Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 HDD method (induced horizontal drilling) achieves shortened construction time and labor savings! 東洋工務店

Construction method Product List

3781~3795 item / All 4185 items

Displayed results

"Spider Drilling Method" Crane Type

No need for temporary scaffolding! Even when multiple projects overlap, significantly reduce construction days and costs! *Case study introduction*

The "Spider Drilling Method" uses extremely small and lightweight drilling machines, allowing for the construction of rebar insertion work while reducing temporary construction. Since a crane type does not require temporary scaffolding, it can be removed immediately after rebar insertion. It is effective when multiple types of work overlap, such as reverse construction. Additionally, it demonstrates its strength when there are restrictions on traffic regulation or usage time at the base of slopes. It shortens the lead time between different types of work, significantly reducing construction costs and days. 【Features】 - No temporary scaffolding required. Minimal temporary construction is acceptable. - Effective when multiple construction works are congested. - Suitable for slope work and measures against landslides on steep slopes. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method <Weather Resistance and Paint Deterioration>

The main bond is a pseudo-glass-like Si-O bond! Solar rays with wavelengths shorter than ultraviolet light are absorbed by the ozone layer.

We would like to introduce the mechanism of our "Ceramax Method," which is resistant to paint deterioration (chalking) and possesses weather resistance and ultra-long-term durability. The Ceramax used in this method is a paint that is strong against long-term durability and paint deterioration, made from inorganic alkoxysilane compounds. As a result, the main chain consists of pseudo-glassy -Si-O- bonds, which prevent paint deterioration and enable ultra-long-term durability. [Ceramax Used for Preventive Maintenance] ■ Ceramax #1000AL ■ Ceramax #2000 *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method <VOC Reduction>

There is no unpleasant smell of organic solvents! Reducing the burden on the Earth's environment and being considerate of the environment.

We would like to introduce the VOC reduction achieved through our "Ceramax Method." Ceramax is a solvent-free, inorganic coating material that does not contain or use thinners, unlike conventional paints. It reduces the emission of volatile organic compounds (VOCs) during application. Additionally, we have accumulated a track record of applications in various fields for purposes such as preventive maintenance. Particularly in tunnel interiors, construction can be carried out while sharing the tunnel, as no thinners are used. [Construction Examples] ■ Tunnel Interiors *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Disaster Prevention Wall Construction Method

A groundbreaking cantilever retaining wall that withstands sudden heavy rain has been completed.

The "Disaster Prevention Wall Method" is a hybrid retaining wall with a tandem structure. To effectively utilize 100% of the backfill gravel as self-weight, the thickness of the retaining wall is reduced, significantly decreasing the excavation width and volume of excavated soil. Additionally, each tier of the back blocks has drainage and collection functions, allowing any groundwater that emerges from any part of the slope to be drained to the front of the wall, making it a "groundwater discharge type retaining wall." It has also been developed to meet other criteria such as integration through cast-in-place concrete and safe emergency construction responses. 【Features】 ■ Cost-reducing method ■ Groundwater discharge type retaining wall with high drainage functionality ■ Strongly integrated retaining wall ■ Enables safe emergency construction ■ Reduces complaints about backfill gravel settling *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

For fall prevention in high-altitude work! C-ring method

[Construction video available] Achieving easy transportation! This is a construction method developed with a focus on "safety" and "convenience."

The "C Ring Method" utilizes a "C Ring" equipped with a pulley in a notched shape, eliminating the need to replace fall arrest devices (safety belts) for each span, allowing for free movement on scaffolding. By using various shaped parts, it can also be used as a pulley or trolley. Please feel free to contact us when you need assistance. 【Lineup】 ■ Scaffolding Through ■ Trolley Through ■ Hoist Through ■ Parts *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Landslide prevention case study by "Unit Net" 2

Conditions during heavy rain disasters at unit net construction sites.

Asakura City, Fukuoka Prefecture, Haki Hoshimaru, Shimizu Moto District From July 5 to 6, 2017, due to the inflow of warm and very humid air towards the stationary rainy front near the Tsushima Strait, a linear precipitation zone was formed and maintained, resulting in extremely heavy rain in the same location. This led to record-breaking rainfall in the northern Kyushu region and caused a heavy rain disaster. In Asakura City, Fukuoka Prefecture, where this heavy rain disaster occurred, unit nets were adopted and constructed in 2014 as part of a steep slope collapse prevention project. You can view the situation near the unit net construction site immediately after the disaster on the Geospatial Information Authority of Japan's YouTube account. The back side of the three-story building (elementary school) shown around 1:40 in the video below is the site where the unit net method was implemented. Despite numerous landslides occurring in the surrounding mountains, the area where the unit net method was applied did not experience any landslides. For more details, please refer to our company's website column and materials (available for download below).

  • service04-0001.jpg
  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Studies of Slope Stabilization Methods for Road Embankments: Shortening Construction Periods and Environmental Considerations

This is a slope stabilization method that allows for a shortened construction period and can be implemented in small spaces. We will introduce examples adopted for road embankments.

【Features】 ○ An environmentally friendly ground reinforcement method that allows for forest protection, landscape preservation, and greening of slopes. 〇 No large machinery required; can be constructed in narrow sites using lightweight materials. ○ Compared to conventional methods that use retaining walls and rebar insertion, it can reduce costs and shorten construction periods. 〇 Applicable even on cut slopes and collapsed slopes when used in conjunction with slope protection methods such as wire mesh and vegetation mats. ○ Registered with the Ministry of Land, Infrastructure, Transport and Tourism NETIS registration number KK-010068-V (published until April 2017). In road slope applications, it allows for early traffic opening compared to conventional methods and can be constructed in small spaces, making it a preferred choice. In areas where landscape consideration is necessary, such as tourist spots, it can also be made less noticeable with colored specifications. ◆ A collection of case studies can be downloaded for free from the link below! If you have any questions, please feel free to contact us!◆

  • スクリーンショット 2025-03-28 155819.png
  • スクリーンショット 2025-03-28 153531.png
  • douro032-e1531374262593.jpg
  • douro026-e1531372118311.jpg
  • douro018-e1531369780998.jpg
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of slope greening examples at solar power plants [Case study collection available].

The slope with a geology of comprehensive mountain sand was improved through polysoil greening work, as soil was flowing out every time it rained. *Case study collection and technical materials are currently available.

We would like to introduce a case where our Polysoil Greening Work was implemented at a solar power plant. "Polysoil Greening Work" is a slope greening method that firmly coats soil and sand slopes with an acrylic resin, providing quick erosion prevention, reliable full greening, and significant cost-effectiveness. *NETIS Registration: KT-210082-A 【Challenges Before Construction】 Due to the geology of the entire area being sandy soil, soil would wash away with every rain, resulting in muddy water. 【Results After Construction】 - There was no runoff at all even during heavy rain on the third day after construction. - Full greening was achieved in about one month. *For more details, please refer to the materials available for download in PDF format or feel free to contact us.

  • canvas.jpg
  • canvas2.jpg
  • canvas3.jpg
  • canvas4.jpg
  • canvas5.jpg
  • canvas6.jpg
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

D-Lite D Board Method ~ 3M × DAIKEN ~

Next-generation D-board (wall panel) construction method that balances design quality and processability like wood [non-combustible certification obtained].

The D Board method involves laminating 3M's 3M TM Di-Noc TM film onto a non-combustible substrate in the factory and then installing it on walls at the construction site. The Dailight D Board method uses a non-combustible material called 'Dailight,' made from DAIKEN's mineral fibers and volcanic ash glass materials, as the substrate. *Please refer to the materials below. 【Conventional D Board Method】 By manufacturing all boards in the factory and installing the completed boards, on-site work can be made more efficient. Since processing boards on-site is difficult, precise pre-measurement is necessary for board production. 【Dailight D Board Method】 Layout and board production are done based on drawings. Dailight has very high workability, allowing for on-site processing such as cutting edge boards and touch-up painting, which reduces the pre-measurement process and significantly shortens the overall delivery time. Since there is no film application work on-site, it is also recommended for customers who have never used the conventional D Board method!

  • Other wall materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Must-see for those in the Tohoku area!] Cross-section repair method 'sto dry spray method'

Construction can be completed in a short period! Dry spray method using polymer cement mortar.

The "sto Dry Spray Application Method" is a technique that allows for the repair and reinforcement of concrete structures using a unique silo system, enabling construction to be completed in a short period of time. A device called the spray supply system sprays polymer cement mortar at a high speed of 200 km/h. This method can be applied to various concrete structure repair works, such as cross-section repairs and the thickening of the underside of RC slabs, which were traditionally addressed by plastering methods, filling methods using formwork, and wet spray methods. 【Features】 - Shortened construction period - Reduced running costs - Excellent workability - Improved quality - Registered in the Ministry of Land, Infrastructure, Transport and Tourism's NETIS New Technology Information System *Quick response is available for those in the six prefectures of Tohoku. (Aomori, Iwate, Miyagi, Akita, Yamagata, Fukushima) For more details, please contact us or download the catalog.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Must-see in the Tohoku region! Cross-section restoration method 'sto dry spray method'

Construction can be completed in a short period! - Reducing construction costs, extending the lifespan of structures, and increasing durability - Dry spraying method using polymer cement mortar.

The "sto Dry Spray Application Method" is a technique that allows for the repair and reinforcement of concrete structures using a unique silo system, enabling construction to be completed in a short period of time. It sprays polymer cement mortar at a high speed of 200 km/h using a spray supply system. This method can be applied to various concrete structure repair projects and the thickening of the underside of RC slabs, which were traditionally addressed using plastering methods, filling methods with formwork, and wet spray methods. - Features Transport distance: Horizontal 300m, Vertical 150m Single layer application thickness: 6mm to 50mm (maximum 100mm) Can be applied under traffic vibrations Finishing with a trowel is possible No mixing work required on-site No issues such as blockage of the pumping hose, allowing for long periods of work interruption Easy to clean No formwork required No primer needed High-quality cross-section formation - Benefits Significant reduction in construction time Cost savings in construction Extension of the lifespan and durability of structures *Quick response is possible for the six prefectures in the Tohoku region. (Aomori, Iwate, Miyagi, Akita, Yamagata, Fukushima) For more details, please contact us or download the catalog.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Paving Material Laston Clogging Method "Miyabi"

Laston filling method: Fusion of resin pavement and filling agents, modern-style washout.

Our company handles the paving material "Miyabi" using the Laston filling method. 【Features】 ■ Beautifully blends into both traditional Japanese and modern spaces. ■ A durable floor finishing material that mixes the beauty of resin with the strength of mortar. ■ Reproduces the traditional washing-out technique without the need for water, finished by wiping with a sponge. ■ Combines natural stones (a mix of 2-minute and 3-minute stones) with filling material colors to create a rich and diverse color variation. \ For more details, please check "Download Catalog" /

  • IMG_1125.JPG
  • IMG_0526.JPG
  • 雅 台形.jpg
  • 雅商品荷姿.jpg
  • Plastering and painting work
  • Exterior and paving materials <General>
  • Pavement construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-pressure resin injection method Tarpan Type 2 method *Same results regardless of who performs the work!!

An automatic low-pressure injection method that eliminates variability caused by the operator by relying on the restoring force of the spring, ensuring the same results regardless of who performs the work!

The actual interior of the cracks has a complex shape and is not smooth like an acrylic plate. When injected with a grouting pump, the pressure is high, which speeds up the injection time, but considering the filling ability, high pressure is not necessarily always good. Additionally, in conventional methods, workers could not leave the site until the injection was completed, but with the automatic low-pressure injection method, once the capsule is set in the crack, the worker can leave the site as the operation relies on the spring's restoring force. This allows for a small number of workers to cover a wide area, and the significant feature of this product is that anyone can achieve the same results regardless of who performs the work. 【Features】 ■Ease of handling injection equipment! ■A wide variety of bases! ■Includes flat bases, corner bases, L-shaped joints for narrow widths, and holders, making it adaptable to any site! ■A trusted product featured in the LPIS (Automatic Low-Pressure Resin Injection Method Guidebook)! *For more details, please download the catalog or contact us directly.

  • Renovation and repair methods
  • Architectural design office

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal Waterproofing Construction Case Photo Collection

We would like to introduce examples of the construction of metal waterproof sky promenades.

The Sky Promenade is a waterproofing method that does not require regular maintenance. While conventional waterproofing requires maintenance every 5 to 10 years, the Sky Promenade is fundamentally maintenance-free. (Please note that drain cleaning is required.) Additionally, due to partnerships with major insurance companies, it comes with a 10-year warranty for standard specifications and a 30-year warranty for high-grade specifications. In recent years, the adoption of this waterproofing method has rapidly increased not only for balconies but also for rooftops. Site information is as follows from the photos on the left: 1. Fukuoka Prefecture (7.7 tsubo) 2. Nagasaki Prefecture (8 tsubo) 3. Ibaraki Prefecture (6.9 tsubo) 4. Aichi Prefecture (116 tsubo) 5. Okayama Prefecture (27 tsubo)

  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Setter method for detachable horizontal expandable devices.

More accurate and easier installation of detachable horizontal expansion devices! A unique construction method that pursues construction efficiency.

The "Setter Method" is a unique technique that ensures the reliable integration of expansion devices and post-poured concrete. It allows for the precise placement and fixation of removable expansion device anchor bolts in the end notch of beams, enabling post-poured concrete to be solidly filled without gaps. 【Features】 ■ Easy to ensure the flatness of the pavement surface and the joint body ■ Accurate positioning of anchor bolts ■ Simple installation and removal of special formwork (Setter) ■ Easy complete pouring and verification of post-poured concrete on the underside of the joint ■ Easy application of leveling material to prevent gaps caused by concrete drying shrinkage *For more details, please download the PDF or feel free to contact us.

  • 脱着式ヨコ型伸縮装置用 セッター工法_02.jpg
  • Bridge Materials
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration