The bulk lifting and lowering method is the foundation of the Perfect Method.
In the work area, set up scaffolding above the lifting device known as the Perfect Beam, and during the waiting time for signals, move it directly below the installation position and lift it to a height that does not obstruct traffic.
Inquire About This Product
basic information
【Features】 ○ In construction work, the method is possible if the span between vents is 7m or more. ○ In maintenance work, the method is possible if a work zone can be secured with one span before and after the erected scaffolding. ○ The traffic stoppage time is short, lasting only 2 to 3 minutes. ● For more details, please contact us or download the catalog.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
*For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
To eliminate the risks associated with the assembly and disassembly of suspended scaffolding required for tasks such as bridge installation and painting, a construction technique for suspended scaffolding that simplifies assembly and disassembly work at heights has been certified by the National Institute for Land and Infrastructure Management as "General Civil Engineering Method - Publicly Solicited Technical Review Certificate" No. 404, in March 1993.