rack Product List and Ranking from 235 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Feb 25, 2026~Mar 24, 2026
This ranking is based on the number of page views on our site.

rack Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Feb 25, 2026~Mar 24, 2026
This ranking is based on the number of page views on our site.

  1. サス・サンワ 大阪本社 Osaka//Trading company/Wholesale
  2. ビシクレット Tokyo//others
  3. ニチプレ 本社・尼崎工場、東京営業所・東京工場、札幌・仙台・名古屋・広島・九州営業所、山口工場 Hyogo//Building materials, supplies and fixtures manufacturers
  4. 和研ハーディ 岡山本社 Okayama//Building materials, supplies and fixtures manufacturers
  5. 5 カナフジ電工 Saitama//Electrical equipment construction business

rack Product ranking

Last Updated: Aggregation Period:Feb 25, 2026~Mar 24, 2026
This ranking is based on the number of page views on our site.

  1. Bicycle parking rack 2-tier cycle rack: AL-21GS+ALS-220 サス・サンワ 大阪本社
  2. PVC Steel Plate "Silence Roof" ニチプレ 本社・尼崎工場、東京営業所・東京工場、札幌・仙台・名古屋・広島・九州営業所、山口工場
  3. New wire-type system! Wiring cable rack 'Mirac Ladder' 未来工業
  4. 4 Bicycle Rack 2-Tier Cycle Rack 'AL-21G' サス・サンワ 大阪本社
  5. 5 Bicycle parking rack 2-tier cycle rack 'AL-OVS+ALS-220' サス・サンワ 大阪本社

rack Product List

541~570 item / All 1190 items

Displayed results

[Case Study of Steel Rack Implementation] Installed as a Substitute for a Dish Cabinet

Tableware can be stored up to 300 kg per tier! A case study with earthquake-resistant options included.

We would like to introduce a case where six medium-duty steel racks (load capacity of 300kg per shelf) were installed as a substitute for a cupboard. This product is a bolt-less type that can be assembled without using a single bolt. Each component can be fixed by inserting the claw part into the hole and striking it with a rubber hammer (combination hammer). Compared to conventional bolt-fixed types, it significantly reduces assembly time and allows anyone to assemble it accurately without mistakes. Additionally, for earthquake measures, a "tipping prevention base" was purchased, which increases the contact area with the floor, making it more resistant to lateral shaking from earthquakes and impacts. [Case Overview] ■ Type: Medium-duty steel rack ■ Load capacity: 300kg per shelf ■ Quantity: 6 units *For more details, please refer to the PDF document or feel free to contact us.

  • Shelves and racks
  • Storage
  • Storage furniture
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Steel Rack Implementation] Installed in New Warehouse (Tokyo)

A case where our company was responsible for the entire process from proposing the warehouse layout to estimating, delivery, and assembly construction.

We understand that you are considering the introduction of commercial steel racks in your new warehouse. We have taken charge of the entire process, from layout proposals to estimates, delivery, and assembly. The "steel racks (load capacity 150kg/shelf)" placed in the center of the warehouse are connected to adjacent racks using "connecting fittings," which are one of the optional items. By grouping multiple steel racks together, the contact area with the floor increases, thereby enhancing seismic resistance. Our company also offers free consultations on layout, seismic resistance, and anti-tipping measures. Please feel free to contact us. 【Case Overview】 ■ Prefecture: Tokyo ■ Type: Lightweight and medium-weight steel racks (anti-tipping, front-back and side-side connection) ■ Load Capacity: 150kg/shelf for 6 units, 200kg/shelf for 5 units *For more details, please refer to the PDF materials or feel free to contact us.

  • Shelves and racks
  • Storage
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Can a steel rack be used as a fish tank stand (60cm, 90cm, etc.)?

Pay attention to weight! An introduction to points to consider when choosing a fish tank stand and how to utilize steel racks.

One of the concerns when starting an aquarium is finding a stand for the tank. A tank filled with water is heavier than you might expect. If the stand is not suitable for the weight of the tank, it could warp over time or even break. Therefore, it is not recommended to place the tank on television stands, low boards, metal racks, color boxes, cabinets, or homemade shelves made from angles, aluminum frames, or wood that do not have sufficient weight capacity. That’s why we recommend a "steel rack" that can support weights of up to 500 kg. Many people use it as a tank stand because the shelves are almost flat and sturdy. You can view more detailed information on the blog through the related links, so please take a look. *For more details, please refer to the PDF materials or feel free to contact us.

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dust prevention for steel racks! Let's use a transparent dust cover.

I will introduce the causes of dust accumulation on steel racks and measures using dust covers.

"Although I have installed a steel rack, dust accumulates." Many people may have such concerns. Especially when items are stored for a long time without being taken out, a large amount of dust can accumulate. Additionally, electronic and precision equipment is particularly sensitive to dust, so caution is necessary. If you are storing items outdoors or in a warehouse, shed, or garage without moving them for an extended period, we recommend using a "transparent vinyl cover (dust cover)." You can view the detailed content of the blog through the related link, so please take a look. *For more details, please refer to the PDF document or feel free to contact us.

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Is there compatibility with steel racks? Status of compatibility between manufacturers.

This provides a detailed explanation of the compatibility (suitability) that should be considered when making connections!

Typically, when purchasing multiple steel racks from the same retailer, it is possible to connect the second and subsequent units. A point to note here is the presence or absence of compatibility. Generally, when choosing compatible steel racks, the following three factors must be the same: "manufacturer," "series," and "load capacity." Additionally, even if compatibility exists, it is necessary to specify the same size for "height" and "depth." You can view the detailed content of the blog through the related links, so please take a look. *For more details, please refer to the PDF materials or feel free to contact us.*

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Install the steel rack without the bottom shelf (open bottom)!

Recommended for trash can storage! It can be easily slid out as is, making it very convenient!

We have started offering a set that allows you to install a steel rack without the bottom shelf (bottom open) in response to customer requests to remove the bottom shelf of the steel rack. By utilizing the bottom open set, you can install the bottom shelf higher than the specified position, allowing you to place items directly on the floor. Additionally, you can also use the steel rack to store chairs, making it a substitute for a desk or work desk. You can view the detailed content on our blog through the related links, so please take a look. *For more details, please refer to the PDF document or feel free to contact us.

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introducing the "anti-tipping base" for steel racks! Recommended for rental properties.

We have prepared earthquake prevention options so that you can use the steel rack with peace of mind.

We offer a set sale of steel racks and anti-tipping bases (anti-tipping fittings). All products are high-quality, manufactured domestically, and excel in stability and durability, suitable for various locations such as factories, warehouses, stores, offices, and homes. We provide free estimates, drawing creation, and layout consultations. Our specialized staff, well-versed in logistics equipment, will propose earthquake countermeasures tailored to your environment, so please feel free to contact us. You can view the detailed content of our blog through the related links, so please take a look. *For more details, please refer to the PDF materials or feel free to contact us.

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ボルトレスラックとは?組立時間を約3分の1に大幅短縮

棚板の高さ変更が簡単!倉庫、工場、事務所、店舗、ご自宅などで豊富な導入実績があります

業務用スチールラックの導入を検討しているなら、組立簡単な ボルトレスラック(ボルトレス棚)をおすすめします。 当社からボルトレスラックをご購入の場合は、10年間のメーカー保証も 付いています。 また、組み立てが不安という方のために「あんしん返品保証」も追加料金なしで 自動適用されています。 こちらは"どうしてもスチールラックを組み立てられない"というときに 負担ゼロで返品ができ、購入費用も全額返金されるサービスです。 専門スタッフによる図面作成やレイアウトのご提案も行っていますので、 これからスチールラックの導入をご検討中の方はお気軽にお問い合わせください。 ブログの詳細内容は、関連リンクより閲覧いただけますので、 ぜひご覧ください。 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A site with a rectangular shape that is particularly long in one direction and requires scaffolding.

A rack scaffolding method that allows for resource-saving! The longer the distance of movement, the more economically advantageous it becomes.

The "Rack Scaffold (R)" is a mobile suspended scaffold that uses two rack rails installed on a structure as its track. After installing the rack scaffold mobile floor, only the extension work of the rack rails, which serve as the track, is required, allowing for a significant reduction in construction time for scaffold work. It can demonstrate its characteristics in various sites, and in "sites where the shape requiring scaffolding is particularly long in one direction," after installing the rack scaffold mobile floor, only the extension of the running rails is needed, making it more economical the longer the travel distance. 【Features of Rack Scaffold (R)】 ■ High safety ■ Quick installation possible ■ Excellent economy ■ Material savings possible ■ Compatible with various shapes of structures *For more details, please refer to the PDF document or feel free to contact us.

  • image_138.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【施工事例】足場の吊元となる主構が離れている現場

吊元は左右の走行レール2条だけ!主構が離れていても設置可能なラック足場工法

『ラック足場(R)』は、構造物に取り付けた2本のラックレールを 軌道とする移動式吊足場です。 ラック足場移動床を設置した後は、軌道となるラックレールの 延長作業のみとなり、足場工の大幅な工期短縮が実現。 様々な現場で特性を発揮することができ、“足場の吊元となる主構が 離れている現場”では、ラック足場の吊元は左右の走行レール2条だけ であるため、主構が離れていても設置可能です。 【ラック足場(R) 特長】 ■高い安全性 ■迅速な施工が可能 ■優れた経済性 ■省資材化が可能 ■様々な形状の構造物に対応可能 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rapidly installing scaffolding at night when the factory is not in operation.

High safety and rapid construction possible! Examples of rack scaffolding methods with minimal work on factory equipment.

The "Rack Scaffold (R)" is a mobile suspended scaffold that uses two rack rails installed on a structure as its track. After installing the rack scaffold mobile floor, only the extension work of the rack rails, which serve as the track, remains, allowing for a significant reduction in the construction period for scaffold work. It can demonstrate its characteristics in various sites, and in locations where "there is a need to quickly install scaffolding during the night when the factory is not in operation," only the extension of the running rails is required after the installation of the rack scaffold mobile floor, enabling rapid scaffold installation. 【Features of Rack Scaffold (R)】 ■ High safety ■ Quick construction possible ■ Excellent cost-effectiveness ■ Resource-saving possible ■ Compatible with various shapes of structures *For more details, please refer to the PDF materials or feel free to contact us.

  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A site that requires rapid response to changes in the level of the work surface.

Level changes can be made with just a change in the hanging material length! Specific examples of sites where the characteristics of the rack scaffolding method can be demonstrated.

The "Rack Scaffold (R)" is a movable suspended scaffold that uses two rack rails installed on a structure as its track. After installing the movable floor of the rack scaffold, only the extension work of the rack rails, which serve as the track, is required, allowing for a significant reduction in the construction period for scaffold work. It can demonstrate its characteristics in various sites, and in locations where "there is a need to quickly respond to changes in the level of the work surface," level changes can be made quickly and easily by simply adjusting the length of the suspended material of the rack scaffold. 【Features of Rack Scaffold (R)】 ■ High safety ■ Quick installation possible ■ Excellent cost-effectiveness ■ Resource-saving possible ■ Compatible with various shapes of structures *For more details, please refer to the PDF materials or feel free to contact us.

  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Bridges on Shipping Routes

A rack scaffolding method that minimizes the impact on navigating vessels! Here are some specific examples from the field.

The "Rack Scaffolding (R)" is a mobile suspended scaffold that uses two rack rails installed on a structure as its track. After installing the rack scaffolding mobile floor, only the extension work of the rack rails, which serve as the track, remains, allowing for a significant reduction in the construction period for scaffold workers. It demonstrates its characteristics in various sites, and in the case of "bridges over navigation routes," even if the rack scaffolding mobile floor encroaches on the navigation limits, it can be stopped and secured outside the navigation limits when not in use, minimizing the impact on navigating vessels. 【Features of Rack Scaffolding (R)】 ■ High safety ■ Quick installation ■ Excellent cost-effectiveness ■ Resource-saving ■ Compatible with various structural shapes *For more details, please refer to the PDF materials or feel free to contact us.

  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A site where the rack scaffolding is being rearranged over the bridge pier to the next span (1)

With materials for one span, it is possible to install scaffolding for multi-span bridges! Introducing examples of the rack scaffolding method.

The "Rack Scaffolding (R)" is a movable suspended scaffold that uses two rack rails installed on a structure as its track. After installing the movable floor of the rack scaffolding, only the extension work of the rack rails, which serve as the track, remains, allowing for a significant reduction in the construction period for scaffold work. It demonstrates its characteristics in various sites, and in cases where "the rack scaffolding is moved over the bridge pier to the next span," it can be installed on multi-span bridges using materials for just one span, with successful projects such as the Takizawa River Bridge. 【Features of Rack Scaffolding (R)】 ■ High safety ■ Quick installation possible ■ Excellent cost-effectiveness ■ Material-saving capability ■ Compatible with various shapes of structures *For more details, please refer to the PDF materials or feel free to contact us.

  • image_13.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] A site where the rack scaffolding is being changed over to the next span beyond the bridge pier (2)

A rack scaffolding method that allows for the installation of scaffolding on multi-span bridges using materials for a single span! Here are some specific examples from the field.

The "Rack Scaffolding (R)" is a mobile suspended scaffolding that uses two rack rails installed on a structure as its track. After installing the movable floor of the rack scaffolding, only the extension work of the rack rails, which serve as the track, remains, allowing for a significant reduction in construction time for scaffolding work. It demonstrates its characteristics in various sites, and in cases where "the rack scaffolding is moved over the bridge pier to the next span," it can be installed on multi-span bridges using materials for just one span, with successful projects such as the Morimoto River Bridge. 【Features of Rack Scaffolding (R)】 ■ High safety ■ Quick installation possible ■ Excellent cost-effectiveness ■ Material-saving capability ■ Compatible with various structural shapes *For more details, please refer to the PDF materials or feel free to contact us.

  • image_15.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Scaffold Construction Achievements】 Shimono Ohashi

Under the site conditions where there are significant changes in height, you have adopted "rack scaffolding"!

We would like to introduce our construction achievements using "rack scaffolding." The concrete fall prevention measures were utilized for the Shimotsuke Ohashi Bridge (a prestressed concrete three-span continuous frame box girder bridge) that spans the JR Tohoku Shinkansen and JR Tohoku Main Line on the Kita-Kanto Expressway. For the JR Tohoku Main Line, it was adopted under site conditions where there is a significant change in girder height. 【Overview】 ■ Location/Prefecture: Tochigi Prefecture ■ Client: East Japan Railway Company, Omiya Branch ■ Construction Company: Tekken Construction Co., Ltd. ■ Start Date of Use: February 2019 (on conventional lines), April 2019 (on Shinkansen) ■ Experience of local workers in rack scaffolding construction: First time ■ Presence of rack scaffolding handling instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • image_03.png
  • image_04.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffold Construction Achievements] Ariake Chikugo River Bridge

The upper structure construction of the Ariake Chikugo River Bridge, which spans the Chikugo River on National Route 208 along the Ariake Sea coastal road, has been utilized!

We would like to introduce our construction achievements using "rack scaffolding." This was utilized for the superstructure work of the Ariake Chikugo River Bridge (a steel four-span continuous <two-span> single-cable arch bridge) over the Chikugo River along National Route 208 on the Ariake Sea coast (for dismantling the suspended scaffolding and as a substitute for the suspended scaffolding). Please feel free to contact us when you need our services. 【Overview】 ■ Location/Prefecture: Fukuoka Prefecture ■ Client: Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism ■ Construction Company: MMB, Miyachi, Kawada Joint Venture ■ Start Date of Use: July 2018 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Availability of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Scaffolding Construction Achievements】Omorihashi Bridge

No lane restrictions or barges were needed at all! There was almost no impact on road users!

We would like to introduce our construction achievements for the inspection work on the Omorikawa Bridge (Phase 1) (a five-span continuous post-tensioned PC box girder bridge) spanning the Omorikawa River on the Akita Minami Bypass (National Route 7). Due to the presence of a water pipe bridge and Phase 2 on either side of Phase 1, inspections using a bridge inspection vehicle were difficult, which is why we adopted a "rack scaffold." Since the installation spans consist of five spans, we installed one unit on the high water bed and conducted inspection work by moving it from span to span until reaching the opposite bank. When moving over the piers, there was no need for lane restrictions or barges, so there was almost no impact on road users. Additionally, by using brackets to suspend the running rails from the ground cover, we were able to install them without using post-installed anchors. Furthermore, by using a mid-level scaffold, we were able to accommodate a 2.7m change in girder height. *For more details, please refer to the PDF materials or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffolding Construction Achievements] Kiso River Ohashi Bridge (Downstream)・Ibi Nagara Ohashi Bridge (Downstream)

When moving the "rack scaffolding" over the bridge pier to change the floor, there was no need for road restrictions or barges at all!

We would like to introduce our construction achievements in the inspection work for the Kiso River Ohashi Bridge (downstream) and the Ibi Nagara Ohashi Bridge (downstream). Both bridges have an upper structure type of "lower chord simple steel Warren truss bridge," with 12 spans and 14 spans, respectively. It was necessary to complete the inspection work quickly, but the main structure posed obstacles, making it difficult to use bridge inspection vehicles. Therefore, we adopted a method of installing a "rack scaffold" movable floor on the high water bed and conducting the inspection work while shifting it for each span, progressing all the way to the opposite bank. When shifting the movable floor over the bridge piers, there was no need for road restrictions or barges, so there was almost no impact on users. *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffolding Construction Achievements] New Chitose Airport

It is possible to minimize the impact on ground operations! We were able to install it without any issues by utilizing its characteristics.

We would like to introduce our construction achievements related to the ceiling finishing work for the new international passenger terminal building at New Chitose Airport. Since the installation rail components (large roof truss) are curved in a planar manner, the track width has changed. However, by utilizing the characteristics of the "rack scaffolding," we were able to install it without any issues. Additionally, during the lateral reconfiguration, the movable floor was never lowered to the ground, which minimized the impact on ground operations. 【Overview】 ■ Location/Prefecture: Hokkaido ■ Client: Hokkaido Airport Co., Ltd. ■ Construction Company: Kajima, Miyasaka, Arai Joint Venture ■ Start of Use: August 2009 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffolding Construction Achievements] New Doha International Airport, Qatar

To cover a vast construction area at a low cost, we utilized "rack scaffolding"!

We would like to introduce our construction achievements in ceiling work for the New Doha International Airport (Qatar New Doha International Airport) new construction project. To cover the vast construction area cost-effectively, we utilized "rack scaffolding." Please feel free to contact us if you have any inquiries. 【Overview】 ■Location/Prefecture: Qatar ■Construction Company: Taisei Corporation ■Start Date of Use: September 2008 ■Experience of local workers in rack scaffolding installation: First time ■Presence of rack scaffolding handling instructors: Yes *For more details, please refer to the PDF materials or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffold Construction Achievements] Haneda Airport Terminal 2

As a result of thorough discussions with the construction company, we achieved the installation of the rack rail in three dimensions!

We would like to introduce our construction achievements in the installation of ceiling panels and the lifting of wall glass at Tokyo International Airport (Haneda Airport). Due to design requirements, it was necessary to install the rack rails in a three-dimensional manner, but through careful discussions with the construction company, we were able to achieve this. Please feel free to contact us if you have any inquiries. 【Overview】 ■ Location/Prefecture: Tokyo ■ Client: Japan Airport Terminal Co., Ltd. ■ Construction Company: Taisei Corporation ■ Start of Use: November 2003 ■ Experience of local workers in rack scaffolding construction: First time ■ Availability of rack scaffolding handling instructors: Yes *For more details, please refer to the PDF materials or feel free to contact us.

  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffolding Construction Achievements] Matsuyama Airport

It is possible to finish all ceiling panels! Introducing our construction achievements at airports.

During the renovation work at Matsuyama Airport, "rack scaffolding" was utilized for the finishing of the ceiling panels. First, the ceiling panels, except for the rail suspension points, were finished in advance, and finally, the finishing of the ceiling panels at the rail suspension points was completed during the removal of the rails. By doing this, it became possible to finish all ceiling panels using our product. [Overview] ■ Location/Prefecture: Ehime Prefecture ■ Client: Ehime Prefecture ■ Construction Company: Okumura Corporation ■ Start Date of Use: August 1994 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Presence of Rack Scaffolding Handling Instructor: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • matsuyama02.jpg
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gear-type lift "Rack Lifter" Product Catalog

Safer and more reliable! A variety of options to choose from to suit various work environments.

This catalog introduces the gear-type lift "Rack Lifter," which achieves a remarkable reduction in labor for cargo handling operations. We offer a lineup suitable for shops and small warehouses, including the easy-to-assemble, space-saving design "Lift Pattan-ko," "YV-2GH," the light cargo-only "YV-2H," and the groundbreaking low-floor type "YV-4H." Please use this information to assist you in selecting products. 【Featured Products (Partial)】 ■ Lift Pattan-ko ■ YV-2GH ■ YV-2H ■ YV-4H ■ YV-4W *For more details, please refer to the PDF materials or feel free to contact us.

  • lift
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Scaffolding Construction Example] Tokyo Metropolitan Expressway Route 11 Daiba Line

The painting renovation work was carried out at the elevated intersection with the new transportation system (Yurikamome) on the Tokyo Metropolitan Expressway Route 11 Daiba Line.

We would like to introduce our construction achievements on the new transportation system (Yurikamome). Due to the architectural limitations of the new transportation system (Yurikamome), it was not possible to install standard construction scaffolding, so a method was adopted to move rack scaffolding onto the track during the power outage period to carry out the construction. Outside of construction working hours, the rack scaffolding was moved outside the influence area of the new transportation system and secured close to the bridge pier. 【Overview】 ■ Location/Prefecture: Tokyo ■ Client: Metropolitan Expressway Company Limited ■ Construction Company: JFE Civil Engineering and JFE Engineering (Repair) Upper Structure Reinforcement 2-206 Special Construction Joint Venture ■ Start of Use: July 2022 to November 2023 ■ Local workers' experience with rack scaffolding installation: First time ■ Dispatch of rack scaffolding handling instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • 【HP使用】03_2022_東京_首都高台46~47(下り線)(ゆりかもめ上)_221215_使用状況_ky_036_s.JPG
  • 【HP使用】門田様より受領.jpg
  • 【HP使用】01_2022_東京_首都高台46~47(下り線)(ゆりかもめ上)_221215_KT_004_R.JPG
  • Scaffolding and Support Materials
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

System rack

For karaoke, conference rooms, stages, and other store facilities! We also accept orders for custom racks.

We offer "system racks" for storing audio equipment and more. We have a wide range of options, including racks with convenient handles for easy mobility and racks that can be easily assembled. For karaoke racks, please let us know the model you will be using or your desired dimensions, and we will provide you with a quote, so feel free to contact us. 【Custom Examples】 ■ Made to the exact size for limited spaces ■ Change the sarang net to a board (such as a hinged door) ■ Change the casters from φ65 to a larger size ■ Racks suitable for children's commercial facilities, etc. *For more details, please download the PDF or feel free to contact us.

  • Other office supplies
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

System Rack 'MKB-R13S' <Shallow Depth Type>

The color is black, the weight capacity is MAX 80kg, and the shelf can hold 15kg! Various infrared charging stands can be stored.

We would like to introduce our company's shallow-depth system rack, the 'MKB-R13S'. It can accommodate various infrared charging stands (usable on either side) as well as various infrared receivers (the decorative panel is removable). Additionally, a stand for electronic table of contents books can be attached. Please feel free to contact us if you have any requests. 【Included Accessories】 ■ 1 movable shelf, 2 fixed shelves, ■ 3 dual-wheel casters with stoppers, 2 dual-wheel casters without stoppers *For more details, please download the PDF or feel free to contact us.

  • MKB-R13S 2.png
  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

System Rack "MKB-CR30" <Shallow Depth Type>

Easy assembly with just one screwdriver! Introducing a rack made in JAPAN.

We would like to introduce our system rack 'MKB-CR30', a slim-depth type that we handle. It is easy to assemble with just one screwdriver. The load capacity is MAX 80kg, with a shelf capacity of 15kg. The color is dark gray, and it comes with two adjustable shelves, making it part of our easy-to-assemble series. Please feel free to contact us if you have any inquiries. 【Compatible Models (Partial)】 ■JS-FX10 ■JS-FX5 ■JS-FX2 ■JS-FX ■JS-NX2 *For more details, please download the PDF or feel free to contact us.

  • MKB-CR30 2.png
  • MKB-CR30 3.png
  • Shelves and racks
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Front Wheel Rack "Moving Rack"

You can use an easy and safe method to reverse the vehicle by stepping on it with your foot.

The "Moving Rack" is a user-friendly front wheel rack designed to be gentle on mothers in the child-rearing generation and the elderly, alleviating the stress that users have faced in bike parking areas. Since the rack follows the front wheel, there is no need to lift heavy electric assist bicycles. Please feel free to contact us if you have any inquiries. 【Features】 ■ The asymmetrical tire guide enhances visibility during parking and is designed for usability from an ergonomic perspective. ■ Compatible with 20 to 27-inch bikes. Designed not to interfere with the acceleration sensor. ■ Two-step structure that mitigates the impact when riding up. *For more details, please download the PDF or feel free to contact us.

  • Other commercial buildings and service facilities
  • Other store equipment and supplies
  • Car and bicycle parking facilities
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pallet rack

Excellent strength with pillars shaped using high-tensile steel plates! Equipped with a retention mechanism deck channel.

At Hardy Create, we offer pallet racks with excellent strength provided by columns made of high-tensile steel plates (SAPH). Excellent strength from columns made of high-tensile steel plates (SAPH). In addition to standard 75mm wide columns suitable for regular storage, we also provide 100mm wide columns that boast outstanding strength, accommodating high-rise and heavy loads. 【Features】 ■ Excellent column strength ■ Shelf pitch of 50mm ■ High constructability ■ Easy shelf adjustments ■ Compliant with the new JIS standards (2018 edition) *For more details, please refer to the related links or feel free to contact us.

  • palette
  • rack

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration