Foundation Method Product List and Ranking from 35 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Foundation Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. エルニード協会 Kagawa//Other construction industries
  2. null/null
  3. E&Dテクノデザイン Aichi//Construction Consultant
  4. 4 リアス Tokyo//Construction Consultant
  5. 4 新品川商事 Osaka//Building materials, supplies and fixtures manufacturers

Foundation Method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Super Rappuru Basic Construction Method (El Nido Method) Technical Documentation エルニード協会
  2. Simple Fabric Foundation Method "Spike Frame Method"
  3. Rubble Concrete Super Rubble Elneed Method エルニード協会
  4. 4 [NETIS Registration] Simple Foundation Method "Pin Foundation"
  5. 5 Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method. エルニード協会

Foundation Method Product List

46~60 item / All 139 items

Displayed results

Super Rappuru El Nido Method <Over 3,000 construction achievements nationwide>

Shortening the time from excavation to completion of land development! It is easy to confirm the supporting layer through visual inspection and palpation.

The "Super Rappuru Elniido Method" utilizes on-site excavated soil during construction, allowing for a reduction in disposal costs for excess soil. It addresses challenges such as the complexity of processes like excavation and formwork placement in methods like the Rappuru Method (concrete pouring), seeking a more simplified approach. This method enables a reduction in processes through direct excavation, leading to shortened construction periods and lower costs. Additionally, we are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, boasting over 3,000 construction achievements nationwide. 【Three Strengths】 ■ Shortened construction period and reduced costs ■ Easy verification of support layers and high quality ■ Minimal excess soil after construction *For more details, please download the PDF or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • フロー値.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Play equipment: sandbox and wooden deck

Play equipment: sandbox and wooden deck

The existing sandpit has been enclosed with a wooden deck, making the entire area easier to use. 【Features】 ○ The entrance area has been renovated with a wooden deck. ○ This is a renovation of an old sandpit. ○ We created sandpits of different heights by utilizing the steps of the wooden deck. ○ We made a terraced sandpit by utilizing the slope. ○ A narrow sandpit has been transformed into a two-story play facility with a sandpit. ○ A wooden ramp has been created for wheelchair users. ● For other functions and details, please contact us.

  • Playground equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration