Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 HDD method (induced horizontal drilling) achieves shortened construction time and labor savings! 東洋工務店

Construction method Product List

3721~3735 item / All 4185 items

Displayed results

Rockfall prevention combined type slope collapse countermeasure work "Eagle Hold"

It minimizes the felling of standing trees on slopes and excels in protecting natural landscapes!

We offer the "Rockfall Prevention Combined Slope Failure Countermeasure Construction." This method prevents slope failure by using rock bolts inserted into the ground, while also enabling rockfall prevention through a grid-like wire rope secured to a specially designed support plate, addressing both sources of slope failure and rockfall prevention. The main components remain unchanged from conventional slope failure countermeasure methods and rockfall prevention methods, and the design can be carried out according to each respective standard as before. 【Features】 ■ Rockfall Prevention ■ Slope Failure Countermeasure *For more details, please download the PDF or feel free to contact us.

  • 落石予防併用型 斜面崩壊対策工2.PNG
  • 落石予防併用型 斜面崩壊対策工3.PNG
  • 落石予防併用型 斜面崩壊対策工4.PNG
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Rockfall Countermeasures and Prevention Work for Important Infrastructure (Slope near Railway Crossing)

The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!

We would like to introduce a case where our "Tezak Super Lock (contact type)" was implemented in slope maintenance work near a railroad crossing. This project was commissioned by a private entity and carried out in Hyogo Prefecture. The soil type was gravelly soil, and it involved rockfall countermeasures and preventive work over an area of 1,500 m2. The contact type method involves installing thick wire mesh as auxiliary material to prevent erosion from gravel and other materials while preventing floating and rolling rockfalls. [Case Overview] ■ Project Name: Slope Maintenance Work Near Railroad Crossing ■ Location: Hyogo Prefecture ■ Construction Date: February 2021 (Reiwa 3) ■ Area: 1,500 m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • 19a.PNG
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.

Standard equipped with automatic irrigation system! A case study of thin-layer parking greening method installed on pavement.

In the fiscal year 2018 (H30), we would like to introduce a case where the "Tafutafu Park 55," a type of green parking method installed on pavement, was implemented in the greening project of a private factory employee parking lot. The existing asphalt was excavated by 55mm, and our product was embedded. Due to the limited number of parking spaces for employees, the project was divided into sections to ensure that employee parking could be maintained during construction. Please feel free to contact us if you have any inquiries. [Case Overview] ■ Project Name: 2018 (H30) Fiscal Year Private Factory Employee Parking Lot Greening Project ■ Location: Hyogo Prefecture ■ Construction Date: March 2019 (R1) ■ Area: 400m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • 12-2.jpg
  • 12-3.jpg
  • 12-4.jpg
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.

The construction period can be shortened, and even if there are no operating factories or alternative parking spaces available, it is possible to carry out the work with minimal yard space!

In the fiscal year 2022 (R4), we would like to introduce a case where the "Tafutafu Park 55" green parking method was implemented in the greening construction of a private factory employee parking lot. This method was adopted because it minimizes the removal of existing asphalt and can be constructed without affecting the operational factory. We excavated 55mm of the existing asphalt and installed our product. This method does not require the stripping of existing pavement such as asphalt or earthworks, allowing for a reduction in removal and disposal costs. 【Case Overview】 ■ Project Name: 2022 (R4) Fiscal Year Private Factory Employee Parking Lot Greening Construction ■ Location: Osaka Prefecture ■ Construction Date: October 2022 (R4) ■ Area: 1330m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • 13-2.jpg
  • 13-3.jpg
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A grassy area in a dog run where the grass tends to wither easily due to feces and urine.

Case from December 2019 (R1)! Implemented using a construction method that secures the root growth layer.

We would like to introduce a case study of the pressure-resistant green space construction method "Grass Strong" implemented at the Chiba Park Interaction Square. This project was commissioned by the Mito City Hall and carried out in Ibaraki Prefecture. The area covered was 2110 m², aimed at creating a grass square. This method features a structure that secures the root growth layer, preventing compaction due to foot traffic, and allows for a grass square that is free of protrusions, making it accessible for both people and vehicles. 【Case Overview】 ■ Project Name: 2019 (R1) Year Chiba Park Interaction Square ■ Location: Ibaraki Prefecture ■ Construction Date: December 2019 (R1) ■ Area: 2110 m² ■ Purpose: Grass Square *For more details, please refer to the related links or feel free to contact us.

  • 1-2.PNG
  • 1-3.PNG
  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A grassy area accessible to people and vehicles. Temporary parking during events.

A structure that ensures the growth layer of roots, preventing compaction due to foot traffic! An example of being used as a parking lot.

We would like to introduce a case of the pressure-resistant green space greening method "Grass Strong" implemented at the Tondabayashi Park lawn area, which also serves as a temporary parking lot. This project was commissioned by the Kishiwada Civil Engineering Office and carried out in Osaka Prefecture. During events, white lines are drawn to designate parking spaces. This method allows the lawn area to be used as a space accessible to people and vehicles, with no protrusions on the surface. 【Case Overview】 ■ Project Name: 2018 (H30) Tondabayashi Park Lawn Area and Temporary Parking Lot ■ Location: Osaka Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 5,100 m² ■ Purpose: Lawn Area *For more details, please refer to the related links or feel free to contact us.

  • 2-2.PNG
  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slope collapse countermeasure construction method "Eagle Hold" <Rockfall prevention combined type>

The maximum pull-out force of the reinforcement material can be applied up to 90 kN per unit based on field tests!

The design of the "Eagle Hold" divides the ground into areas requiring ground reinforcement and areas requiring rockfall prevention, and conducts structural calculations for each division according to conventional standards. In the "Slope Failure Countermeasure Ground Reinforcement Method," rock bolts are inserted into the ground in large numbers to reinforce the slope primarily through tensile strength. In the "Rockfall Disaster Countermeasure Rockfall Prevention Method," the initial movement of loose and rolling stones is suppressed by the restraining and supporting forces of a grid-like wire rope and anchors. 【Features】 ■ Addresses both slope failure and rockfall disasters ■ Design remains as before ■ Adapts to various terrains ■ Does not compromise natural scenery *For more details, please download the PDF or feel free to contact us.

  • ?イーグルホールド 画像2.png
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Japanese Roof Tile Series

Introducing flat tiles used in general residences, made from traditional Japanese temple tiles!

At Nippon Ceramics Co., Ltd., we handle the "Japanese Roof Tile Series." We offer traditional Japanese building materials, specifically tiles. We have traditional styles, reproductions, and modern tiles available. Our company deals not only with Japanese tiles and imported tiles but also a wide variety of products such as natural slate and resin roofing materials. 【Product Lineup】 ■ Honbuki tiles ■ Honbuki integrated tiles ■ Wagata 53A ■ S-type ■ Spanish tiles ■ F-type flat tiles ■ M-type: commonly used in residential buildings *For more details, please refer to the related links or feel free to contact us.

  • Japanese roofing tiles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hyogo Construction Case Study: Railway Proximity Work - Reinforcement and Elevation of Existing Protective Fences

A case of railway proximity work where reinforcement and elevation of the existing protective fence were carried out!

Here is a case study of the "Stronger Method" implemented in Hyogo Prefecture. As a result of the construction, the fence height increased from 1.55m to 3.0m, with a construction length of L = 13.0m. This method distributes the load, which was previously supported by a single span in conventional methods, across multiple spans by connecting the tops of the posts with steel rods. Additionally, in areas where there are concerns about insufficient fence height, height-raising materials can be used to increase the fence height. [Case Study] ■ Height-raising reinforcement type (Fence height: H = 1.55 → 3.0m, Construction length: L = 13.0m) ■ Hyogo Prefecture (Construction: FY 2015, Railway proximity work) *For more details, please download the PDF or feel free to contact us.

  • Protective fence

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Easy Vis for Metal Roof Covering Method

Ideal for overlaying on standing seam metal roofing (covering method)!

The Easy Vis is a screw used for overlaying metal roofs on top of slate roofing. 【Features】 ■ Significant reduction in screwing torque ■ Prevention of metal roof lifting ■ High pull-out strength comparable to coarse thread screws ■ Compatible with overlaying using sheathing boards *For more details, please refer to the PDF materials or feel free to contact us at the information below. Solar & Eco Division Contact Information https://daidohant.com/contact/ 06-6190-9936 Tags: Solar, Solar Panels, Solar Power Generation Systems, Solar Power, Decarbonization, Carbon Neutral, SDGs, Roofing Work, Renovation, EPC, PPA, Energy Saving, Renewable Energy, Storage Batteries

  • Metal roof
  • Roof and gutter construction
  • Solar mounting brackets and fittings (solar fittings and protective sheets)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NK rust stabilization anti-corrosion method to reduce the number of stripping cycles.

It reduces the number of times the coating peels off.

The NK rust stabilization anti-corrosion method can be applied while leaving an active film, allowing for the retention of lead oxide rust-proof paint and other materials that cannot be removed with a stripping agent, while only the exposed steel parts can be treated with a type 2 surface preparation. This reduces the cost of substrate preparation and eliminates the need for environmental safety measures such as enclosure and clean rooms. The paint system is a safe coating that does not contain harmful heavy metals.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road widening method "Wide Wall Method"

Simultaneously completed with the stacking of blocks! Road widening construction method!

The Wide Wall Method is a road widening system that is completed simultaneously with the stacking of blocks. It involves using trapezoidal blocks on top of large blocks to achieve road widening. Similar to the conventional construction of large stacked blocks, road widening can be accomplished simply by "stacking blocks," allowing for a maximum road widening of approximately 2.0 meters with three layers of Wide Wall blocks. It is ideal for the installation of pull-off areas, bus stops, and sidewalks in mountainous regions where full two-lane conversion is difficult! <Received the 11th National Land Technology Development Award "Regional Contribution Technology Award">

  • Stacking blocks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ninja Seal Bridge Expansion Joint Repair Method [For Aging Areas of Small Bridges!]

Simultaneous repair of the rear support Con! For repairing leaks and malfunctions occurring in bridge joints! Selected by the Ministry of Land, Infrastructure, Transport and Tourism for "Technology for Repairing Water Stop Sections of Bridge Expansion Devices"!

The "Ninja Seal Bridge Expansion Device Repair Method" is a cost-effective and simple technique using a two-component, room-temperature polyurea resin that suppresses water leakage by filling the gaps in the bridge expansion device and covering it uniformly. It utilizes a durable urethane-based resin material known as "soft stainless steel." No heavy machinery is required, and it can be easily and quickly applied even by those without specialized skills, allowing for simultaneous repairs of post-installed concrete. Additionally, since it does not involve fire, it reduces the risk of fire and burns. 【Features】 ■ Technology suitable for small-scale bridges ■ Can be applied by anyone ■ Applicable to straight butt joints ■ Can also accommodate slide joints and embedded joints (conditions apply) *For more details, please download the PDF or feel free to contact us.

  • 02.png
  • 03.png
  • 04.png
  • 05.png
  • 06.png
  • 07.png
  • 08.png
  • 09.png
  • 10.png
  • Reinforcement and repair materials
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos compression solidification method

Asbestos treatment aimed at further safety.

By adding a compression solidification process to the conventional asbestos treatment method, we provide enhanced safety. After the removal of asbestos, compressing and solidifying it significantly reduces the risk of asbestos dispersing, even if the bags are damaged during transport or at the final disposal site. This is AGUA's unique asbestos treatment method, ahead of increasingly stringent legal regulations in the future.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration