Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

4156~4170 item / All 4238 items

Displayed results

I will repair the stripped screw hole.

This is a record of repairing a crack in an aluminum exhaust manifold! Aluminum casting repair!

【Product PR】 The "MS Insert" is a female threaded part designed to repair damaged bolt holes. It involves embedding an insert with a special structure applied to the outer diameter thread into the bolt hole area for restoration. It is difficult to pull out and does not impose a load on the base material, making it suitable for installation in areas that are constantly exposed to vibrations or at the ends. Compared to conventional products such as spring-type coils and self-tapping items, it improves precision and demonstrates groundbreaking effects in terms of durability. Additionally, by pre-installing it in areas where bolts are frequently attached and detached, permanent measures can be implemented. 【Features】 ■ Difficult to pull out and does not impose a load on the base material ■ Ideal for permanent measures for threaded holes ■ Can be used to strengthen and restore thread profiles ■ Enables installation at the ends → The design of the upward-facing thread works to attract the surrounding base material toward the center of the screw from all directions. For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vulcanization molding machine frame crack, screw hole repair, vibration machine crack, MS method.

We will repair the cracks that have occurred in the metal without applying heat. We will repair it without causing any distortion.

【Product PR】 The "MS Method (Mechanical Stitch)" is a groundbreaking repair technique (Mechanical Stitch Method) that addresses metal cracks using mechanical methods. Since no heat is applied at all, there is no "thermal distortion." Residual stress in other areas does not occur, preventing secondary damage such as new cracks. Metal cracks are one of the concerns in equipment maintenance operations. In typical welding repair methods, the base material around the crack changes due to heat, leading to residual stress and distortion, which always carries the risk of "crack recurrence" and "secondary damage." 【Features of the MS Method】 ■ No hardening or residual stress from heat ■ Elimination of secondary damage ■ Maintenance of stable quality → Integrated system repairs using jigs, etc. → Accumulation of know-how, experience, and track record ■ Completion of construction in a short period → Does not significantly reduce the operational rate of equipment ■ Advantages in safety and environmental aspects → No use of fire, thus no impact on the operational rate of other equipment or the environment For more details, please contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solving the problems of conventional weed control methods! 'Weed Control Materials'

We handle various weed control materials such as concrete sheets, flexible weed control tiles, and quick-setting solidifying agents for weed control!

Traditional weed control methods have the following issues: Weed control sheets: - Replacement is necessary within a short period due to UV degradation. - Installation is easy, but the durability is short. - There are concerns about peeling and scattering due to strong winds. In the case of concrete overlay (seal concrete): - Difficult to install in narrow sites due to heavy machinery. - The processes of formwork installation and surface finishing are complicated, requiring skilled workers for formwork. - The curing period is long. - Joint materials need to be installed to prevent cracking. In the case of mortar spraying: - Difficult to install in narrow sites due to heavy machinery. - It is necessary to use wire mesh to prevent cracking and peeling. - Quality is affected by mix ratios and weather conditions. - There is variability in quality after curing, with concerns about cracking due to drying shrinkage. 《High durability and high-functioning weed control materials solve traditional problems!》 Concrete canvas: A concrete mat that hardens just by adding water. Grass top: Prevents weed growth for a long time, making management easier. Denka Fuse Grass: Hardens in 5 minutes with water, allowing for opening the next day with rapid hardening material. *We also handle various other weed control materials.

  • Paving Materials
  • Landscaping materials
  • Exterior Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly weed control greening method without using sheets [*Case photo collection will be provided*]

A greening method registered in NETIS that combines alkaline recycled soil and creeping thyme.

The weed control greening method is a new greening technique registered with NETIS that uses alkaline recycled soil and creeping thyme instead of sheets. By combining weed control soil with creeping thyme, it creates a beautiful environment and realizes an eco-friendly approach that is gentle for everyone in the future. *We are currently offering a photo collection featuring case studies! Please download for more details. 【What’s Different!】 - Since it uses weed control soil instead of sheets, there is no risk of sheets blowing onto the road! - Creeping thyme grows quickly, allowing for speedy completion of the work! *For more details, please contact us or download the catalog to view. *We are currently recruiting franchise members (franchises and agents). Feel free to inquire about this as well.

  • Wall and rooftop greenery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Ground Guarantee Service "THE LAND 3000 +20"

Conditions for ground guarantee application, compensation limit amount, etc., same conditions as the 10-year guarantee.

"The LAND 3000 +20" is a unique comprehensive ground guarantee service provided by GIR, a company with a solid track record as a ground guarantee provider, which conducts guarantee assessments for each property. We offer peace of mind for 20 years in a visible form. Furthermore, with "THE LAND," which sets itself apart from traditional ground guarantees, not only ground-related companies (investigation and improvement companies) but also builders are covered under the guarantee. Therefore, in the event of issues arising from the ground, we will promptly carry out restoration work to return the property to its original condition without questioning "who is responsible." 【Features】 ○ Achieves a 20-year long-life guarantee ○ Guarantee conditions and compensation limits are the same as those for the 10-year guarantee For more details, please contact us or download the catalog.

  • Company:GIR
  • Price:Other
  • Other civil engineering works
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Ground Guarantee Service "THE LAND 5000 +20"

The "THE LAND+20" series with a 20-year warranty has arrived.

"The LAND 5000 +20" is a unique comprehensive ground guarantee service provided by GIR, a company with a solid track record as a ground guarantee provider, which conducts guarantee assessments for each property. We offer 20 years of peace of mind in a visible form. Furthermore, with "THE LAND," which sets itself apart from conventional ground guarantees, not only ground-related companies (investigation and improvement companies) but also builders are covered under the guarantee. Therefore, in the event of issues arising from the ground, we will promptly carry out restoration work to return the property to its original state without questioning "who is responsible." 【Features】 ○ Achieves a long-life guarantee of 20 years ○ Guarantee conditions and compensation limits are the same as those for the 10-year guarantee For more details, please contact us or download the catalog.

  • Company:GIR
  • Price:Other
  • Other civil engineering works
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduction of fixed materials, decrease in generated residual soil, and improved mixing efficiency! 'Rising Method'

By using a special mixing agent, the water-to-solid material ratio of cement milk can be concentrated up to 40%, enabling the construction of high-strength improved soil!

The "Rising Method" is a ground improvement technique that involves placing pre-excavated soil into the excavation area and using a uniquely developed mixing bucket to mix the soil with slurry (W method) or soil with solidifying agents (D method), thereby constructing a highly homogeneous block-like improved body. By excavating the soil in advance, it allows for the "confirmation of the supporting layer and the soil to be improved," and also enables the "removal of organic soil that hinders solidification, as well as gravel layers, boulders, industrial waste, and underground obstacles that may impede construction," achieving various benefits. Additionally, in the W method, as a quality control test immediately after construction, the resistivity of the improved body is measured to confirm the mixing conditions. It has obtained the Architectural Technical Performance Certification from the Japan Building Disaster Prevention Association. 【Features】 ■ Reliable quality control ■ Enhanced mixing effect with unique technology ■ Applicable to small buildings as well as civil engineering structures ■ Compatible with a wide range of soil types ■ Confirmation of advanced ground ■ Low noise and low vibration *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthworks
  • Ground improvement
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mesh Formwork Panel Method "Eco Well Mesh"

A new concept of non-demolition concrete formwork! It can be used as the foundation of the building even after pouring the concrete!

"Eco Well Mesh" is a concrete formwork developed based on a completely different concept from traditional formwork methods such as conventional frames and conventional lath formwork, by processing iron wire frames and combining them with specialized wire mesh. Since it can be used as the foundation of the building after pouring concrete, there is no need for dismantling, and no waste is generated. ◎ We are currently seeking sales agents! 【Features】 ■ Custom-made production eliminates the need for on-site processing ■ Easy assembly allows for shortened construction time ■ Zero waste means no cleanup is necessary on-site ■ Can be used at the bottom of beams and is easy to install *For more details, please request materials or view the PDF data from the download.

  • Formwork material
  • Dismantling and moving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method

Proposals for preventive maintenance and longevity of aging steel and concrete structures.

We would like to introduce our "Ceramax Method." It has ultraviolet durability that is several times greater than that of conventional paints, and it is effective for concrete corrosion prevention due to its salt resistance, prevention of neutralization, and waterproofing properties. It penetrates and hardens in fine pores of around 1μm due to its low molecular weight, providing high rust prevention capability. Additionally, the paint used in this method, Ceramax, has passed Type I and Type II tests for civil engineering anti-fouling materials. 【Features】 ■ Rust prevention capability ■ Weather resistance ■ Concrete corrosion prevention ■ VOC reduction ■ Shortened construction period ■ Non-combustibility *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Slit Wall Construction Material Prices and Estimation Data

Please use this as construction material for steel slit walls.

This document contains construction prices and estimation materials for "Steel Slit Walls." [Contents] ■ Construction Prices ■ Estimation Materials *For more details, please refer to the catalog or feel free to contact us.

  • Retaining wall
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

When it comes to construction work, it's the "Milling Mall Method"! *Currently offering a collection of achievements by obstacle type.

[NETIS Registered] No worries even if obstacles arise! A construction method that is starting to be chosen nationwide! Compatible with diameters from φ800 to 3000 mm.

The "Milling Mole Method," a ground obstacle response type mud-based propulsion method equipped with four special functions: exploration, improvement, cutting, and guidance, consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the fine cutting and discharge of underground obstacles. Using electromagnetic waves, it explores metal obstacles ahead while propelling and can also improve the ground from within the tunneling machine before and after the detected obstacles. In the event that an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued propulsion. Additionally, a system is equipped to guide the tunneling machine to a designated position within the arrival shaft by installing a receiving coil at that location, making it the ultimate propulsion method that can lead to high precision even when obstacles are encountered. 【Performance by Obstacle Type】 ■CASE-6: Cutting of steel sheet piles 3W ■CASE-7: Cutting of steel sheet piles 3 and H steel ■CASE-8: Cutting of wooden piles and steel sheet piles ■CASE-9: Cutting of H steel and existing manhole walls ■CASE-10: Cutting of underground continuous walls and metal objects *For more details, please refer to the PDF document or feel free to contact us.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

*Exhibition of Sewers '18 Kitakyushu*

We have showcased the "Underground Obstacle Response Type Mud Density Propulsion Method" that no longer fears obstacles!

**Exhibition Overview** Exhibition Name: Sewer Exhibition '18 Kitakyushu Date: July 24 (Tuesday) - 27 (Friday), 2018, for 4 days Time: 10:00 AM - 5:00 PM Location: West Japan General Exhibition Center Booth: C-822 **Exhibited Products** ■ Subsurface Obstacle-Compatible Slurry Shield Method The milling mole method is used in urban development and is a slurry shield method that safely performs construction by cutting through obstacles left underground. It can detect obstacles ahead of the excavation and discharge them as cutting powder of about 1 cm in size. If necessary, it allows for the injection of chemicals from within the machine and guidance of the tunneling machine using GPS. ■ Jet Method The jet method uses a CCD camera sensor to instantly measure the position of the tunneling machine on sharp curves. It enables long-distance and sharp curve construction in small-diameter tunneling. By using a dedicated pump cylinder and lubricant injection pipe for the jet method, it reduces the load on the pipe, allowing for long-distance tunneling even with small diameters. It is the most excellent all-around tunneling method that does not limit construction locations due to in-pipe measurement.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see for consultants! Sewer construction for the Olympics and rainwater management.

[Performance Collection Available] No worries even if obstacles appear underground! We detect and capture obstacles about 2 meters ahead of the tunneling machine and cut through them!

The demand for sewer construction is increasing due to the hosting of the Olympics in 2020 and sudden heavy rain, as well as measures for rainwater management. When the demand for construction rises and there is pressure to respond quickly, encountering obstacles buried underground can lead to a loss of time. Therefore, we recommend the milling mole method, which is safe even when encountering underground obstacles! The underground obstacle response type mud-based thrusting method, "milling mole method," is equipped with four special functions: "exploration, improvement, cutting, and guidance." It consists of three devices: a tunneling machine, special bits, and a special telescopic pipe, allowing for the precise cutting and removal of underground obstacles. Using electromagnetic waves, it explores and pushes forward while tunneling through metal obstacles, and it is also possible to improve the ground from within the tunneling machine before and after the detected obstacles. If an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued thrusting. Furthermore, a receiving coil is installed at a designated position within the access shaft, and a system is also equipped to guide the tunneling machine to that position, making it a thrusting method that can accurately reach the destination even when obstacles are present.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solving issues with construction methods! "Case Studies for Problem Solving Available"

The advancement construction method often faces many challenges during the excavation process. Here are examples of how those problems were solved!

Have you ever faced any of these issues when performing construction using thrusting methods? ▶ Construction was halted due to encountering obstacles like wooden stakes or H-beams... ▶ The time and cost of construction increased, leading to delays or interruptions... ▶ Construction over difficult distances could not be managed with standard equipment and methods... The "Milling Mole Method" solves these problems associated with thrusting methods! 【Example of a resolved case】 ✔ Sewer construction in Osaka City Planned to push 127 meters in one span using a standard mud slurry method with a diameter of φ80mm. Immediately after starting, the machine encountered wooden stakes, making it impossible to proceed, and the excavation was halted. By changing the plan to adopt the Milling Mole Method, the presence of obstacles was confirmed by discharging wood chips, and the thrusting was completed. ✔ Sewer construction in Osaka Prefecture Planned to push 119 meters in one span using a standard mud slurry method with a diameter of φ1800mm. While excavating about 10 meters, the machine encountered support piles of a bridge pier, making it impossible to proceed, and both the excavation machine and thrusting pipe were left underground. By changing the plan to adopt the Milling Mole Method, re-excavation was carried out from the same launch shaft. The reinforced concrete pipe that became an obstacle was cut, and the discharge of metal fragments, thrusting pipe collars, and rebar was confirmed, allowing safe passage through the obstacle section, and the thrusting was completed. *We are currently providing materials such as "Case Studies of Problem Solving" and "Comparison of Methods for Dealing with Obstacles in Thrusting Methods" from the PDF!

  • Special Construction Method
  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil cutting and reinforcement method "RBP Wall Method" [*NETIS registered method*]

Prevent collapse by stabilizing cut slopes and embankment earth! *For a limited time, we are offering technical materials that include examples of application and construction sequence for free!

The "RBP Wall Method" is a slope construction technique that involves excavating the ground from the top of the slope while securing the slope with reverse bolt panels as it is lowered. By combining reverse bolt paneling with rebar insertion, it prevents collapse through the stabilization of cut slopes and the surrounding ground. This method is applicable for road widening, land development, steep slope countermeasures, fall prevention measures, and slope stabilization in areas with small ground stress, limited space, or adjacent to structures. [NETIS Number: QS-160035-A] **Features** - Can be extended in either vertical direction - Always ensures slope stability - Allows excavation on steep slopes even in areas with low ground strength - Has significant resistance to ground behavior during earthquakes and other events *For detailed features, application examples, and construction procedures, please download the PDF of the "RBP Wall Method" technical documentation.*

  • Civil Engineering Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration