping permeable concrete, which excels in permeability and workability, into the voids of existing structures through surface openings and injection holes, the filling material functions as a filter material. This method can suppress piping phenomena caused by infiltrating water from the back, thereby enhancing the stability of existing structures. 【Features】 - Existing structures remain as they are, maintaining aesthetics, reducing costs, and preserving integrity. - Has strength comparable to mortar while ensuring permeability. - Compressive strength: 13N–15N/mm² (at 28 days or older). - Does not contain water quality pollutants. - No noise or vibration as there is no demolition of existing structures. *For more details, please refer to the PDF document or feel free to contact us.

  • Company:ESP
  • Price:Other
  • River construction
  • Renovation and repair methods
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of 12 examples of construction methods for stone walls and revetment repairs and reinforcements.

Introducing the construction method of the Tōsui CON filling technique by ESP Co., Ltd.!

Introducing the "Construction Method" of ESP Corporation, which conducts repairs and reinforcements of stone walls and embankments. For the aging of stone masonry and stone walls in embankments, waterways, and residential areas, we install a plant on-site. We inject and fill with Tōsui CON, which excels in permeability, strength, durability, and workability, from joints and cracks to maintain the stability of the stone masonry. By draining from the joints, it is possible to suppress the piping phenomenon. We aim to preserve and maintain stability while maintaining the landscape. *For more details, please refer to the catalog or feel free to contact us.

  • Company:ESP
  • Price:Other
  • River construction
  • Renovation and repair methods
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NETIS Registration "Tosui CON Filling Method" *Introduction of 12 Construction Method Examples

Creating conservation efforts that utilize natural landscapes and waterfronts.

The "Tosui CON filling method" is a construction technique aimed at preserving and maintaining existing structures while maintaining landscape formation. In response to the deterioration of stone masonry and stone walls in riverbanks, waterways, and residential areas, a plant is set up on-site to inject and fill with Tosui CON (aggregate, cement, water, B.CON + S), which excels in permeability, strength, durability, and workability, thereby stabilizing the stone masonry and preventing piping phenomena by draining water from the joints. It is also possible to achieve waterproofing by changing the materials used. The catalog includes 12 case studies of construction methods for large-scale river improvement projects, riverbank repair work, river disaster recovery projects, and fishing port repair work. 【Features】 ■ Capable of discharging backwater ■ Does not encroach on river cross-sections ■ Easy construction in narrow areas ■ Compact plant yard ■ Extended pumping hoses allow for extensive construction *For more details, please refer to the catalog or feel free to contact us.

  • Company:ESP
  • Price:Other
  • Civil Engineering Method
  • River construction
  • Other construction services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration