Planting Gardening
I feel the change of the seasons.
We will provide a beautiful garden.
- Company:ハマニグリーンパーク
- Price:Other
Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.
Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.
Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.
2521~2535 item / All 4228 items
I feel the change of the seasons.
We will provide a beautiful garden.
Warm winds of Southern Europe into your life.
Significant cost reduction through direct import.
We will protect the natural environment without polluting the earth or the water.
Natural materials such as crushed stone are hardened for paving using side pavement methods and rock load methods.
Eco-friendly!!
Full adoption of antibacterial concrete.
Significantly shorten the work process while improving the safety of construction work!
The "LIBRA Method" makes it easy to secure the center of the piles by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and significantly reducing the complexity of reinforcing bridge piers on sloped terrain. It is developed with the aim of improving the safety of temporary bridges and temporary piers while pursuing a reduction in construction time, and simultaneously minimizing the impact on the natural environment. Additionally, since the connection points of the new panels to the pile bridge piers serve as guides for steel pipe driving, it reduces the work for shaping the base surface and installing guides on sloped surfaces, thereby enhancing safety and minimizing the impact on the natural environment. 【Features】 ■ Shortened construction period ■ High safety ■ Improved workability ■ Consideration for the natural environment ■ Stable construction 【Method Specifications】 ■ Pile Diameter: Φ457.2, Φ508, Φ609.6, Φ800 (mm) ■ Span Length: 6, 8, 10, 12.5, 20 (m) ■ Load: Automobile, crawler crane (70-200t lifting) *For more details, please refer to the catalog or feel free to contact us.
Acquisition of construction technology review certification! The latest technology for safe and rapid underground obstacle removal!
The A-CR method is a new system for safely removing underground obstacles using heavy machinery with low noise, low vibration, and a low center of gravity. It addresses the challenges of traditional underground obstacle removal methods through a crane-suspended crusher that operates freely within the casing. *For case studies, please visit our website via the related link.
It is also used in construction to protect cities from flooding caused by guerrilla rainstorms! It is utilized in the construction of vertical shafts for access tunnels.
The "Large Diameter Deep Depth Steel Pipe Installation Method (φ3200)" is a method for directly rotating and installing steel pipe piles equipped with a drilling bit at the tip. It utilizes a full-circle rotary drilling machine with one of the largest diameters in the country, φ3200mm, capable of handling various underground construction projects. If necessary, large-diameter steel pipes can be directly rotated and installed into bedrock layers. The new technology of casing inner drilling allows for low-noise and low-vibration construction driven by hydraulic power, making it suitable for nighttime work in urban areas. 【Features】 - A method for directly rotating and installing steel pipe piles equipped with a drilling bit at the tip. - Utilizes a full-circle rotary drilling machine with one of the largest diameters in the country, φ3200mm, capable of handling various underground construction projects. - Large-diameter steel pipes can be directly rotated and installed into bedrock layers if necessary. - Effective in construction projects that protect cities from flooding caused by sudden heavy rains. - Can also be used for the construction of launch and arrival shafts for various shield projects. *For more details, please refer to the PDF materials or feel free to contact us.
Acquisition of construction technology review certification! Directly driving steel pipe sheet piles into bedrock.
The "Micro Joint Pile Method" is a rock embedding method using special short-length jointed steel pipe sheet piles that eliminates the need for pre-drilling at the joint sections. By utilizing special short-length joints (micro joints) to shorten the pitch, the labor of pre-drilling is eliminated. By installing micro joint-type steel pipe sheet piles specifically designed for this method at approximately one-fourth the conventional short pitch, pre-drilling at the joint sections becomes unnecessary, allowing for simultaneous rock excavation and installation of steel pipe sheet piles in one process. 【Features】 ■ Construction technology review certification obtained ■ Direct installation of steel pipe sheet piles into rock layers is possible ■ Rental options for steel pipe sheet piles are available ■ Elimination of pre-drilling labor through pitch shortening with special short-length joints *For more details, please refer to the PDF materials or feel free to contact us.
Birth of a multi-driver compatible with hard rock formations! High-speed drilling with a hydraulic casing pipe drilling device!
The "Screw Driver Method" can accommodate a wide range of drilling diameters from φ800 to 3200mm. While performing casing drilling with a fully rotating all-casing drilling machine known for its drilling capabilities, it utilizes a screw-type middle drilling device to intermittently discharge large volumes of soil in an earth drill manner, achieving simultaneous improvements in speed, quietness, and environmental performance. This is a new standard that consolidates the features of conventional methods. 【Features of the Screw Driver Method for Hard Ground】 ■ Screw type ■ The storage capacity of excavated soil is approximately 8 to 25 times that of a hammer grab, significantly reducing the number of discharges ■ The discharge efficiency improves compared to a hammer grab in proportion to depth ■ Reliable shear excavation is possible for general earth, consolidated clay layers, gravel layers, sand and gravel layers, soft rock layers, etc. ■ It can be used not only for casing rotary drilling methods but also as a middle drilling device for pipes such as steel pipes and steel sheet piles. *For more details, please refer to the PDF materials or feel free to contact us.
Low vibration, low noise, casing drilling! Enables various pile construction in confined spaces!
The "Narrow Space Clearance Construction Method" is a machine configuration that combines a narrow space-compatible drilling machine, modified from the specifications of a full-rotation all-casing general-purpose machine, with a hydraulic telescopic boom crawler and a hydrograb. This design minimizes the occupied area and adapts the machine for pile construction in confined spaces. The standard working space for a φ1500mm class drilling machine is more than 160m2, with a width of 8m, a length of 20m, and a headroom height of over 5.5m. 【Features】 ■ Capable of various pile construction in narrow spaces ■ Low vibration and low noise during casing drilling ■ All main machines are hydraulically driven ■ The combination of the narrow space-compatible drilling machine, hydraulic telescopic boom crawler, and hydrograb allows for construction under headroom restrictions of 5.5m *For more details, please refer to the PDF document or feel free to contact us.
Reduction of the number of piles due to the long span girder construction! Temporary bridge and temporary pier construction using a 20m span unified erection method.
The "L Pier Construction Method" utilizes high-strength materials for the fabrication of girders and steel pipe piles, allowing for the use of large construction machinery capable of operating in an 8-meter width, achieving a maximum span length of 20 meters through vertical installation. This method can accommodate year-round placement within rivers, eliminating the need for repeated installation and removal during non-flood periods. As a result, it can be utilized for the construction, renewal, and maintenance of large river structures such as long bridges, as well as for wide-ranging disaster recovery and reconstruction projects, including construction piers, detours, and emergency bridges. It is the first long-span compatible LIBRA bridge. By connecting the pile frame with brace pipes and brace materials in a ground assembly and installing them as a unit, the need for lifting operations is eliminated, enhancing safety. **Features** - By pre-installing the assembled upper panels through reaction poles, safety and workability are improved. - The use of high-strength materials for the main frame enhances quality and strength. - Connecting the pile frame with brace pipes and brace materials in a ground assembly and installing them as a unit eliminates the need for lifting operations, improving safety. *For more details, please download the PDF or feel free to contact us.*
The ACPD method (Ground and Safe Construction Method) is a foundation ground improvement technique that uses only natural materials: "crushed stone, air, and water."
The ACPD method is a type of compressional pile that constructs good boreholes without using casing in soft ground. This method incorporates some elements of the composer method into the compressional type, aiming to be environmentally friendly and ensure stable quality.
The bulk lifting and lowering method is the foundation of the Perfect Method.
In the work area, set up scaffolding above the lifting device known as the Perfect Beam, and during the waiting time for signals, move it directly below the installation position and lift it to a height that does not obstruct traffic.
The gecko method is a technique used when bulk lifting or lowering methods cannot be employed.
Assemble a frame-type suspended scaffold in a location that does not obstruct traffic, attach a hanger rail to the lower flange of the steel beam after lifting, fit a plain trolley onto the rail, and then suspend the frame-type scaffold from there.
Minimize the dangers of working at heights to as close to zero as possible! Eliminate the risk of falling objects as well.
The "Perfect Construction Method" is a technique devised to eliminate accidents caused by worker falls and the dropping of scaffolding materials, with the aim of reducing traffic restrictions. Our scaffolding uses a fully boarded suspended scaffold made from modular steel frames. Since the scaffolding is assembled and lifted on top of a lifting device (Perfect Beam), there is less high-altitude work. During the installation and dismantling of the scaffolding, there are fewer openings, making it a safe scaffold for workers and passing vehicles. Additionally, compared to conventional scaffolding, there are no gaps or steps, which prevents material drops and enhances work efficiency. *☆* For more details, please download or contact us *☆*