Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 HDD method (induced horizontal drilling) achieves shortened construction time and labor savings! 東洋工務店

Construction method Product List

4141~4155 item / All 4210 items

Displayed results

Roof board creaking reduction method

Measures to reduce the transmission of vibrations from friction and impact sounds caused by misalignment at the contact position!

Our company implements the "Board Sound Reduction Method" in buildings intended for audiences, such as gymnasiums and auditoriums, as well as in buildings with offices directly under the roof. This method targets upper chord members affected by external air, inserting cushioning seals and other materials at the contact surfaces between components to minimize contact between metals. It is designed to reduce the transmission of friction and impact sounds caused by misalignment of contact points. Please feel free to consult us when you need our services. 【Target】 ■ Buildings intended for audiences, such as gymnasiums and auditoriums ■ Buildings with offices directly under the roof *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

How to choose a liner plate construction method? *Reference materials for method comparison are currently being provided.

Introducing methods suitable for repairing upstream bridges where large heavy machinery access is difficult, including ways to reuse liner plates! What construction methods are suitable for shortening construction time and reducing labor?

This document explains the construction method using retaining materials widely known as the liner plate method. Various methods are considered mainly for bridge pier repairs, and it is widely examined as a suitable foundation and retaining method in areas such as upstream rivers where heavy machinery cannot access. [Document Introduction *Excerpt] ■ Methods suitable for the removal of accumulated sediment around bridge piers ■ Methods that have achieved the reuse of liner plates ■ Comparison materials for various liner plate methods *Overview, features, water-stopping methods, advantages, disadvantages, etc. are introduced. Our company handles methods suitable for temporary closures (using liner plates) for bridge piers, sluices, etc. *For more details, please download the PDF or feel free to contact us.

  • 図3.png
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Zero Clearance Method

It is possible to construct with the gap (dead space) between the structure and the pile material in a "zero" state!

We would like to introduce the "Zero Clearance Construction Method." This method allows for construction with the gap (dead space) between adjacent structures and pile materials in a "zero" state. Please feel free to contact us when you need our services. 【Features】 ■ Construction is possible with the gap (dead space) between adjacent structures and pile materials in a "zero" state. *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile driving method

From temporary soil retaining walls to permanent retaining walls (permanent structures)! Capable of being installed by pressing for a wide range of purposes.

We would like to introduce the "Steel Pipe Pile Driving Method." Using steel pipe piles, we can perform press-in construction for a wide range of purposes, from temporary earth retention walls to permanent retaining walls (permanent structures). Please feel free to contact us when you need our services. 【Features】 ■ Press-in construction is possible for a wide range of purposes. *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-fabricated pile driving method

Supporting the foundations of structures using a variety of construction methods and machinery! Introducing the precast pile driving method.

We would like to introduce the "Precast Pile Driving Method." This method uses a variety of techniques and machinery to support the foundations of structures with concrete piles. Please feel free to contact us if you have any inquiries. 【Features】 ■ Supports the foundations of structures *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary pier construction method

By installing a cover board, we construct a work platform and temporary bridge! Introducing the temporary bridge construction method.

We would like to introduce the "Temporary Bridge Construction Method." In river construction and similar projects, we construct a work platform and temporary bridge by combining H-shaped steel and installing cover plates on top. Please feel free to contact us when you need our services. 【Features】 ■ Constructing work platforms and temporary bridges *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vibro hammer method

Rapidly and temporarily reduce tip resistance and friction resistance! Introducing the vibro hammer method.

We would like to introduce the "Vibro Hammer Method." This method involves using a vibration-type pile driver to transmit forced vibrations to piles and steel sheets, rapidly and temporarily reducing the resistance at the tip and the friction resistance, allowing for driving and extraction. Please feel free to contact us when you need our services. 【Features】 ■ Rapid and temporary reduction of resistance at the tip and friction resistance *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal for Eco-Recycling Method of Temporary Water Supply and Drainage to Contribute to the Environment and Alleviate Labor Shortages.

Over 100 successful hires in the last 5 years. Contributing to waste reduction and cost savings. [*Nationwide support available]

The "Temporary Water Supply and Drainage Eco-Recycling Method" is a construction method that handles everything from the application for water supply and drainage at new construction sites to the planning, proposal, construction, and removal of temporary piping and water supply and drainage for site offices. By separating the work of temporary water supply and drainage from the busy tasks at the start-up of the site, this new initiative reduces the burden on the responsible personnel and contributes to the reduction of industrial waste through the reuse of temporary materials. 【Features】 ■ Design, estimation, and application agency ■ Construction, reconfiguration, and removal support ■ Environmental impact reduction *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The Innovative CFRP Repair and Reinforcement Method for Steel Structures - In-situ VaRTM Method

Forming 3D-shaped CFRP stiffeners on-site! (There is an example of steel girder web buckling countermeasures in Tokushima Prefecture)

The "In-situ VaRTM Method" is a innovative resin impregnation technique that utilizes vacuum technology, allowing for the production of high-quality CFRP reinforcement materials on-site, tailored to the shape of steel materials, through a new CF sheet bonding method. <Strengths of the Method> 1. Three-Dimensional Reinforcement Materials ● Three-dimensional reinforcement materials, similar to ribs, can be produced on-site, enabling integration with existing steel structures. This is something that was not possible with conventional CFRP reinforcement methods but can be achieved with the On-Site VaRTM Method. 2. Ultra-Short Construction Period and Cost Reduction ● Reinforcement for one location of steel corrosion can be completed in a standard of 3 to 4 days (a 70-80% reduction in construction time compared to conventional CF sheet bonding methods), allowing for efficient steel reinforcement. ● Due to the shortened construction period and increased efficiency, costs can be reduced by 20-30% compared to conventional CF sheet bonding methods. 3. Measures Against Poor Curing During Resin Curing ● During curing, uncured resin is covered with a film, preventing issues such as amine brushing that can lead to poor resin curing. 4. Others ● The On-Site VaRTM Method is a unique method developed by Toray. ● It received the Minister of Economy Award at the 6th Infrastructure Maintenance Awards.  ● Approved as a new repair and reinforcement method by Japan Ministry of Land, Infrastructure, Transport and Tourism. *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seamless Terrazzo Method

The PCP-YYF method of Perfect Wash! It is possible to create a mysterious and extraordinary experience.

We would like to introduce our "Seamless Terrazzo Method." The Seamless Terrazzo Method is an artificial stone that achieves a higher level of beauty with nearly infinite design and coloring options, seamlessness, excellent durability, and significant reductions in construction time. The joints can be freely arranged, allowing for creative design. Additionally, because it can be colored freely, it can be finished in an infinite variety of designs that match a single color or your preferred colors. 【Features】 ■ Joints can be freely arranged ■ Can be finished in an infinite variety of designs that match a single color or your preferred colors ■ Flexible ■ Resistant to extreme cracking, including hairline cracks ■ Strong against chemicals, oils, bacteria, etc. *For more details, please refer to the related links or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cement terrazzo method

Excellent in UV resistance, heat resistance, and weather resistance! A method that can be used both outdoors and indoors.

We would like to introduce our "Cement Terrazzo Method." This method is an evolution of traditional hand polishing. It involves mixing your preferred aggregates with cement and then applying and grinding the mixture. By varying the colors of the aggregates and cement, it is possible to create a unique design. This method is used in outdoor areas such as commercial facilities, and the combinations of designs are virtually limitless. 【Features】 ■ Excellent UV, heat, and weather resistance, suitable for both outdoor and indoor use ■ Can be applied to both existing and new constructions *For more details, please refer to the related links or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-profile casing conveyance down-the-hole hammer method LH-CDH

Low-altitude, under-bridge, under-railroad, under-road bridge, and under-power-line casing conveyance type down-the-hole hammer method!

We would like to introduce our "Low-Headroom Casing Continuous Down-the-Hole Hammer Method LH-CDH Method." By using a special bit and continuously installing protective steel pipes for the borehole walls, we can reliably excavate to the designed height even in collapsed layers with high groundwater levels. After excavation, the steel pipes are left in place, allowing for the extraction of the hammer bit, which ensures that core material installation and solidification with mortar can be carried out effectively. Please feel free to consult us when you need our services. 【Construction Examples (Partial)】 ■ LH-CDH Method - Height restriction: 4.55m (under highway bridge) - Steel material: H300 L=11.5m continuous pile construction - Construction machinery: RX2300 low-headroom construction machine HGS60 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quick Cutter Method

Minimize the construction area and shorten the construction time! Introducing the construction methods we use.

The "Quick Cutter Method" is a technique for replacing manhole covers, where a circular cutter equipped with a wireless camera is mounted on an excavator to cut through asphalt and concrete pavement. It uses ultra-rapid hardening, high fluidity, non-shrink grout (AQC grout) as the restoration material. It can be attached to excavators in the 0.1 to 0.2m (3t to 4t) class using a coupler. (Breaker placement required) It can cut to a maximum depth of 500mm, making it suitable even for thick pavements. 【Features】 ■ Equipped with cutter lift speed and lowering pressure adjustment functions ■ Circular cutting minimizes the construction area and shortens construction time ■ Can be operated while the excavator is loaded on a 4t flatbed vehicle ■ A wireless camera is installed inside the cutter, allowing for quick and safe alignment as it can be monitored from the driver's seat of the excavator ■ Can cut near curbs due to its hanging design *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Inspection hatches, manhole covers, and ditch covers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration