Construction method Product List and Ranking from 1593 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. ナカムラ Hyogo//Other construction industries
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Construction method for achieving large wooden structures: "NK Method" ナカムラ
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  4. 4 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  5. 5 [Disaster Measures] A must-see for those who want to reduce the amount of leftover soil! Liter Method 吉光組

Construction method Product List

4156~4170 item / All 4252 items

Displayed results

Vulcanization molding machine frame crack, screw hole repair, vibration machine crack, MS method.

We will repair the cracks that have occurred in the metal without applying heat. We will repair it without causing any distortion.

【Product PR】 The "MS Method (Mechanical Stitch)" is a groundbreaking repair technique (Mechanical Stitch Method) that addresses metal cracks using mechanical methods. Since no heat is applied at all, there is no "thermal distortion." Residual stress in other areas does not occur, preventing secondary damage such as new cracks. Metal cracks are one of the concerns in equipment maintenance operations. In typical welding repair methods, the base material around the crack changes due to heat, leading to residual stress and distortion, which always carries the risk of "crack recurrence" and "secondary damage." 【Features of the MS Method】 ■ No hardening or residual stress from heat ■ Elimination of secondary damage ■ Maintenance of stable quality → Integrated system repairs using jigs, etc. → Accumulation of know-how, experience, and track record ■ Completion of construction in a short period → Does not significantly reduce the operational rate of equipment ■ Advantages in safety and environmental aspects → No use of fire, thus no impact on the operational rate of other equipment or the environment For more details, please contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solving the problems of conventional weed control methods! 'Weed Control Materials'

We handle various weed control materials such as concrete sheets, flexible weed control tiles, and quick-setting solidifying agents for weed control!

Traditional weed control methods have the following issues: Weed control sheets: - Replacement is necessary within a short period due to UV degradation. - Installation is easy, but the durability is short. - There are concerns about peeling and scattering due to strong winds. In the case of concrete overlay (seal concrete): - Difficult to install in narrow sites due to heavy machinery. - The processes of formwork installation and surface finishing are complicated, requiring skilled workers for formwork. - The curing period is long. - Joint materials need to be installed to prevent cracking. In the case of mortar spraying: - Difficult to install in narrow sites due to heavy machinery. - It is necessary to use wire mesh to prevent cracking and peeling. - Quality is affected by mix ratios and weather conditions. - There is variability in quality after curing, with concerns about cracking due to drying shrinkage. 《High durability and high-functioning weed control materials solve traditional problems!》 Concrete canvas: A concrete mat that hardens just by adding water. Grass top: Prevents weed growth for a long time, making management easier. Denka Fuse Grass: Hardens in 5 minutes with water, allowing for opening the next day with rapid hardening material. *We also handle various other weed control materials.

  • Paving Materials
  • Landscaping materials
  • Exterior Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly weed control greening method without using sheets [*Case photo collection will be provided*]

A greening method registered in NETIS that combines alkaline recycled soil and creeping thyme.

The weed control greening method is a new greening technique registered with NETIS that uses alkaline recycled soil and creeping thyme instead of sheets. By combining weed control soil with creeping thyme, it creates a beautiful environment and realizes an eco-friendly approach that is gentle for everyone in the future. *We are currently offering a photo collection featuring case studies! Please download for more details. 【What’s Different!】 - Since it uses weed control soil instead of sheets, there is no risk of sheets blowing onto the road! - Creeping thyme grows quickly, allowing for speedy completion of the work! *For more details, please contact us or download the catalog to view. *We are currently recruiting franchise members (franchises and agents). Feel free to inquire about this as well.

  • Wall and rooftop greenery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Ground Guarantee Service "THE LAND 3000 +20"

Conditions for ground guarantee application, compensation limit amount, etc., same conditions as the 10-year guarantee.

"The LAND 3000 +20" is a unique comprehensive ground guarantee service provided by GIR, a company with a solid track record as a ground guarantee provider, which conducts guarantee assessments for each property. We offer peace of mind for 20 years in a visible form. Furthermore, with "THE LAND," which sets itself apart from traditional ground guarantees, not only ground-related companies (investigation and improvement companies) but also builders are covered under the guarantee. Therefore, in the event of issues arising from the ground, we will promptly carry out restoration work to return the property to its original condition without questioning "who is responsible." 【Features】 ○ Achieves a 20-year long-life guarantee ○ Guarantee conditions and compensation limits are the same as those for the 10-year guarantee For more details, please contact us or download the catalog.

  • Company:GIR
  • Price:Other
  • Other civil engineering works
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Ground Guarantee Service "THE LAND 5000 +20"

The "THE LAND+20" series with a 20-year warranty has arrived.

"The LAND 5000 +20" is a unique comprehensive ground guarantee service provided by GIR, a company with a solid track record as a ground guarantee provider, which conducts guarantee assessments for each property. We offer 20 years of peace of mind in a visible form. Furthermore, with "THE LAND," which sets itself apart from conventional ground guarantees, not only ground-related companies (investigation and improvement companies) but also builders are covered under the guarantee. Therefore, in the event of issues arising from the ground, we will promptly carry out restoration work to return the property to its original state without questioning "who is responsible." 【Features】 ○ Achieves a long-life guarantee of 20 years ○ Guarantee conditions and compensation limits are the same as those for the 10-year guarantee For more details, please contact us or download the catalog.

  • Company:GIR
  • Price:Other
  • Other civil engineering works
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduction of fixed materials, decrease in generated residual soil, and improved mixing efficiency! 'Rising Method'

By using a special mixing agent, the water-to-solid material ratio of cement milk can be concentrated up to 40%, enabling the construction of high-strength improved soil!

The "Rising Method" is a ground improvement technique that involves placing pre-excavated soil into the excavation area and using a uniquely developed mixing bucket to mix the soil with slurry (W method) or soil with solidifying agents (D method), thereby constructing a highly homogeneous block-like improved body. By excavating the soil in advance, it allows for the "confirmation of the supporting layer and the soil to be improved," and also enables the "removal of organic soil that hinders solidification, as well as gravel layers, boulders, industrial waste, and underground obstacles that may impede construction," achieving various benefits. Additionally, in the W method, as a quality control test immediately after construction, the resistivity of the improved body is measured to confirm the mixing conditions. It has obtained the Architectural Technical Performance Certification from the Japan Building Disaster Prevention Association. 【Features】 ■ Reliable quality control ■ Enhanced mixing effect with unique technology ■ Applicable to small buildings as well as civil engineering structures ■ Compatible with a wide range of soil types ■ Confirmation of advanced ground ■ Low noise and low vibration *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthworks
  • Ground improvement
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mesh Formwork Panel Method "Eco Well Mesh"

A new concept of non-demolition concrete formwork! It can be used as the foundation of the building even after pouring the concrete!

"Eco Well Mesh" is a concrete formwork developed based on a completely different concept from traditional formwork methods such as conventional frames and conventional lath formwork, by processing iron wire frames and combining them with specialized wire mesh. Since it can be used as the foundation of the building after pouring concrete, there is no need for dismantling, and no waste is generated. ◎ We are currently seeking sales agents! 【Features】 ■ Custom-made production eliminates the need for on-site processing ■ Easy assembly allows for shortened construction time ■ Zero waste means no cleanup is necessary on-site ■ Can be used at the bottom of beams and is easy to install *For more details, please request materials or view the PDF data from the download.

  • Formwork material
  • Dismantling and moving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method

Proposals for preventive maintenance and longevity of aging steel and concrete structures.

We would like to introduce our "Ceramax Method." It has ultraviolet durability that is several times greater than that of conventional paints, and it is effective for concrete corrosion prevention due to its salt resistance, prevention of neutralization, and waterproofing properties. It penetrates and hardens in fine pores of around 1μm due to its low molecular weight, providing high rust prevention capability. Additionally, the paint used in this method, Ceramax, has passed Type I and Type II tests for civil engineering anti-fouling materials. 【Features】 ■ Rust prevention capability ■ Weather resistance ■ Concrete corrosion prevention ■ VOC reduction ■ Shortened construction period ■ Non-combustibility *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Slit Wall Construction Material Prices and Estimation Data

Please use this as construction material for steel slit walls.

This document contains construction prices and estimation materials for "Steel Slit Walls." [Contents] ■ Construction Prices ■ Estimation Materials *For more details, please refer to the catalog or feel free to contact us.

  • Retaining wall
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

LPF method for temporary closure supporting pier reinforcement with abundant achievements.

Over 90 construction achievements and more than 110 target bridge piers. Supporting bridge pier reinforcement work nationwide safely and efficiently with proven know-how.

The "Temporary Closure LPF Method" is a well-established technique for constructing temporary closures using liner plates in underwater structures such as rivers, seas, and dams. By minimizing custom components for each pier and allowing for shape selection based on site conditions, it contributes to shortening the construction process and ensuring stable construction quality. It is also compatible with manual construction, having numerous successful projects even in sites with strict headroom restrictions (approximately 1.0m). *Please take a look at the collection of case studies summarizing our construction achievements. 【Features】 ■ Composition of liner plates + H-beam reinforcement rings + support structures ■ Assembled above water and then installed underwater ■ Compatible with narrow and vibration-free construction ■ Usable even under low headroom conditions

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A temporary closure LPF method capable of adapting to various site conditions.

Wide-ranging support for rivers, seas, and dams. Temporary closure methods suitable for bridge pier reinforcement that are easy to adopt even under low headroom and narrow conditions.

The "Temporary Closure LPF Method" is a temporary closure method that has been adopted in various underwater environments such as rivers, seas, and dams. Since it allows for the selection of the optimal shape according to site conditions, it enables flexible construction plans even in sites with spatial constraints that are difficult to address with conventional methods. It is also compatible with manual construction, making it easy to implement even in bridge pier reinforcement work where headroom restrictions are strict. *For details, please refer to the construction case collection and method comparison materials. 【Features】 ■ Temporary closure structure using liner plates ■ Above-water assembly and underwater installation method ■ Suitable for low headroom and narrow areas ■ Construction that suppresses vibrations is possible

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary closure LPF method suitable for bridge pier reinforcement work

Considering the actual conditions of repair and reinforcement work. A temporary closure method that achieves stable construction even under narrow and low headroom conditions.

In bridge repair and reinforcement work, what is important is the reliable temporary closure construction in a limited working space. The temporary closure LPF method adopts a structure that can be assembled and installed even in narrow areas and low headroom conditions. Due to vibration-free construction, it is possible to ensure both safety and workability while minimizing the impact on existing structures. *Please refer to the case study collection that includes examples of its use in reinforcement work. 【Features】 ■ Temporary closure structure using liner plates ■ Above-water assembly and underwater installation method ■ Compatible with low headroom and narrow areas ■ Vibration-reduced construction is possible

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary closure LPF method supporting offshore pier construction

Corresponds to the reinforcement of bridge piers in marine and port areas. A temporary closure method with vibration-free construction to minimize the impact on surrounding facilities.

In reinforcement work for harbor areas and offshore bridge piers, consideration for surrounding facilities and navigation environments is essential. The temporary cutoff LPF method adopts a structure that allows for vibration-free construction, achieving temporary cutoff work that takes into account the marine environment. It also accommodates manual construction, making it an easy-to-implement method even in harbor areas with limited working space. *Please check the construction examples of harbor and offshore work. 【Features】 ■ Temporary cutoff structure using liner plates ■ Above-water assembly and underwater installation method ■ Suitable for low headroom and narrow areas ■ Construction that minimizes vibrations is possible

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary closure LPF method supporting seismic reinforcement of bridges

Corresponds to reinforcement and renewal work for existing bridges. A temporary closure method that is easy to consider even in seismic reinforcement projects with many constraints.

In the seismic reinforcement and longevity enhancement project for existing bridges, a construction plan that utilizes existing structures is required. The temporary closure LPF method can be implemented even in narrow conditions and low headroom environments, making it a chosen temporary closure method for seismic reinforcement work. By minimizing custom components, it also contributes to the overall project schedule management. *Examples of its application in seismic reinforcement work are included. 【Features】 ■ Temporary closure structure using liner plates ■ Above-water assembly and underwater installation method ■ Suitable for low headroom and narrow areas ■ Construction that minimizes vibrations is possible

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary closure LPF method that can be constructed even under heavy machinery restrictions.

A temporary closure method that is easy to implement even for bridge pier reinforcement work where heavy machinery cannot be used, accommodating manual construction.

In bridge pier reinforcement work, the use of heavy machinery may be restricted due to site conditions and surrounding environments. The temporary cutoff LPF method accommodates manual construction, allowing assembly and installation even in low headroom and narrow spaces. It is utilized as a practical temporary cutoff method even at sites with construction constraints. *Please refer to the materials that include examples of manual construction. 【Features】 ■ Temporary cutoff structure using liner plates ■ Above-water assembly and underwater installation method ■ Suitable for low headroom and narrow areas ■ Construction that minimizes vibrations is possible

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration