Construction method Product List and Ranking from 29 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Reinforcement of existing beam after hole cutting: "Redouble Method"
  3. Leave the drainage repair work to us! "Neplus Method Construction Achievement Case Collection" 高橋土建
  4. 4 Rigid urethane coating waterproofing HU-B method 化研マテリアル
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

3016~3030 item / All 3125 items

Displayed results

Ceramax Method <Concrete Corrosion Protection>

We will also introduce leak test data that supports the corrosion resistance performance of concrete!

We would like to introduce the concrete corrosion protection of our "Ceramax Method." This method includes three elements that enable concrete corrosion protection: "salt resistance," "neutralization suppression," and "water absorption suppression." When we tested the corrosion protection performance by applying Ceramax to the outer and inner surfaces of commercially available mortar boxes, we found that when applied to the outer surface, there was no peeling of the coating due to water from the back side, thus maintaining waterproof functionality. When applied to the inner surface, it was found to block water permeability. [Ceramax used for preventive maintenance] ■ Ceramax #3000 ■ Ceramax #3600 ■ Ceramax RC *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method <Shortened Construction Period・Cost Reduction>

Reduced life cycle costs! Short painting intervals, and re-coating is possible after touch dry.

We would like to introduce the reasons why our "Ceramax Method" can shorten construction time. Depending on the process and application, a one-coat or two-coat finish is possible. The painting intervals are short, allowing for re-coating after touch-dry. Additionally, it reduces lifecycle costs and excels in weather resistance and durability. [Reasons for Shortening Construction Time] ■ A one-coat or two-coat finish is possible depending on the process and application ■ Re-coating time ■ Reduced lifecycle costs and excellent weather resistance and durability *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ceramax Method

Proposals for preventive maintenance and longevity of aging steel and concrete structures.

We would like to introduce our "Ceramax Method." It has ultraviolet durability that is several times greater than that of conventional paints, and it is effective for concrete corrosion prevention due to its salt resistance, prevention of neutralization, and waterproofing properties. It penetrates and hardens in fine pores of around 1μm due to its low molecular weight, providing high rust prevention capability. Additionally, the paint used in this method, Ceramax, has passed Type I and Type II tests for civil engineering anti-fouling materials. 【Features】 ■ Rust prevention capability ■ Weather resistance ■ Concrete corrosion prevention ■ VOC reduction ■ Shortened construction period ■ Non-combustibility *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco waterway construction method

Multifunctional environmental waterway with economic fish nesting functions and a 'small animal ascent and descent ramp' feature inside the waterway.

The "Eco Waterway Construction Method" consists of three types: bottom hole type, horizontal hole type, and combined type, which can be used according to the situation. The bottom hole type provides a habitat for bottom-dwelling organisms such as crabs and loaches by allowing sand and gravel or water to accumulate at the bottom of the waterway. The horizontal hole type creates a still water area, ensuring a habitat and refuge for juvenile and small freshwater fish. Additionally, the combined type incorporates both of the aforementioned types. The main body of the waterway uses conventional materials, making it economically feasible and easy to install a "multi-functional environmental waterway." 【Features】 ■ Direct use of conventional waterways that are 20cm deep ■ Entrance and exit secured with filler blocks ■ Ramp for small animals (soft slope) *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Toris method

With a little ingenuity and a gentle heart, we can provide breeding places for birds.

The "Toris Method" is a system that involves creating holes in newly constructed vertical precast concrete retaining walls and setting "soil column blocks" that can be used for nesting on the back side, thereby supporting breeding. The main target birds are the "kingfisher" and the "dipper." By using soil column blocks manufactured in a quality-controlled factory, there is no need to check the materials for the nesting area or manage the construction, as the nesting area is secured simply by installation. Additionally, since the surface is concrete, there is no erosion from rainwater like on a cliff with exposed soil, allowing the nesting function to be maintained for a long time. 【Products Offered】 ■ Soil column blocks for kingfishers ■ Soil column blocks for dipper *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

C-ring method

Achieve easy transportation! Suitable for fall prevention in high-altitude work.

The "C Ring Method" utilizes a "C Ring" with a pulley in a cut-out shape, eliminating the need to replace fall arrest devices (safety belts) that were traditionally changed for each span, allowing for free movement on scaffolding. By using various shaped parts, it can also be used as a pulley or trolley. Please feel free to contact us when you need assistance. 【Lineup】 ■ Scaffolding Through ■ Trolley Through ■ Hoist Through ■ Parts *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

When it comes to construction work, it's the "Milling Mall Method"! *Currently offering a collection of achievements by obstacle type.

[NETIS Registered] No worries even if obstacles arise! A construction method that is starting to be chosen nationwide! Compatible with diameters from φ800 to 3000 mm.

The "Milling Mole Method," a ground obstacle response type mud-based propulsion method equipped with four special functions: exploration, improvement, cutting, and guidance, consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the fine cutting and discharge of underground obstacles. Using electromagnetic waves, it explores metal obstacles ahead while propelling and can also improve the ground from within the tunneling machine before and after the detected obstacles. In the event that an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued propulsion. Additionally, a system is equipped to guide the tunneling machine to a designated position within the arrival shaft by installing a receiving coil at that location, making it the ultimate propulsion method that can lead to high precision even when obstacles are encountered. 【Performance by Obstacle Type】 ■CASE-6: Cutting of steel sheet piles 3W ■CASE-7: Cutting of steel sheet piles 3 and H steel ■CASE-8: Cutting of wooden piles and steel sheet piles ■CASE-9: Cutting of H steel and existing manhole walls ■CASE-10: Cutting of underground continuous walls and metal objects *For more details, please refer to the PDF document or feel free to contact us.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

*Exhibition of Sewers '18 Kitakyushu*

We have showcased the "Underground Obstacle Response Type Mud Density Propulsion Method" that no longer fears obstacles!

**Exhibition Overview** Exhibition Name: Sewer Exhibition '18 Kitakyushu Date: July 24 (Tuesday) - 27 (Friday), 2018, for 4 days Time: 10:00 AM - 5:00 PM Location: West Japan General Exhibition Center Booth: C-822 **Exhibited Products** ■ Subsurface Obstacle-Compatible Slurry Shield Method The milling mole method is used in urban development and is a slurry shield method that safely performs construction by cutting through obstacles left underground. It can detect obstacles ahead of the excavation and discharge them as cutting powder of about 1 cm in size. If necessary, it allows for the injection of chemicals from within the machine and guidance of the tunneling machine using GPS. ■ Jet Method The jet method uses a CCD camera sensor to instantly measure the position of the tunneling machine on sharp curves. It enables long-distance and sharp curve construction in small-diameter tunneling. By using a dedicated pump cylinder and lubricant injection pipe for the jet method, it reduces the load on the pipe, allowing for long-distance tunneling even with small diameters. It is the most excellent all-around tunneling method that does not limit construction locations due to in-pipe measurement.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see for consultants! Sewer construction for the Olympics and rainwater management.

[Performance Collection Available] No worries even if obstacles appear underground! We detect and capture obstacles about 2 meters ahead of the tunneling machine and cut through them!

The demand for sewer construction is increasing due to the hosting of the Olympics in 2020 and sudden heavy rain, as well as measures for rainwater management. When the demand for construction rises and there is pressure to respond quickly, encountering obstacles buried underground can lead to a loss of time. Therefore, we recommend the milling mole method, which is safe even when encountering underground obstacles! The underground obstacle response type mud-based thrusting method, "milling mole method," is equipped with four special functions: "exploration, improvement, cutting, and guidance." It consists of three devices: a tunneling machine, special bits, and a special telescopic pipe, allowing for the precise cutting and removal of underground obstacles. Using electromagnetic waves, it explores and pushes forward while tunneling through metal obstacles, and it is also possible to improve the ground from within the tunneling machine before and after the detected obstacles. If an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing for continued thrusting. Furthermore, a receiving coil is installed at a designated position within the access shaft, and a system is also equipped to guide the tunneling machine to that position, making it a thrusting method that can accurately reach the destination even when obstacles are present.

  • Site and ground investigation
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

OSORA Living: Photo Collection of Rooftop and Balcony Space Utilization

Utilizing rooftop and balcony spaces to create living areas. We would like to introduce examples of construction for a new housing option, [OSORA Living].

The 【OSORA Living】 creates a living space within the home by arranging flooring materials and furniture in the rooftop area. It is a new option for housing. You can enjoy various activities tailored to your lifestyle, such as "inviting friends for a BBQ," "dog run," and "a relaxing space for family to experience the extraordinary." 【Site Information】 Photos from the 【left side】: 1. Fukuoka Prefecture (83 tsubo) 2. Tochigi Prefecture (14 tsubo) 3. Chiba Prefecture (11 tsubo) 4. Kanagawa Prefecture (5 tsubo) 5. Aichi Prefecture (4 tsubo) 6. Saitama Prefecture (2 tsubo)

  • Exterior Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Repair work for stone walls and stone masonry 'Tosui CON Filling Method'

One 4-ton truck can work anywhere! A low-cost stone masonry and stone wall repair method that doesn't require heavy machinery! Since the construction period is short, traffic disruptions are minimized! Please take a look at the construction photos.

The "Tosui CON filling method" is a construction technique aimed at preserving and maintaining existing structures while maintaining landscape formation. We have received support for "short construction periods! Low budgets! Construction without heavy machinery, regardless of location!" and requests for construction have rapidly increased, primarily from municipal offices. For the deterioration of stone masonry and stone walls in riverbanks, waterways, and residential areas, a plant is set up on a 4-ton truck brought to the site, and Tosui CON (aggregate, cement, water, B.CON + S), which excels in permeability, strength, durability, and workability, is injected and filled through joints and cracks. This helps maintain the stability of the stone masonry and suppresses piping phenomena by draining water from the joints. Waterproofing is also possible by changing the materials used. 【Features】 ■ Discharge of backwater is possible ■ Does not encroach on river cross-sections ■ Easy construction in narrow areas ■ Compact plant yard ■ Extended pumping hoses allow for extensive construction NETIS Registration Number: CG-140010 Hiroshima Prefecture Infrastructure Deterioration Countermeasures (Longevity Technology) Registration No. 26-007-2 *For more details, please refer to the catalog or feel free to contact us. 【NEW】We have created a photo collection of recent construction examples. Please download and take a look.

  • Company:ESP
  • Price:Other
  • River construction
  • Other construction services
  • stone

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration