Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

2986~3000 item / All 4235 items

Displayed results

Strike Method: Installation Pipe Advancement Method Using Combined Auger Pressing

A construction method for installation pipes using a combined auger and pressure insertion technique that incorporates special branches with earthquake resistance and water tightness!

The "Strike Method" is a pipe installation and advancement technique that utilizes a combined auger and pressure insertion method to achieve effective ground improvement by injecting chemical solutions after the arrival of the casing pipe at the main pipe to be installed. Even when installing the main pipe under heavily trafficked roads, construction can be carried out from a distant shaft, contributing to the alleviation of traffic congestion. 【Features】 ■ Installation of a φ150mm pipe onto a φ200mm PVC pipe ■ Installation onto fume pipes and shields ■ φ2,000 casing shaft initiation (φ1,500 casing shaft initiation is also possible; separate calculations apply) ■ Chemical solution injection to the reach section can be performed from within a φ1,500 casing pile ■ Adoption of special branch pipes that are earthquake-resistant and watertight *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Ground foundation construction method
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Diameter Pipe Propulsion Method "Three Pipe King (R) DRM MVP301"

Response to stagnant water sand layers! A small-diameter pipe jacking method that can control the amount of soil and sand intake during advancement.

The "Three-Pipe King (R) DRM MVP301" is a small-diameter pipe jacking method suitable for saturated sand layers. It allows for control of the amount of soil intake during jacking. Complete water stoppage can be achieved when setting the pipes, preventing auger sticking. 【Features】 ■ Permeability coefficient K = 10(-2cm)/SEC to 10(-3cm)/SEC or less ■ Water head difference within 3 to 5m ■ Control of soil intake during jacking is possible ■ Tools can be used interchangeably with other models ■ Launching from a shaft with a diameter of φ1500 is possible (Note: Pipe length 0.5m) *For more details, please download the PDF or feel free to contact us.

  • Drilling Machine
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floating repair method "Press Down Grout Method"

It is possible to carry out repairs that are reliable and safe without compromising the design! It can accommodate thin finish thickness for floating injection.

The "Press Down Grout Method" is a suitable technique for repairing floating issues in 50 two-tile direct finish where injection is difficult. By securing with an aluminum frame, it can accommodate thin floating injections. 【Features】 ■ Reliable and safe repairs without compromising design ■ Ideal for repairing floating issues in 50 two-tile direct finish ■ Accommodates thin floating injections *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transparent resin tile pin fixation peeling prevention method "JK Cerider Method"

High waterproofing and barrier properties unique to acrylic resin! Prevents deterioration of exterior walls and contributes to the longevity of buildings.

The "JK Serider Method" is a tile falling prevention method that reinforces tiled exterior walls using a special acrylic resin called "JK Serider," which contains short fibers, and special anchor pins. Thanks to the high waterproofing and barrier properties of the acrylic resin, it prevents the deterioration of exterior walls and contributes to the longevity of the building. The coating is colorless and transparent, preserving the luxurious texture of the tile finish, allowing it to be maintained beautifully over time. 【Features】 ■ Excellent tile falling prevention function ■ Improved durability ■ Colorless and transparent finish *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Spiral Bolt SP24

The head protection materials (cap/mat) for waterproof sheet installation are no longer necessary.

The "Super Spiral Bolt SP24" is a high-strength locking bolt that inherits the excellent features of the "SN Twist Bolt." It features a newly designed special rib and screw section that are simultaneously formed during the round steel rolling process, resulting in no cross-sectional defects in the screw section and consistent strength throughout its length. 【Excellent Characteristics】 - It uses high-strength material SD685, achieving a high yield load of over 297 kN while being even lighter (3.4 kg/m) than the SN Twist Bolt. - By maintaining the same material diameter and reproducing the surface shape of the SN Twist Bolt, the insertion resistance is equivalent to that of the SN Twist Bolt. - It inherits the excellent anchoring characteristics of the SN Twist Bolt, with high adhesion toughness against ground deformation during the early age of the anchoring material, making it less prone to adhesion failure. - The adoption of the special-shaped nut "S Nut" reduces the protrusion of the nut and bolt, eliminating the need for protective materials (caps/mats) during waterproof sheet installation. *For more details, please refer to the PDF document or feel free to contact us.*

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

AGF-Me (Metal eco) construction method

It is possible to separately collect steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as sorted industrial waste.

The "AGF-Me (Metal eco) method" is a patented method (Patent No. 3882118) for the non-widening long steel pipe advance construction. It features vertical slits in the end-reinforcing steel pipes of the cutting section during tunnel excavation with non-widening support, allowing for the separate recovery of the steel pipes and injected materials during excavation. This method eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste. [Features] - Patent No. 3882118 obtained - Structure allows for the separate recovery of steel pipes and injected materials during excavation - Eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lock bolt plate "Signal Washer"

Real-time status monitoring is possible! Visualization of ground strength and plates for rock bolts.

The "Signal Washer" is a plate developed to detect ground displacement caused by high earth pressure. It is set with a standard rock bolt, and when the axial force generated in the bolt exceeds a certain level, the coating of the special paint applied to the washer peels off, allowing for easy visual confirmation of changes. 【Features】 ■ 24-hour real-time status monitoring ■ Easy installation ■ Visualization of status changes ■ No electricity required ■ Patent registered ■ NETIS registered KT-180047-A *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hybrid Fore-Piling"

Enhance blade stability with a combined pattern of "long-length fore piling" and "long-length mirror reinforcement work."

"Hybrid Fore-Piling" is a construction method that is expected to have a higher effect in suppressing the plasticization of surrounding ground. By placing small-diameter steel pipes from the upper part of the mirror section towards the top, it is possible to reinforce not only the "top section" that is reinforced by conventional fore-piling but also the "upper ground of the mirror surface," which has a high risk of collapse. [Features] - By increasing the overlap section, it can reinforce the surrounding ground over a wide area, including the mirror section. - Compared to conventional fore-piling, it has a higher effect in suppressing the plasticization of the ground. - By using small-diameter steel pipes (φ76.3), it is more economical than before. *For more details, please refer to the PDF materials or feel free to contact us.

  • Work tools
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple Repair Method for Guardrail Posts "GPR Method"

No need for maintenance time! We have developed a method to repair supports through partial construction.

The "GPR method" is a groundbreaking repair technique that applies the technology of steel pipe expansion-type lock bolts to repair corroded parts of guardrail posts. It features simple work that does not require exploratory drilling and does not need special construction techniques. Additionally, the construction equipment is compact, and the work time per location is extremely high at just 10 to 20 minutes. [Features] ■ Adoption of highly corrosion-resistant plated materials ■ Simple construction that does not require special construction techniques ■ Instant repair from the inside of the post using expansion steel pipes ■ Speedy construction ■ No exploratory drilling required *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shear Reinforcement Method "RMA Method"

Construction technology certification acquisition method! No need for mortar mixing or installation of injection holes on site!

The "RMA method" is a shear reinforcement method that allows for reinforcement without encroaching on the inner cross-section of continuous walls. It employs capsules containing premixed mortar as a bonding agent. This method enables construction using impact techniques for long or thick reinforcing bars, making it a post-installed method. Since there is no need for mortar mixing or the installation of injection holes on-site, special management is unnecessary. Reinforcement is carried out only for the insufficient shear capacity, allowing for a transition from shear failure-dominant to bending failure-dominant. 【Features】 ■ Drilling can be done with a small diameter and only once ■ No mixing on-site, maintaining consistent quality ■ Simple product composition and construction method, reducing construction time ■ Minimal interference with existing structural rebar, allowing for reduced re-drilling due to high stopping capability ■ A method that does not use large or special machinery, saving space *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Sewerage facilities
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gainamesh method [fall prevention measures]

It has excellent durability, conforms to the curved surfaces of tunnels, and prevents the spalling of concrete fragments.

■NETIS Registered, Registration Number: KK-240048 ■High-strength aramid fibers reliably prevent the spalling of concrete pieces. This construction method aims to prevent the spalling of concrete pieces in concrete structures using GFRP shape retainers and high-strength aramid fiber mesh, ensuring the safety of users of the structures. *This meets the quality standards specified in the NEXCO Tunnel Construction Management Guidelines. 【Features】 The mesh part allows for visual inspection after construction. By using high-strength aramid, there is less alkali deterioration due to groundwater, and since it does not conduct electricity, it can also be applied in railway-related tunnels. Installation is quick and easy, as it only requires driving in strike anchors. Additionally, if any deformation is observed after construction, maintenance such as removing and reattaching the fixing screws can be easily performed. By using a locking K-nut with a friction ring (leaf spring), it provides a function to prevent detachment, enhancing safety. This locking K-nut meets NAS standards, which are specified as verification items during material approval by NEXCO.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lock bolt plate "Bump Press Washer"

Plate for rock bolts that is gentle on waterproof sheets and shotcrete.

* Integrated nut washer * Flat surface of the washer * Sheet is less likely to be damaged * Pull-out test can be performed as is

  • Tunnel Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SR-LG construction method

"Long-distance pumping" backfill filling method using plastic grout.

* NETIS Registration Number: HK-120037-VR * Quality standards compliant with the design and construction guidelines for backfill cavity injection in sheet pile method tunnels at NEXCO * Capable of long-distance pumping (Track record: 4,000m) The plastic grout material is non-air-based, allowing for long-distance pumping. * Construction possible at external plants Main materials and plasticizing materials (liquid) can be pumped from external plants, and the main materials do not harden alone for long periods, resulting in fewer troubles during pumping. * Environmentally friendly using recycled materials Utilizing fly ash contributes to effective resource utilization. * Ensuring high quality With high underwater non-separation properties, work in flowing water is easy, making it an ideal method for sites with groundwater, standing water, or flowing water. * Working environment The installation of plants externally and the liquid nature of the plastic materials result in minimal dust generation in the working environment inside the structure.

  • Tunnel Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid seismic reinforcement method

It is a seismic resistance construction method that joins seismic braces using epoxy resin and anchors in two different ways.

Compared to conventional methods, the number of post-installed anchors can be reduced, and since roughening of the existing structure is unnecessary, noise, vibration, and dust can be minimized, allowing for construction while remaining in the building. By adjusting the number of post-installed anchors on the existing framework, reinforcement effects can be secured as needed. Due to the indirect connection with head-mounted studs, the lap length can be reliably secured, ensuring high quality. This method can also be used as a steel brace with openings.

  • ハイブリッド工法7.JPG
  • ハイブリッド工法6.JPG
  • ハイブリッド工法8.JPG
  • ハイブリッド工法9.JPG
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil-based natural grass surface finishing "3D Field Leveling Method"

Combining dedicated equipment 3D field levelers with information-based construction, we achieve a high level of precision in paving!

The "3D Field Leveling Method" is a technique that uses our specialized equipment, the 3D Field Leveler, to achieve a very high precision in finishing pavement flat. In various sports fields and school grounds, ensuring the flatness of the pavement surface is essential from the perspective of drainage and other factors. With the 3D Field Leveling Method, we can ensure high precision flatness in natural grass paving, leveling of turf soil, and finishing of clay pavements. *For more details, please refer to the related link page or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration