Construction method Product List and Ranking from 1590 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. コンステック Osaka//General contractors and subcontractors
  3. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  4. 4 TRAWE main office Saitama//Other construction industries
  5. 5 大建工業 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Roof insulation and waterproofing renovation method "Rimtect Method" コンステック
  3. 建物外壁工事 ロープアクセス工法 TRAWE main office
  4. 4 Vacuum concrete construction method 徳和工業
  5. 5 D-Lite D Board Method [Non-combustible decorative panel that can be processed on-site] 大建工業

Construction method Product List

3031~3060 item / All 4298 items

Displayed results

9000 Trimmer Roadbed Stabilization Method

Introduction to Machine Control Roadbed Improvement Method / Machine Control Series

The construction method is an automatic control system developed for high-precision subgrade leveling. A TS sighting mast is erected on the trimmer's machine frame, with a 360° prism installed at its tip. The position coordinate data of the trimmer is transmitted to the machine PC via a wireless communication modem mounted on an automatic tracking TS. By outputting the correction calculation values to the hydraulic control machine controller of the main body, the trimmer head (position, height, slope) and the travel steering (direction) are automatically controlled to the specified reference design position through hydraulic control. 【Main Specifications】 - The width of the trimmer head can accommodate construction of 3.25m, 3.86m, and 4.47m by replacing extensions. - The conveyor can swing 60° to the left and right, and the elevation height is H4.0m. *For more details, please refer to the PDF document or feel free to contact us.

  • Pavement construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method for natural stone pavement on roadways: "Inject Method"

Stone pavement that can withstand the passage of large vehicles. Ideal for hot spring areas, shrines, and hotel premises. A collection of case photos will be given as a gift to the first 100 people.

Currently, we have suspended our exhibition. We apologize for the inconvenience, but please contact us through the inquiry section of the link below. https://www.taiseirotec.co.jp/contact/ The "Injection Method (CA Mortar Filling Method)" is a natural stone block paving method for roadways that can withstand the passage of large vehicles over an extended period. By filling asphalt-based materials (CA mortar), which excel in shock absorption and adhesion, between the natural stone and the base pavement, we achieve a uniform and robust installation of natural stone. This allows for the construction of durable natural stone block paving for roadways. 【Features】 ■ Capable of handling everything from large-scale new paving to repairs of existing roads ■ Blocks are fixed on five sides (bottom and sides) by injecting material from the joint area ■ Compatible with both asphalt and concrete base pavements ■ Can be opened to traffic approximately three hours after construction (suitable for small-scale repairs as a repair method) ■ Can be used in conjunction with a road heating system *Please view the table of contents for the product catalog and photo collection from the <PDF Download>.

  • Paving of sidewalks, roads, parking lots and stadiums
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete surface finishing method "Stamp Concrete"

Reduce construction time and costs compared to natural stone! Reproducing the texture of natural stone and bricks in paving.

"Stamp Concrete" is a stamping method that involves coloring and shaping concrete or mortar while it is still soft. In the United States, it has over 20 years of proven results and know-how, resulting in stunningly realistic finishes. With over 50 patterns and a rich variety of colors, it can create more than 10,000 different expressions. [Features] ■ Significantly reduced construction time and cost savings ■ A wide variety of patterns for rich options ■ Excellent wear resistance *For more details, please refer to the PDF document or feel free to contact us.

  • Paving of sidewalks, roads, parking lots and stadiums
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road surface overlay construction method "OLY Method" [Patent obtained, utility model registered]

Solve the problems associated with road surface restoration work! There is no need to repeatedly perform temporary repairs like in conventional methods!

The "OLY Method" is a pavement covering construction method that employs a newly developed steel L-shaped retaining wall (OLY), achieving a reduction in construction time and high safety. By using OLY to install the covering panels in advance, there is no need to repeatedly perform temporary restorations as in conventional methods. All work after installation can be carried out within the covering, and at the end of the work, the covering panels can simply be closed, allowing for maximum utilization of permitted time for construction. This method features clear and simple construction procedures. Furthermore, it enables cost reduction through savings on material costs, disposal fees, and a decrease in transportation vehicles. 【Features】 ■ Simple and clean construction ■ High safety ■ Improved work efficiency and economy ■ Patent obtained for pavement covering method [Patent No. 4767191] ■ Utility model registration for retaining panels used in covering work [Registration No. 3131502] *For more details, please request materials or view the PDF data available for download.

  • Road construction
  • Other civil engineering works
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Sankort Method"

It is a construction method refined by the climate and environment of Hokkaido!

The "Sankort Method" is a waterproofing and anti-corrosion technique that excels in water resistance, erosion resistance, and weather resistance, utilizing soft FRP materials. As a lining method for surfaces of base materials such as concrete and metal, it demonstrates remarkable effectiveness in waterproofing and anti-corrosion for buildings and other structures. It features an exposed heavy-duty waterproofing material, creating a seamless waterproof surface. Additionally, it can be applied to complex shapes (such as fittings) and ceiling surfaces, and is easy to repair and maintain. 【Features】 ■ Excellent water resistance, erosion resistance, and weather resistance ■ Effective for waterproofing and anti-corrosion ■ Exposed heavy-duty waterproofing material ■ Seamless waterproof surface ■ Easy to repair and maintain *For more details, please refer to the catalog or feel free to contact us.

  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road construction method "Metal Road Method" [For road construction in steep slopes of mountainous areas!]

JFE Civil's unique construction method suitable for road construction on steep slopes in mountainous areas! Strong against "earthquakes" and "heavy rain," and quick to "recover."

The "Metal Road Construction Method" is a "three-dimensional frame prefabricated bridge" used for "permanent roads" where the piles at the grid points are rigidly connected to the cross beams and main beams. Since it is not a wall structure, it is less affected by backwater. By embedding the piles into the supporting ground, it provides stable support for road structures. Additionally, it allows for designs that consider the disappearance of failure layers such as landslides. Please feel free to contact us when you need our services. 【Three Reasons for Disaster Resistance】 ■ High durability structure ■ Supported by a bearing layer ■ Design based on disaster scenarios *For more details, please download the PDF or feel free to contact us.

  • 2.png
  • 3.png
  • 4.png
  • 5.png
  • 6.png
  • 7.png
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Method "Reuse Method"

Preventive measures before problems such as water shortages due to earthquakes occur!

The "Reuse Construction Method" is a unique technology that can provide higher strength (earthquake resistance) than new installations. By applying appropriate reinforcement at the right time to water storage tanks that have deteriorated more than expected, it is possible to continue using them without replacement, ensuring a safe and secure water supply. Additionally, the cost is less than half that of replacing water storage tanks, and it helps prevent the industrial waste of FRP products, which has become a recent issue. We also accept inquiries about repairs for various tanks, including chemical tanks and sludge tanks, in addition to drinking water storage tanks, so please feel free to contact us. 【Features】 ■ Increased strength compared to new water storage tanks ■ No need to replace water storage tanks ■ Ensures safe and secure water ■ Cost reduction ■ Prevents industrial waste *For more details, please refer to the catalog or feel free to contact us.

  • Safety and consumables
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Uneven Surface Adaptation Drainage Method "Seal Drain"

Water leakage prevention from joints and cracks in concrete structures / for water stopping in central medians!

"Seal Drain" is a water leakage treatment method (waterproofing material) that can handle uneven concrete and mortar spray surfaces. It uses a soft silicone seal that is flame-retardant and has weather and cold resistance. The soft sheet has excellent adhesion and is compatible with various materials such as concrete and metal. 【Features】 - Capable of treating water leakage from mortar spray surfaces - Uses a flame-retardant, weather-resistant, and cold-resistant soft silicone seal - The soft sheet has excellent adhesion and is compatible with all materials, including concrete and metal - Made of superior flexible material *For more details, please refer to the PDF document or feel free to contact us.

  • image_06.jpg
  • image_07.jpg
  • image_08.jpg
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case study: Crystal lining method for corrosion prevention and water stopping in concrete structures.

Catalog available! This is a construction method that can be implemented even in high humidity environments where construction has been difficult. We are also recruiting new association members.

The "Crystal Lining Method Catalog" is a catalog introducing the methods of the Crystal Lining Method Association, which mainly conducts aging countermeasure projects for sewer facilities. It presents methods that demonstrate excellent performance in corrosion prevention and maintenance of concrete structures. The method involves applying a solvent-free epoxy resin mortar with anti-corrosive properties to concrete structures for water stopping (adhesive reinforcement type water stopping), corrosion prevention (coating type lining), reinforcement (reinforcement lining), and seismic reinforcement of manholes, using a manual construction method that does not involve machinery. [Contents] ■ Crystal Lining - 4 Methods ■ Other Methods ■ List of Test Items *For more details, please contact us or download the catalog.

  • Special Construction Method
  • Sewerage facilities
  • Concrete construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion lining method

Confirmed to meet quality standards through official test results! Reliable construction techniques and a wealth of experience.

The "Anti-Corrosion Lining Method" is a technique where a crystal lining material is applied and then topped with a crystal lining topcoat. It can also be implemented in construction environments (high humidity, wet conditions) during repairs of existing pipeline facilities (manholes, conduits, etc.). It complies with the quality standards of the Japan Sewerage Agency's "Manual for Corrosion Control Technology and Anti-Corrosion Technology for Sewer Concrete Structures," specifically for the coating-type lining methods (Type C) and (Type D). 【C Type Quality Standard Test Results (Excerpt)】 ■ Appearance of the coating: No wrinkles, unevenness, peeling, or cracking observed. ■ Adhesion to concrete: - Standard condition: 2.7 N/mm² - Water absorption condition: 2.6 N/mm² ■ Acid resistance: No blistering, cracking, softening, or leaching observed in the coating. ■ Depth of sulfur intrusion: - 4% relative to the design thickness - Intrusion depth: 38 μm *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP Bridge Vacuum Infusion Method

A bridge that is resistant to salt damage, lightweight, high-strength, and does not decay.

Vacuum Infusion The entire glass fiber mat layered on the mold is covered with a film and sealed, creating a complete vacuum state by removing the air from the glass fiber layer. Next, using the power of the vacuum, polyester resin is injected into the glass fiber layer, ensuring it spreads evenly to create a uniform and strong FRP laminate. This manufacturing method is referred to as "Vacuum Infusion (VI)." This technique is also used in the production of large blades for wind turbines and yacht hulls. Laminates produced using this method are used in the structural components of FRP bridges. The high glass fiber content allows for lightweight and strong laminates, and there is the advantage of being able to produce very large laminate sheets. The shape of the mold can be freely designed, whether flat or curved, enabling the creation of elegantly shaped bridge girders.

  • Bridge Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Pin Foundation Construction Example】Difficult-to-install locations on steep slopes with standard foundations.

Simple foundation construction method for NETIS registration! We will introduce examples of construction in locations where conventional foundations are difficult to install on steep slopes.

Introducing an example of the pin foundation method in locations where it is difficult to install a standard foundation on steep slopes. In the case of standard concrete foundations, the weight can lead to sliding issues on steep slopes, resulting in large-scale foundation work. However, with the pin foundation method, it is possible to achieve deep anchoring by using longer driven pins, allowing for the easy construction of effective foundations even on steep slopes. 【Example】 ■ Nishikaibashi Park (Nagasaki Prefecture) ■ Structure: Effective width 2.0m, column pitch 1.5m to 2.0m ■ Materials used: - Handrail: Ipe wood, Jatoba wood - Decking: Ipe wood - Structural materials: Aluminum alloy, Angelim wood, Ipe wood ■ Foundation type: DP-M For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Pin Foundation Construction Example】Difficult Locations for Other Foundation Methods

Simple foundation methods for NETIS registration! We will introduce examples of construction in locations where other foundation methods are difficult.

Places where other foundation methods are difficult We will introduce examples of the pin foundation method. Due to weak ground, there are sites where foundation work becomes extensive, sites where draining water from ponds or canals incurs significant costs, or sites where transporting materials is very labor-intensive. In such cases, the lightweight pin foundation method, which can be constructed manually, is optimal. Depending on the case, it is also possible to significantly reduce the cost of foundation work. 【Examples】 ■ National Okinawa Memorial Park Ocean Expo Park (Okinawa Prefecture) ■ Structure: Effective width 2.0m, column pitch 3.0m ■ Materials used - Railing: FRP - Floorboard: FRP - Structural materials: Steel, FRP ■ Foundation type: DP-75, DP-100 *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

In soft ground or places where heavy machinery cannot enter! NETIS registered simple foundation method.

A promenade and Yatsuhashi can be created in areas with loose ground! No heavy machinery needed, and it's gentle on the natural environment.

The "Pin Foundation" is a simple foundation construction method that provides support by driving pins at an angle through a fixed block. It is effective in foundations in areas where heavy machinery cannot easily access, such as in forests, as it does not require large excavation work on the ground surface. By increasing the embedment depth of the pins, it can also accommodate soft ground conditions such as marshy or sandy soils. 【Features】 ■ Suitable for foundations of small structures like boardwalks, Yatsuhashi bridges, and pavilions ■ No ground excavation required for heavy machinery access, making it environmentally friendly ■ Two types of construction methods available based on application ■ Registered with NETIS *You can view a catalog with numerous construction examples from the "Download" section.

  • Civil Engineering Method
  • Ground foundation construction method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe lining method "Cement Mortar Lining"

Achieving the optimal lining for all types of pipes! Cement mortar lining method.

Our diverse pipe lining technologies provide optimal solutions tailored to the various needs of our customers. Our innovative rehabilitation technology that seamlessly lines with cement mortar has received high praise for reinforcing and extending the life of existing pipelines, as well as restoring their water conveyance capacity. 【Features】 ■ Excellent corrosion resistance ■ Reinforcing effect on pipes ■ Improved flow velocity coefficient ■ Effective in preventing leaks ■ Difficult to peel off ■ Simple pre-treatment of pipes ■ Durable for long-term use *For more details, please refer to the PDF document or feel free to contact us.

  • Pipeline Construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe lining method "Hose Lining"

Achieving the perfect lining for all types of pipes! Hose lining method.

Our diverse pipe lining technology provides optimal solutions tailored to various customer needs. Water pipes, sewer pipes, and industrial water pipes are facing issues due to earthquakes, ground subsidence, and aging from years of use. The lining method, which involves applying adhesive to a seal hose, pressurizing it, and inserting it while inverting it inside the pipe to cure the adhesive, allows for high-difficulty pipeline maintenance and has accumulated trust and results as a groundbreaking method. 【Features】 <For drinking water> ■ Reinforces the pipeline while providing seismic resistance ■ Prevents red water and leaks ■ Improves water flow capacity ■ Capable of constructing long spans and bent pipes ■ Excellent safety and durability *For more details, please refer to the PDF document or feel free to contact us.

  • Pipeline Construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe lining method "SZ Lining"

Achieving the perfect lining for all types of pipes! SZ Method

Our diverse pipe lining technology provides optimal solutions tailored to various customer needs. The "SZ method" involves pulling an SZ liner into the sewer pipe using a manhole, expanding and heating the liner with air and steam to form a standalone pipe within the existing pipe. Even though SZ pipes are thin, they possess standalone pipe strength equal to or greater than that of rigid PVC pipes for sewer use. Furthermore, they excel in durability, oil resistance, and acid resistance, with a lifespan that is virtually permanent. 【Features】 ■ Formation of robust FRP pipes (standalone pipes) within existing pipes ■ Standalone pipe strength equal to or greater than that of rigid PVC pipes for sewer use ■ Flow capacity equal to or greater than that of new pipes ■ Excellent durability and chemical resistance *For more details, please refer to the PDF materials or feel free to contact us.

  • Pipeline Construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe lining method "Stockyard/Factory Lining"

Achieving the perfect lining for all types of pipes! Stockyard/Factory lining method!

Our diverse pipe lining technologies provide optimal solutions tailored to various customer needs. We can accommodate both new and old pipes, as well as irregularly shaped pipes that cannot be lined on-site, and we are suited for large-scale single operations that offer cost advantages. We offer the "BP method," which utilizes high-speed centrifugal spraying, and the "SB method," which finishes by rotating the pipe at high speed. 【Features】 ■ Applicable to both new and old pipes ■ Capable of large-scale construction in a short time ■ Can be applied to standard items as well as special pipes like irregularly shaped ones ■ Ensures stable quality *For more details, please request materials or view the PDF data available for download.

  • Pipeline Construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof vertical rising part dry protection method "Parablind PA"

Utilizing the joint at the bottom of the jaw to simplify construction and shorten the construction period!

"Parabline PA" is a dry protection method for waterproofing that utilizes the joints at the lower part of the parapet and wall, as well as the equipment foundation. There are two installation methods: a holder system that prevents deformation due to concrete lateral pressure and a direct installation method using drainage joint bars, both of which simplify construction and shorten the construction period. 【Features】 ■ Simplified construction ■ Shortened construction period ■ Under-chin type ■ Both holder system and direct installation method available *For more details, please refer to the catalog or feel free to contact us.

  • Waterproofing work
  • Roof and gutter construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof vertical rising part dry protection method "Parablind PB"

Improves ventilation on the back of the board and demonstrates heat retention prevention effects!

"Parablind PB" is a waterproof dry protection method designed to improve the air permeability of the back surface of the board by floating the board, with a focus on preventing heat accumulation. There are holder methods using the board joint "PM25" and direct installation methods using drainage joint rods. 【Features】 ■ Improves air permeability of the back surface of the board ■ Prevents heat accumulation ■ Chin-type ■ Both holder method and direct installation method are available *For more details, please refer to the catalog or feel free to contact us.

  • Waterproofing work
  • Exterior coating materials
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof vertical rising part dry protection method "Parablind PC"

A highly rational construction method that combines aesthetics and functionality has been realized!

The "Parablind PC" is a highly rational waterproof vertical protection method that combines aesthetics and functionality through the use of aluminum capping. It is installed using a separation method for mounting brackets, with a hanger rail in the upper holder and a C-shaped rail in the lower holder. 【Features】 ■ Installed in combination with aluminum capping ■ Combines aesthetics and functionality ■ Separation method for mounting brackets ■ Metal capping type *For more details, please refer to the catalog or feel free to contact us.

  • Waterproofing work
  • Exterior coating materials
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof vertical rise dry protection method "Parablind PD"

A dry protection method that allows for a sharp finish and high design flexibility.

The "Parablind PD" is a waterproof dry protection method for vertical rises that combines with drainage hardware (D-70), offering a sharp finish and greater design flexibility. It is constructed using a holder integration method with drainage hardware and lower holders. 【Features】 ■ Drainage type ■ Holder integration method ■ Sharp finish ■ Installation of drainage hardware (D-70) ■ Installation of lower holder (C-type rail) *For more details, please refer to the catalog or feel free to contact us.

  • Waterproofing work
  • Exterior coating materials
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof vertical rising part dry protection method "Parablind PE"

Construction method combined with a guard case PE that has a water drainage function.

"Parablind PE" is a waterproof dry protection method for the vertical rise when there is no joint at the bottom of the jaw, combined with the guard case PE that has a drainage function. The guard case PE is fixed in a designated position at the bottom of the jaw with a resin anchor, and the upper holder is installed. [Features] - No joint at the bottom of the jaw - Drainage type - Integrated holder system - Installation of the upper holder (guard case PE) - Installation of the lower holder (C-type rail) *For more details, please refer to the catalog or feel free to contact us.

  • Waterproofing work
  • Exterior coating materials
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Air Formwork Method "Toyo Fence"

We promise excellent workability and durability, as well as a reduction in construction time and costs compared to traditional lath methods.

At Kaneyasu, we handle the air-type formwork method known as "Toyo Fence." Since it is made of a material that does not allow concrete to adhere, demolding is easy even with a curing period. This ensures that no foreign substances remain in the concrete structure, allowing for effective laitance treatment and preventing cracks and leaks at the joints. Furthermore, since post-construction is possible, independent construction after rebar placement can shorten the construction period. 【Features】 - Lightweight and highly flexible, providing good workability - Easy demolding even with a curing period due to the non-adhesive material - Excellent abrasion and pressure resistance - Adaptable to changes in joint positions - Available in various shapes according to application and construction method *For more details, please refer to the PDF materials or feel free to contact us.

  • Concrete construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Simple Detachable Strong Magnet Scaffolding and Rail Temporary Construction Method"

A scaffolding temporary construction method using detachable fittings that can easily remove powerful magnets!

The "Easy Detachable Strong Magnet Scaffolding and Rail Temporary Construction Method" uses detachable fittings that allow for the easy attachment and detachment of strong magnets, enabling scaffolding to be installed in various locations where magnets can be used. It allows for the easy installation of rails for maintenance equipment developed by our company onto wind power generation towers, and it is also possible to attach rails for maintenance equipment developed by our company to the water conduits of dams. Furthermore, with our developed strong magnet detachable fittings, if steel materials are used, scaffolding and other temporary structures can be easily set up by combining with construction jack bases or rails, thus shortening the construction period. 【Features】 ■ Improved safety ■ Reduced burden on workers ■ Shortened construction period ■ Significant cost reduction *For more details, please refer to the catalog or feel free to contact us.

  • Renovation and repair methods
  • Temporary Construction
  • Equipment leasing and rental
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Citric Acid Hypochlorous Water Production Device 'UFD-80s'

A pH hypochlorous water supply device that enables stable hypochlorous acid concentration and pH value!

The "UFD-80s" comes with safety devices, ensuring peace of mind even in the event of accidental chemical input. It is easy to move due to its casters and is designed for small-scale applications and on-site installation. It includes a high-concentration effective chlorine concentration measurement kit "UFA-202." 【Features】 ■ Capable of producing 120L/min of sterilizing water when the water supply's flow rate and pressure are sufficient. ■ Space-saving design as it does not require a sterilizing water storage tank or pump. ■ Can be set to any desired hypochlorite concentration and pH value (even if the flow rate varies, it can automatically adjust and maintain the set hypochlorite concentration and pH). ■ Sodium hypochlorite 12% and citric acid solution 50% are replaced with each container. ■ The citric acid solution is red-colored, allowing for easy identification from hypochlorite and other chemicals. ■ Continuously measures and displays hypochlorite concentration, pH value, and water temperature (HACCP compliant). ■ Comes with safety devices for peace of mind in case of accidental chemical input. ■ Can also be used for cleaning and sanitizing washing machines, slicers, containers, and other equipment. ■ Achieves safe food washing and sterilization. *For more details, please refer to the catalog or feel free to contact us.

  • Water Treatment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Carbonic Acid Hypochlorous Water Production Device 'UF-120s'

Successfully reduced carbon dioxide usage by 50% compared to conventional levels!

The "UF-120s" is a large-scale, machine room-installed device designed to be installed separately from the sodium hypochlorite injection machine and pH adjustment machine, in places such as the machine room or factory water supply source. It comes with a high-concentration effective chlorine concentration measurement kit "UFA-202." 【Features】 ■ A device that adds a carbon dioxide supply unit to the citric acid sodium hypochlorite production system. ■ Successful significant reduction of carbon dioxide through proprietary control technology. ■ Capable of producing 120 liters per minute of sterilizing water if the water volume and pressure at the supply source are sufficient. ■ Space-saving as it does not require a sterilizing water storage tank or sterilizing water delivery pump. ■ Can be set to any desired sodium hypochlorite concentration and pH value (even with varying flow rates, it can automatically adjust and maintain the set sodium hypochlorite concentration and pH). ■ Continuous measurement and display of sodium hypochlorite concentration, pH value, and water temperature (HACCP compliant). ■ Usable for cleaning and sanitizing washing machines, slicers, containers, and equipment. ■ Prevents accidental misfilling during chemical replenishment by only requiring the addition of sodium hypochlorite (12%). *For more details, please refer to the catalog or feel free to contact us.

  • Water Treatment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Nippon Fire Yokohama Building - Water Ceramic Construction

Introducing examples of natural stone exterior wall deterioration prevention work for stone materials (granite)!

This is an introduction to water ceramic application on stone (granite). 【Features】 - Reduces penetration contamination from the back of natural and artificial stone, as well as surface contamination - Makes it easier to remove adhered dirt 【Construction Date】 February 1989 For more details, please refer to the catalog or feel free to contact us.

  • Reinforcement and repair materials
  • Coating film waterproofing material/permeable waterproofing material
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration