[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.
The "RBP Wall Method" combines reverse bolt paneling and rebar insertion work to prevent collapse by stabilizing cut slopes and natural slopes. It is applicable in areas with low ground stress, places with limited space, and cut areas adjacent to structures, for purposes such as road widening, land development, steep slope countermeasures, fall prevention work platforms, and slope stabilization work. Excavation of the ground is performed using a sloping method that lowers the slope while securing it with reverse bolt panels from the top of the slope. For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
Related Videos
basic information
Features 1. It can be extended in either direction, up or down, from any fixed point (line). 2. Excavation is carried out to the height determined by calculations, and immediately after, rebar insertion work is performed, ensuring constant slope stability. 3. While lowering, reinforcement is added to the cut slope using reinforcement materials (rebar), allowing excavation at steep gradients even in weak ground conditions. 4. The reverse bolt panel is securely connected with PC steel materials, forming a highly stable slope and providing significant resistance to ground movements such as earthquakes. *For more details, please refer to the catalog or feel free to contact us.*
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.