Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Stretchable Joint Repair Method "Ex Relife Method"

Construction method Product List

3346~3360 item / All 4216 items

Displayed results

High versatility corrosion protection and reinforcement method 'SCFR Method'

For the repair and reinforcement of steel pipe poles such as signposts and lighting poles!

The "SCFR method" is a repair technique aimed at preventing root rot in steel pipe columns, utilizing carbon fiber reinforced sheets (SCFR sheets) that also provide reinforcement effects. It is expected to have a repair effect lasting about 10 years. Additionally, by shaping the SCFR sheets into a "sudare" (bamboo blind) form, the workability on site is improved. Please feel free to contact us if you have any inquiries. 【Features】 ■ High adhesion ■ Increased strength ■ High versatility ■ Warning function *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Purification completed in 3 to 6 months! 'Bio-farming method'

The contaminated soil is purified by the action of bacteria.

The "Biofarming Method" is a technique that involves excavating contaminated soil and utilizing a dedicated purification facility to cleanse the contamination through the action of bacteria (bio). It is a highly reliable purification method that typically cleanses the soil to a safe condition in about 3 to 6 months, allowing the soil to be reused or backfilled at the original excavation site. *For more details, please download the PDF or feel free to contact us.*

  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Purification at the current location is possible! "Biopile Method"

It's okay if you can't secure enough space! We will purify the contamination by thoroughly mixing the necessary formulations and soil at the current location.

The "Biopile Method" is a technique used when a purification site for soil treatment cannot be secured. It involves thoroughly mixing the necessary agents and soil at the current location to achieve effects similar to those of the bio-farming method. It is suitable for cases where the depth of contamination is relatively shallow. *For more details, please download the PDF or feel free to contact us.*

  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

It is possible to purify underground contamination without excavation! "Bio-Injection Method"

It's okay to work in places like operating factories and gas stations where drilling is not possible! We remove underground contamination through pipes driven in from the surface.

The "Bio-Injection Method" is a technique used to remove underground contamination by driving pipes from the surface into the ground when excavation is difficult, and then injecting microbial agents, nutrients, oxygen, and other substances through those pipes. It is effective for purification in locations where excavation is not possible, such as operational factories and gas stations. *For more details, please download the PDF or feel free to contact us.*

  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super MC Method

Depth adjustment is easy with the dedicated adjuster! Simple installation by just tapping with a plastic hammer.

The "Super MC Method" allows you to maintain the value of a building without compromising its appearance through a simple construction method. There is no need to replace tiles as the masking cap fits any exterior wall. Additionally, it eliminates any visual discomfort, allowing you to keep a beautiful exterior. [Features] - No need to replace tiles - Compatible with any manufacturer for quarter anchors - No restrictions on anchor depth during installation - Easy construction by simply tapping with a plastic hammer - Excellent weather resistance paint *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New Crack Measurement System Method "KUMONOS"

Detect dangerous concrete "cracks" and prevent accidents that could endanger lives.

Our company offers a new crack measurement system method called 'KUMONOS' that enables the inspection of "cracks" on the walls of concrete structures (such as buildings, tunnels, and bridges) from the ground at a distance, achieving significant cost reduction and time savings. With the measurement system 'KUMONOS,' which excels in "economy," "safety," and "accuracy," we provide the necessary data for conducting crack inspections and making decisions on repair planning and execution. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Omnia (Half PCa Slab) Method

Achieving reduction in on-site work and shortening of processes! A construction method that does not affect the structure.

The Omnia (Half PCa Slab) method uses the Omnia panel, which is a "reinforced concrete slab that serves as both formwork and incorporates embedded Omnia Atlas." This Omnia method, utilizing the Omnia panel, achieves a reduction in on-site work and shortens the construction schedule. Additionally, since the design method is almost the same as conventional methods, changes from traditional methods are actively being made without affecting the structure. 【Advantages】 ■ It enables a reduction in the construction schedule. ■ Manufactured with steel formwork, resulting in a smooth and beautiful ceiling surface. ■ No need for floor formwork on-site, contributing to the protection of forest resources. ■ The bottom reinforcement is integrated, reducing the reinforcement work. ■ The Omnia Atlas reinforcement serves as a spacer for the top reinforcement, among other benefits. *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage and Water Supply Pipe Maintenance Device "ELCE"

Total management of water supply and drainage for buildings and apartments!

"ELCE" is a maintenance device for water supply and drainage pipes that eliminates the need for filter replacement and provides long-lasting effects. It resolves stubborn oil stains in drainage pipes and grease traps, contributing to reduced cleaning effort and prevention of unpleasant odors. It prevents scale buildup and removes rust inside water supply and drainage pipes, as well as preventing scale in cooling tower heat exchangers and packing materials, significantly reducing blowdown water. [Effects] - Maintenance and rehabilitation of water supply pipes / removal and prevention of red rust, scale, and slime - Maintenance and rehabilitation of drainage pipes / removal and prevention of red rust, scale, and slime - Humidity management / achieving humidity management in accordance with the revised Building Management Act - Toilet measures / removal and prevention of toilet uric scale and unpleasant odors *For more details, please download the PDF or contact us.

  • Sanitary fixtures
  • Drainage and ventilation equipment
  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-drug injection and iron removal treatment device FRA method

Environmentally friendly without using chemicals! A groundbreaking method for removing iron from groundwater at construction sites.

The "Chemical-Free Iron Removal Treatment Device FRA Method" is a groundbreaking technique for removing iron from groundwater at construction sites. It features an automatic backwashing system, enabling continuous operation (treatment) for 24 hours. Additionally, it achieves stable treatment without the need for adjustments, regardless of fluctuations in the iron concentration of the raw water or treatment flow rate. 【Features】 ■ Stable treatment capacity ■ Environmentally friendly chemical-free iron removal method that does not use chemicals such as chlorine or PAC ■ Easy to design and plan ■ Fully compatible with high concentrations of iron ■ Easy operation management, etc. *For more details, please download the PDF or feel free to contact us.

  • Unit and other construction
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Piled Wooden Hybrid Ground Improvement Method"

Ground improvement method using pile-like improvement materials covered with concrete and made of wood!

The "Piled Wooden Hybrid Ground Improvement Method" is a composite material ground improvement technique that enhances the durability of wooden pile improvement materials by covering the wood (mainly cedar lumber) with concrete and shaping the cross-section into a regular octagonal pencil-like form, thereby shutting out the supply of moisture and oxygen necessary for the growth of wood-decaying fungi. It can be constructed at a cost equivalent to existing soft ground improvement methods. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SW liner method

Construction is possible even under shared conditions! It has been developed to minimize work inside the pipe.

The method is a speedy and economical spiral-wound pipe rehabilitation technique. Since it can be constructed without stopping the flow in use, if repairs to the existing pipes are necessary based on prior investigations, the work can be carried out promptly without impacting local life. It has been developed to enable rehabilitation of large-diameter pipes with a diameter of 800mm or more, which often face many issues, without excavation and while allowing shared water to flow, as well as minimizing work inside the pipe. [Features] ■ Construction is possible even under shared conditions ■ Continuous structure without joints ■ Compact construction equipment ■ Reduction of work inside the pipe is possible ■ Speedy and economical *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PC construction method "NAPP method"

Due to the pretensioning method, the arrangement of the sheath and grout work are unnecessary! 'NAPP Method'

Our company offers the PC method "NAPP method" using hollow PC steel bars. In construction sites, prestressing force can be introduced without using reaction abutments or large jacks. Therefore, installation in narrow spaces is also easy. Additionally, since the NAPP units are prestressed in a strictly controlled factory, tension management on site is unnecessary. 【Features】 ■ As it uses a pre-tensioning method, there is no need for sheath placement or grouting work. ■ There is no set loss, allowing for reliable introduction of prestressing force even into short concrete members. ■ The NAPP unit has a small anchorage section and a reduced notch size, making it easy to integrate with rebar and other elements. ■ The NAPP anchor method enables bonding with existing concrete and reduces the burden on existing structures. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Silicon chrome steel oil-tempered wire "ITW"

Using an accurate control system for heating and cooling! Adjustable to any intensity according to customer requirements.

"ITW" is a high-quality spring steel wire that utilizes high-frequency induction heating technology. Due to rapid and short-time austenitization through high-frequency induction heating, fine crystal grains are obtained, and surface decarburization or oxidation of grain boundaries hardly occurs. Additionally, the synergistic effect of fine quenching structures and high-frequency short-time tempering allows for the simultaneous achievement of high strength and high toughness. [Features] - Minimal surface decarburization and oxidation of grain boundaries - Simultaneous attainment of high strength and high toughness - Adjustable to any desired strength according to customer requirements - Uniform strength is achieved throughout the entire length of the product - Variation in strength between product coils is kept to a very small level *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

EPS worm wheel

Realizing cost reduction and quality assurance through integrated production! Composite parts that transmit power with reliable technology.

The "warm wheel for EPS" has a higher bonding strength (adhesion strength) compared to injection molding. The use of resin significantly reduces noise during operation and also contributes to weight reduction. EPS achieves high energy efficiency with a clean drive system powered by an electric motor and optimal, minimal power assistance through electronic control, compared to traditional hydraulic power steering systems. 【Features】 ■ Induction heating technology is applied in the bonding process ■ The use of resin significantly reduces noise during operation ■ Contributes to weight reduction ■ Higher bonding strength compared to injection molding *For more details, please refer to the PDF materials or feel free to contact us.

  • Parts and Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock Bonding Work SP Bond Method

We have various products primarily made from ethylene-vinyl acetate synthetic polymer emulsions.

We would like to introduce the rock bonding construction method called "SP Bond Method." By simply mixing with a specified mixing liquid, high-quality polymer cement can be produced. We offer a range of products including the cement-based rock bonding material "SP Bond Filler," and the mortar bonding reinforcement material "SP Bond Emulsion," which enhances the physical properties of mortar such as impact resistance, flexural strength, abrasion resistance, and adhesion. For more details on other products and methods, please feel free to contact us. 【Features】 <Cement-based Rock Bonding Material: SP Bond Filler> ■ Main components: Ordinary Portland cement, natural aggregates ■ High-quality polymer cement can be produced simply by mixing with a specified mixing liquid. ■ High adhesion performance can be achieved by mixing with a diluted solution of SP Bond Emulsion at a 1:2 ratio with water. *For more details, please refer to the PDF materials or feel free to contact us.

  • Company:NRM
  • Price:Other
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration