Construction method Product List and Ranking from 26 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"
  3. Rigid urethane coating waterproofing HU-B method 化研マテリアル
  4. 4 Unrestricted Foundation Roller Method 'Cerami RC-FR Method' エスケー化研
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

2431~2445 item / All 2471 items

Displayed results

Vibro hammer method

Rapidly and temporarily reduce tip resistance and friction resistance! Introducing the vibro hammer method.

We would like to introduce the "Vibro Hammer Method." This method involves using a vibration-type pile driver to transmit forced vibrations to piles and steel sheets, rapidly and temporarily reducing the resistance at the tip and the friction resistance, allowing for driving and extraction. Please feel free to contact us when you need our services. 【Features】 ■ Rapid and temporary reduction of resistance at the tip and friction resistance *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal for Eco-Recycling Method of Temporary Water Supply and Drainage to Contribute to the Environment and Alleviate Labor Shortages.

Over 100 successful hires in the last 5 years. Contributing to waste reduction and cost savings. [*Nationwide support available]

The "Temporary Water Supply and Drainage Eco-Recycling Method" is a construction method that handles everything from the application for water supply and drainage at new construction sites to the planning, proposal, construction, and removal of temporary piping and water supply and drainage for site offices. By separating the work of temporary water supply and drainage from the busy tasks at the start-up of the site, this new initiative reduces the burden on the responsible personnel and contributes to the reduction of industrial waste through the reuse of temporary materials. 【Features】 ■ Design, estimation, and application agency ■ Construction, reconfiguration, and removal support ■ Environmental impact reduction *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seamless Terrazzo Method

The PCP-YYF method of Perfect Wash! It is possible to create a mysterious and extraordinary experience.

We would like to introduce our "Seamless Terrazzo Method." The Seamless Terrazzo Method is an artificial stone that achieves a higher level of beauty with nearly infinite design and coloring options, seamlessness, excellent durability, and significant reductions in construction time. The joints can be freely arranged, allowing for creative design. Additionally, because it can be colored freely, it can be finished in an infinite variety of designs that match a single color or your preferred colors. 【Features】 ■ Joints can be freely arranged ■ Can be finished in an infinite variety of designs that match a single color or your preferred colors ■ Flexible ■ Resistant to extreme cracking, including hairline cracks ■ Strong against chemicals, oils, bacteria, etc. *For more details, please refer to the related links or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cement terrazzo method

Excellent in UV resistance, heat resistance, and weather resistance! A method that can be used both outdoors and indoors.

We would like to introduce our "Cement Terrazzo Method." This method is an evolution of traditional hand polishing. It involves mixing your preferred aggregates with cement and then applying and grinding the mixture. By varying the colors of the aggregates and cement, it is possible to create a unique design. This method is used in outdoor areas such as commercial facilities, and the combinations of designs are virtually limitless. 【Features】 ■ Excellent UV, heat, and weather resistance, suitable for both outdoor and indoor use ■ Can be applied to both existing and new constructions *For more details, please refer to the related links or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-profile casing conveyance down-the-hole hammer method LH-CDH

Low-altitude, under-bridge, under-railroad, under-road bridge, and under-power-line casing conveyance type down-the-hole hammer method!

We would like to introduce our "Low-Headroom Casing Continuous Down-the-Hole Hammer Method LH-CDH Method." By using a special bit and continuously installing protective steel pipes for the borehole walls, we can reliably excavate to the designed height even in collapsed layers with high groundwater levels. After excavation, the steel pipes are left in place, allowing for the extraction of the hammer bit, which ensures that core material installation and solidification with mortar can be carried out effectively. Please feel free to consult us when you need our services. 【Construction Examples (Partial)】 ■ LH-CDH Method - Height restriction: 4.55m (under highway bridge) - Steel material: H300 L=11.5m continuous pile construction - Construction machinery: RX2300 low-headroom construction machine HGS60 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quick Cutter Method

Minimize the construction area and shorten the construction time! Introducing the construction methods we use.

The "Quick Cutter Method" is a technique for replacing manhole covers, where a circular cutter equipped with a wireless camera is mounted on an excavator to cut through asphalt and concrete pavement. It uses ultra-rapid hardening, high fluidity, non-shrink grout (AQC grout) as the restoration material. It can be attached to excavators in the 0.1 to 0.2m (3t to 4t) class using a coupler. (Breaker placement required) It can cut to a maximum depth of 500mm, making it suitable even for thick pavements. 【Features】 ■ Equipped with cutter lift speed and lowering pressure adjustment functions ■ Circular cutting minimizes the construction area and shortens construction time ■ Can be operated while the excavator is loaded on a 4t flatbed vehicle ■ A wireless camera is installed inside the cutter, allowing for quick and safe alignment as it can be monitored from the driver's seat of the excavator ■ Can cut near curbs due to its hanging design *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Inspection hatches, manhole covers, and ditch covers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration