Pile construction method Product List and Ranking from 33 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

Pile construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

  1. 菱建基礎 本社 Tokyo//General contractors and subcontractors
  2. 朔鷹 Osaka//Other construction industries
  3. 大亜ソイル Tokyo//Other construction industries
  4. 4 ジオテック Tokyo//Other construction industries
  5. 5 ジャストワン Saitama//Other construction industries

Pile construction method Product ranking

Last Updated: Aggregation Period:Sep 09, 2026~Oct 06, 2026
This ranking is based on the number of page views on our site.

  1. Hang Work Method: "SKT (Skat) Method" 朔鷹
  2. [NETIS Registration] Preventing Excessive Outflow of Ready-Mixed Concrete! "Resophon Pier Method" 大亜ソイル
  3. Vibratory Tremie Method for Cast-in-Place Concrete Piles 菱建基礎 本社
  4. 4 Steel Pipe Pile Method "JUST-ES (Justice Method)" ジャストワン
  5. 5 Earth Drill Expansion Pile (newACE) Method 菱建基礎 本社

Pile construction method Product List

31~60 item / All 108 items

Displayed results

Rotary Driven Steel Pipe Pile "TG Pile Method"

Minister of Land, Infrastructure, Transport and Tourism certified construction method! It achieves high construction quality while minimizing disruption to the ground.

The "TG Pile Method" is a steel pipe pile construction method that achieves smooth penetration through a combination of a tip shape with good excavability and a rotating wing. Due to the tip shape that minimizes high stopping, the need for pre-excavation is reduced, allowing for improved construction speed and cost reduction. Additionally, unlike ground improvement methods using cement-based solidifiers, there is no leaching of hexavalent chromium into the ground or groundwater, and there is no soil contamination from carcinogenic substances. 【Advantages】 ■ Increased construction speed ■ High construction quality and high bearing capacity ■ Suitable for construction in narrow spaces ■ Low noise and low vibration ■ No residual soil, etc. *For more details, please download the PDF or feel free to contact us.

  • Pile and foundation work
  • Civil Engineering Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Work Engagement Diagnosis

Easily visualize the work engagement status of employees (both organization-wide and individual) with a simple 10-minute survey!

By simply answering a few simple questions, you can diagnose each individual's "engagement" status and automatically generate challenges and improvement advice for both individuals and the entire organization! Just by answering questions online that take about 10 minutes, you can diagnose the respondent's "engagement" status and the functionality and health of the multifaceted elements involved in work engagement! You will receive insights into the strengths and challenges of work engagement, as well as prescriptions for solutions and improving "engagement." ★ Essentially, an infinite number of diagnoses and advice are automatically generated.

  • others
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic machinery

It demonstrates its power in demanding work conditions.

Our company handles "foundation machinery" that demonstrates its power in demanding work conditions. We offer a variety of products, including the "RX2300," which makes it easy to perform pulling operations with auger screws and sheet piles, and the "CCH300T-2," which can be used for various applications as a power source for vibrators and augers. Please feel free to contact us if you have any requests. 【Product Lineup】 ■RX2300 ■SRX2700 ■RX3300 ■CCH300T-2 ■CCH500T, etc. *For more details, please download the PDF or contact us.

  • Foundation construction machinery
  • Crane and others
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Retaining Wall Health Assessment Service

Leave the assessment of the retaining wall's condition to us.

We offer wall integrity diagnosis services. In surface wave exploration, vibrations are generated by striking the surface of the wall, and these vibrations are captured by sensors to measure the S-wave velocity of the wall structure and the backfill soil. The S-wave velocity can also be used to evaluate whether the wall is dry-stacked or mortared. Additionally, we address issues related to ground stability, such as concerns about "the impact of neighboring construction," "worries about the yellow zone," and "concerns about fill in valleys." 【Methods for Wall Integrity Diagnosis】 ■ Visual inspection of aging walls - Deformation survey through close visual inspection - Evaluation using a scoring method ■ Surface wave exploration (recommended) - Integrated diagnosis of the structure - Evaluation based on S-wave velocity, etc. *For more details, please download the PDF or feel free to contact us.

  • Structural Survey
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work [Performance certification method] Σ-i method

A culmination of all the elements necessary for steel pipe piles.

Compatible with all types of ground The Σ-i method is a highly versatile ground reinforcement technique that is compatible with all types of ground, including sandy, gravelly, and clayey soils. Design using the converted N values from SWS tests (screw weight penetration tests) and ram sounding tests is possible.

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work ETP method [Certified method]

Ministerial certification and performance proof acquisition for advanced winged rotary driven steel pipe piles ETP method.

The ETP method is a type of rotary driven steel pipe pile construction that features a tip with a disc-shaped wing and a triangular excavation auxiliary bit. It has received certification from the Minister of Land, Infrastructure, Transport and Tourism (for sandy soil: TACP-0665, for clayey soil: TACP-0666) and a performance certification from the General Incorporated Foundation Japan Building Disaster Prevention Association (GBRC Performance Certification No. 12-20 Rev. 4), ensuring high bearing capacity and smooth construction. By avoiding the use of cement, it mitigates the risk of soil and groundwater contamination, and the no-excavation construction eliminates the need for soil disposal costs. Additionally, it allows for the removal of piles through reverse rotation and employs compact machinery, enabling low-noise and low-vibration construction, thus achieving an economical design and construction that considers the surrounding environment.

  • Renovation and repair methods
  • Residential foundations
  • Other civil engineering works
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Tackling narrow residential areas with a low-noise DM method that generates zero residual soil.

Construction with zero residual soil through non-discharge rotary penetration techniques and low noise, low vibration technology. Considerate of the surrounding environment, the ground reinforcement work in densely populated residential areas with limited space is completed smartly.

The "DM Method (Double Metal Method)" provided by Geotech Co., Ltd. is a small-diameter steel pipe pile ground reinforcement method that solves on-site environmental issues with non-disposal construction that generates no construction waste, along with low noise and low vibration technology. In ground reinforcement work that builds safe foundations, this method eliminates the use of cement milk and performs rotary penetration, thereby reducing the costs of disposing of excess soil and transportation. Because it can be installed using a compact small-scale construction machine, smooth construction can be carried out even in narrow sites with limited road widths or in densely populated residential areas adjacent to other properties. Its unique structure, which secures large ductile cast iron tip wings with bolts on-site, achieves high bearing capacity and is based on reliable design standards certified by GBRC (No. 10-01). Through in-house manufacturing management, a nationwide network of construction companies, and real-time tracking management of construction data, we deliver high-quality and reliable ground guarantees while minimizing environmental impact on neighboring areas.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.

Bolt connections that do not require on-site welding and rotary insertion construction that does not require curing. This eliminates the risk of delays in the process and enables speedy ground reinforcement work.

The "DM Method (Double Metal Method)" developed by Geotech Co., Ltd. is a small-diameter steel pipe pile ground reinforcement method that achieves a dramatic improvement in construction speed and compression of construction periods. In ground reinforcement work to prevent building settlement accidents, this method employs a unique structure that fixes ductile cast iron tip wings with bolts on-site, reducing construction time and waiting time associated with traditional welding work. Additionally, because it uses a rotary penetration method that does not require cement, there is no curing time needed, allowing for immediate transition to the next process after completion of the pouring. The use of a no-dirt construction method that generates no residual soil and compact construction machinery enables efficient work even in narrow sites. It has obtained the GBRC performance certification (No. 10-01) from the General Incorporated Foundation Japan Building Disaster Prevention Association, allowing for high-precision and speedy foundation design based on SWS test data. With a supply system for components from its own factory, rapid construction response from construction association members nationwide, and real-time construction data management, it provides high technical reliability and a reliable ground guarantee.

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Preventing nearby site troubles with low-noise, no-dumping DM method.

Low noise and low vibration construction with a no-dirt-disposal technology that does not use cement. This minimizes the impact on the surrounding environment and enables ground reinforcement work in densely populated residential areas that is friendly to nearby residents.

The "DM Method (Double Metal Method)" provided by Geotech Co., Ltd. is a small-diameter steel pipe pile ground reinforcement method that thoroughly considers neighboring areas with clean construction characterized by low noise, low vibration, and zero residual soil. In ground reinforcement work to prevent building settlement issues, this method performs rotary insertion without using any cement milk, completely eliminating the discomfort of muddy water and the generation of construction residual soil. There is no concern about dirtying the surrounding area or the front road, and the costs associated with residual soil disposal and transportation can be significantly reduced. Due to its quiet design that minimizes noise and vibration, it can smoothly complete work without causing neighborhood troubles, even in densely populated residential areas or quiet neighborhoods where the distance to neighboring properties is very close. The large tip wings made of ductile cast iron, fixed with bolts, achieve high tip support strength and are based on reliable technical standards that have obtained GBRC performance certification (No. 10-01). Through manufacturing management at its own factory, a construction system by certified contractors nationwide, and tracking management of insertion data using construction management devices, we deliver high-quality foundation construction with low environmental impact and a reliable ground guarantee.

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground investigation option "Surface Wave Exploration Method"

Now, earthquake measures start from the ground! We can calculate how much the investigation site will shake.

The damage caused by earthquakes varies depending on the magnitude of the earthquake and the hardness of the ground. During the Great East Japan Earthquake in 2011, even areas far from the epicenter experienced damage to buildings, including structural damage and collapses. One of the factors contributing to this is believed to be the hardness of the ground. The magnitude of an earthquake is influenced by the ground strength and layer thickness as the earthquake occurs in an engineering foundation (where seismic waves travel at over 400 m/s) and propagates through the ground. In other words, if the ground is soft and the layer thickness is large, the ground shaking will be more intense. The investigation of ground shaking susceptibility calculates the necessary coefficient Co to determine seismic forces based on the results of ground surveys conducted through "surface wave exploration." It is possible to estimate seismic forces taking into account the ground conditions of the survey site.

  • Earthquake-proof and vibration-damping equipment
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Site and ground investigation
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile method / Steel pipe soil-cement pile method "Gantetsu pile method"

Both the circumferential frictional force and the tip support force exhibit very stable performance.

The Gantetsu Pile Method consists of "steel pipe soil cement piles," which are made up of a solidified body (soil cement column) constructed by injecting and mixing cement milk into the ground, along with steel pipes with external protrusions. This method is a "low-discharge pile method" developed to contribute to the reduction of construction-generated soil. There are two construction methods: TYPE I, which involves simultaneous embedding of steel pipe piles, and TYPE II, which involves post-embedding. 【Features】 ○ Publicly recognized method ○ High bearing capacity characteristics and cost-effectiveness ○ High structural reliability ○ Contributes to the environment ○ High-quality and efficient construction For more details, please contact us or download the catalog.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Zypex Method (Zypex / Inorganic Cement Crystal Growth Material)

A formidable concrete modifier that boasts achievements in approximately 70 countries worldwide, utilizing self-repair and densification of concrete as its strengths.

The main material of the Zaipex construction method, Zaipex Concentrate, has gained a reputation since addressing the water leakage issues during the excavation of the "Seikan Tunnel," which once showcased Japan's civil engineering technology as the world's longest underwater tunnel. It has spread through word of mouth from craftsmen who have actually used it on-site, earning a significant share and trust as a pioneer in concrete modification materials. The evaluations accumulated from customers and the reliable "10-year warranty" are a testament to our confidence.

  • Bridge Construction
  • Dam construction
  • Renovation and repair methods
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Zypex method (inorganic cement crystalline growth material)

Proliferate cement crystals in the defective areas! This will densify the concrete structure itself.

The "Zaipex Method" is a construction method that uses the concrete modification material "Zaipex" to block the penetration of water and harmful substances, thereby improving durability performance. A concentrated powder is mixed with a specified amount of clean water to create a paste, which is then applied or sprayed onto the surface of the concrete. Catalytic compounds penetrate deep into the concrete (approximately 30 cm), promoting the growth of new cement crystals in capillary voids and crack interfaces, thereby densifying the concrete structure itself. 【Features】 ■ Catalytic compounds penetrate deep into the concrete (approximately 30 cm) ■ New cement crystals proliferate at crack interfaces ■ Densification of the concrete structure itself *For more details, please refer to the external link or PDF materials, or feel free to contact us.

  • Special Construction Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally Friendly Piling Method "E-Zet"

We maintain a well-balanced basic performance necessary for the pile driving method.

The environmentally friendly screw pile EAZET method, which features low noise, low vibration, and zero soil displacement, has recently updated and modified its technical review certification from the National Institute for Land and Infrastructure Management. We aim for further growth as a pile method for civil engineering structures. Our unique pile shape and installation method maintain a balanced performance of essential characteristics required for pile methods, such as driving force and pull-out performance. 【Features】 ○ Environmentally conscious pile method For more details, please contact us or download the catalog.

  • Earthworks
  • Ground improvement
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low Discharge High Friction Method "ATT Column"

Environmentally friendly low-emission high-friction construction method "At Column"

The ATT column is a hybrid pile that combines a highly reliable columnar improvement body with "winged steel pipes" that utilize the techniques of the screw pile EAZET method within the improvement body. By integrating the column and the winged steel pipes, it achieves a significant bearing capacity. This is particularly advantageous in cases where the supporting ground is deep, demonstrating excellent economic efficiency. 【Features】 ○ Exhibits large vertical and horizontal forces ○ Demonstrates high pull-out bearing capacity For more details, please contact us or download the catalog.

  • Earthworks
  • Ground improvement
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement "Alpha Force Pile Method"

Rotary Pile Driving Steel Pipe Method (Ministry of Land, Infrastructure, Transport and Tourism Certified Method / Building Technical Performance Certification Method)

The "Alpha Force Pile Method" is a ground reinforcement technique using steel pipe piles with a tip expansion wing. It is designed for foundation piles for single-family homes, multi-family residences, and mid- to low-rise buildings. The spiral wing (tip expansion wing) attached to the tip of the steel pipe pile allows for smooth penetration to a hard bearing layer without disturbing the surrounding ground, and it does so quickly and without soil displacement or vibration, thereby supporting buildings and structures. The tip expansion wing provides high bearing capacity. This method is certified by the Minister of Land, Infrastructure, Transport and Tourism (TACP-0240, TACP-0241) and is a certified construction technology performance method (GBRC Performance Certification No. 06-01). 【Features】 ○ Applicable Ground → Tip Ground: Sandy Ground (Gravelly Ground) / Clayey Ground → Surrounding Ground: Sandy Ground / Clayey Ground ○ Construction Noise: Engine Noise (Low) ○ Construction Water: Not Required ○ Generated Soil: None For more details, please contact us or download the catalog.

  • Ground foundation construction method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hang Work Method: "SKT (Skat) Method"

No restrictions on the installation site. A piling method with high mobility and precision.

The SKT (Skutt) method is a high-precision pile driving technique that directly attaches an earth auger to the boom of a rough-terrain crane. The biggest feature is that it can be used in any location. It has the turning capabilities of a crane, allowing it to operate in narrow urban areas, uneven terrain, slopes, and embankments, making it suitable for all kinds of sites. Additionally, assembly, movement, and disassembly are easy, resulting in significant time savings. 【Features】 ○ Equipped with an earth auger on a rough-terrain crane → Enables lightweight design and quick movement ○ Can access narrow sites in urban areas ○ Strong in constrained locations → A special earth auger method that does not require specific locations ○ Capable of driving piles on uneven surfaces or at distant locations ○ Adoption of a forced excavation mechanism → Increases excavation power against hard bedrock, boulders, and underground obstacles For more details, please contact us or download the catalog.

  • Ground foundation construction method
  • Special Construction Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile method

In the case where there is a solid ground at a depth that cannot be improved by the columnar improvement method, the construction is vibration-free and noise-free.

This technology uses steel pipe piles to rotate and penetrate to the supporting layer to obtain bearing capacity. By transmitting the load of the structure through the piles to a solid foundation, it aims to secure bearing capacity and suppress settlement. This method is used when there is a thick layer of soft ground and a solid foundation at a depth that cannot be improved by columnar improvement methods. Additionally, the construction is vibration-free and noise-free. 【Features】 ■ Construction is possible to a depth of approximately 35 meters ■ Steel pipe piles are lighter compared to concrete piles, making handling and construction easier ■ By transmitting the load of the house through the piles to a solid foundation, it aims to secure bearing capacity and suppress settlement *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock foundation pile driving "Clay Drill Method"

Responding to various construction conditions! A method to replace large-diameter boring machine methods.

The "Clay Drill Method" is a technique that uses a special auger screw, a hydraulic rotary device, and air from a large compressor to drill holes, serving as an alternative to large-diameter boring machine methods. Compared to conventional methods, the drilling speed is extremely fast, and since it does not use mud water, it is advantageous in terms of cost reduction due to improved work efficiency and consideration for the environment. Additionally, it can be implemented on slopes and in areas where transportation is difficult, allowing for a wide range of applications. 【Features】 ■ Fast construction speed ■ High vertical accuracy ■ No use of mud water ■ Adaptable to various construction conditions *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • Special Construction Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Earth Drill Type Enlarged Base Pile Method "SY Method"

A cast-in-place concrete enlarged base pile method that allows for a fivefold increase in bearing capacity even in narrow sites.

The "SY Method" is a new cast-in-place concrete enlarged base pile method that achieves a large bearing capacity by excavating the enlarged base diameter to more than twice the shaft diameter. With a mechanical bucket, it is possible to construct enlarged base piles with five times the bearing capacity even in narrow sites. It also accommodates high-strength concrete with a design standard strength of up to 45 N/mm². 【Features】 ■ Maximum enlarged base diameter φ4700mm ■ 4.84 times high bearing capacity ■ Suitable for narrow sites ■ Compatible with all casing ■ Reliable construction management *For more details, please download the PDF or contact us.

  • Earthworks
  • Road construction
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Full rotary cast-in-place concrete pile enlarged base method (GSB method)

The maximum base diameter is 3000mm, and a maximum slope angle of 12 degrees can be constructed. The excavated soil can be recycled as general surplus soil.

This technology is a full-casing enlarged pile construction method that can build enlarged piles in soft rock and medium-hard rock support layers. An enlarged excavation device called the GSB bucket is attached to the tip of the casing of a general-purpose full-rotation drilling machine, and the bottom of the hole is enlarged using the rotational torque of the full-rotation drilling machine and the hydraulic telescopic arm of the GSB bucket. Since the amount of casing penetration and the extension of the arm can be managed in 1 cm increments, it allows for the construction of inclined sections with a maximum inclination angle of 12 degrees. 【Features】 ■ Enlarged excavation can be performed in very hard rock ■ Minimal pile core deviation and high vertical accuracy ■ Simple equipment for enlarged excavation ■ Adaptable to changing ground conditions ■ Capable of handling underground obstacles within a series of drilling processes *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Diameter Steel Pipe Pile Method "High-Spec Micro Pile Method"

Construction is possible at low heights of around 3.5 meters or on scaffolding! It can also be applied to new construction work under harsh conditions.

The "High-Spec Micro Pile Method" is a small-diameter steel pipe pile method for seismic reinforcement of existing structures. It can be constructed in narrow spaces and is economically advantageous, making it suitable for new construction projects under strict conditions where structures are in close proximity. The construction of this method involves using a boring machine to perform double-tube drilling, erecting the steel pipe, and then filling it with grout to secure the steel pipe in the ground. 【Features】 ■ Can be constructed in low-headroom areas ■ Cost reduction can be achieved ■ Suitable for maintenance work ■ Environmentally considerate construction *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hang construction method "EAZET"

Active in various fields of architecture and civil engineering! Suitable solutions brought by four characteristics.

In our construction materials business, which is engaged in foundation work, we conduct comparative studies of construction methods and propose suitable methods. "EAZET" is a pile construction method that has high performance as a piling method, reliability based on a manufacturer responsibility construction system, compactness during construction, and environmental performance demanded by the times. These four characteristics have been the concept behind our continuous improvement of product performance. Starting with pile construction in residential areas, urban areas, and narrow sites, it is also used for renovations of existing buildings, pile construction within factories and plants, elevator installations, railway fields, and for seismic reinforcement and seismic retrofitting, actively contributing to various fields of architecture and civil engineering. 【Features】 ■ Reliability ■ High performance ■ Compact ■ Environmentally friendly *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Pile and foundation work
  • Piles, caissons, sheet piles
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earth Drill Type Enlarged Base Pile Method "HND Method"

By systematizing the construction management device, we will ensure the reliable execution of expanded shapes and hole bottom treatment!

The "HND method" is a construction technique that involves using an earth drill excavator's drilling bucket to excavate the shaft of a pile to a specified depth in the bearing layer, and then using a bell-shaped bucket to expand the excavation in a conical shape, creating a cast-in-place concrete pile with a larger tip area. As a result, it achieves bearing capacity equivalent to that of a straight pile, and compared to straight piles with the same load-bearing capacity, it significantly reduces the amount of excavated soil and concrete, allowing for not only a shortened construction period but also cost savings. 【Features】 ■ By using a belled pile, equivalent bearing capacity can be achieved even with a smaller shaft diameter. ■ Reduction in concrete volume and excavated soil volume. ■ Reduced environmental impact. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Pile and foundation work
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic Pile Foundation Method "CHR Method"

Piling construction is possible even in narrow tracks! Construction method suitable for low headroom and confined spaces.

The "CHR method" is an economical foundation pile construction method that excels in the installation of steel pipe piles under strict conditions, such as headroom restrictions below girders and constraints on work areas, which have made construction difficult. It is possible to install wing piles with a pile diameter of φ318.5 to 700 mm and a maximum wing diameter of 2.5 times the diameter (screw-type micro piles have pile diameters of φ216 mm and 267 mm) in low headroom and narrow spaces. With low vibration and low noise, and compliant with exhaust gas regulations (off-road law), this method minimizes noise, vibration, and environmental impact, making it suitable for construction in tight spaces. 【Features】 ■ Enables railway construction using wing piles ■ Achieves low vibration and low noise ■ Environmentally friendly construction without soil displacement ■ Introduction of a comprehensive construction management system *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Civil Engineering Method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tsubasa pile (steel pipe rotary driven pile)

Achieving high tip support capacity! An environmentally friendly construction method with no soil disposal, low vibration, and low noise.

The "Tsubasa Pile (Steel Pipe Rotational Press-in Pile)" is a method that involves rotating a steel pipe pile equipped with semicircular steel plates (tip wings) at the tip, which are installed in a crossed manner, to penetrate the ground with low noise and low vibration. The tip wings are expanded to 1.75 to 2.5 times the pile diameter, contributing to a significant tip bearing capacity when functioning as a pile, and providing thrust to the pile during the rotational penetration process. There are two types of tip shapes: "closed-end type" and "open-end type." Inclined piles that can respond to horizontal forces are also possible. 【Features】 ■ Achieves large tip bearing capacity ■ Environmentally friendly construction method ■ Cost reduction ■ By using an enlarged head structure, it has horizontal resistance, excellent seismic performance, and reduced costs ■ Easy to remove *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • image_03.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rotary Pile Method "NS Eco Pile(R)"

Rotary pile method applicable as temporary piles!

The "NS Ecopile(R)" is a foundation pile method that involves rotating and pressing steel pipe piles with spiral-shaped steel plates (blades) welded to the tip of the steel pipe. Large diameter piles are driven using a full-circle rotary pile driver, while medium and small diameter piles are driven using self-propelled small pile drivers, allowing the piles to penetrate the ground with the thrust of the tip blades, similar to a wood screw. 【Features】 ■ Environmentally friendly "completely non-discharging method" ■ High vertical bearing capacity and pull-out resistance ■ Pull-out and recovery are possible ■ A wide range of pile diameters and construction machinery options ■ High applicability in narrow spaces, under height restrictions, and near structures (medium and small diameters) *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Pile construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration