Construction is possible even under shared conditions! It has been developed to minimize work inside the pipe.
The method is a speedy and economical spiral-wound pipe rehabilitation technique. Since it can be constructed without stopping the flow in use, if repairs to the existing pipes are necessary based on prior investigations, the work can be carried out promptly without impacting local life. It has been developed to enable rehabilitation of large-diameter pipes with a diameter of 800mm or more, which often face many issues, without excavation and while allowing shared water to flow, as well as minimizing work inside the pipe. [Features] ■ Construction is possible even under shared conditions ■ Continuous structure without joints ■ Compact construction equipment ■ Reduction of work inside the pipe is possible ■ Speedy and economical *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Construction Procedure】 1. Installation of the pipe manufacturing machine 2. Temporary pipe production work 3. Pipe manufacturing work 4. Storage of shared water 5. Filling work 6. Completion *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Get Co., Ltd., we primarily focus on pipe rehabilitation projects, and we engage in the development of technology, as well as the manufacturing and sales of materials and equipment. Additionally, we are expanding our business by importing and exporting products (such as water stop plugs, water stop valves, and water stop balls), as well as providing installation services. Please feel free to contact us if you have any inquiries.