List of Construction, work and methods products
- classification:Construction, work and methods
9766~9810 item / All 28336 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
I have compiled a report to learn more about the technology of the "Refleet Method." We are sharing the know-how that has proven successful in repair work for reinforced concrete structures!
- Unit and other construction
The TIGCON-T series enables welding comparable to laser welding with a TIG welder.
- Metalwork
Tunnel reinforcement rebar labor-saving method! A cycle every two days is now possible, significantly reducing work time!
- Tunnel construction
Solve your dampness problems in factory ceilings, office air conditioning, and restaurant kitchens!
- Heat insulation and heat shielding methods
- Natural paints (water-based, ink, etc.)
- Easily and quickly construct temporary roads on weak ground! - As a disaster prevention and mitigation product before a disaster occurs. It demonstrates effectiveness as construction material duri...
- Geological Survey
- Special Construction Method
- Ground improvement
A bioremediation method that allows for the purification of oil-contaminated soil while predicting the purification period.
- Geological Survey
- Special Construction Method
- Ground improvement
Technology to protect structures from natural disasters is also our area of expertise.
- Tunnel construction
- Dam construction
- Waste treatment facilities
[November 12 (Tuesday) Event] Announcement of the Human, Dreams, and Technology Group Technical Research Presentation 2024 - Introducing various projects undertaken by the Human, Dreams, and Technology Group.
The Human, Dream, and Technology Group will hold the "Human, Dream, and Technology Group Technical Research Presentation 2024" on Tuesday, November 12, 2024. The theme for the Technical Research Presentation 2024, continuing from last year, is "Towards the Realization of a Sustainable Society and a Happy Life Guided by Technology." Before the individual technical research presentations, our exclusive para-athlete Daisuke Watanabe will give a keynote speech titled "Towards Dreams - With Various Goals, Step by Step: Curiosity, Inquiry, Discovery, and Action." You can also attend easily via the web. We hope you will participate and deepen your understanding of our company. *Pre-registration is required to attend. Please register in advance using the URL below. 1. Date: Tuesday, November 12, 2024 2. Time: 13:00 - 16:55 (Registration starts at 12:30) 3. Method: Hybrid event held both in-person and online 4. Presentation content: Please refer to the program in the brochure. 5. Registration URL: https://forms.office.com/r/WbGTi30uQb 6. Application deadline: By 12:00 on November 1 (Friday)
It is now possible to obtain high-quality samples of ground that includes gravel, gravelly soil, and fragmented gravel, which could not be achieved with conventional sampling methods!
- Other civil engineering works
- Geological Survey Company
- Geological Survey
Lightweight and easily transformable! For temporary LED lighting at construction sites, architectural sites, and interior lighting, etc.!
- Unit and other construction
- Garden lighting/lights (LED/solar)
- Waterproof tape, adhesive, drain, protective panel
On-site safety measures: Gaining an advantage in public works! We aim to unify the intentions of on-site workers and prevent crane overturning disasters.
- Crane and others
- Safety and consumables
Easy to install and allows you to cover the cargo area seat while inside the vehicle! Automatic scattering prevention sheet system (NETIS registered product)
- Tunnel construction
- Road construction
- Railway Construction
The dump truck bed sheet opening and closing is completed automatically [Automatic Debris Prevention Sheet System] Easy installation by simply attaching it to existing electric cobble lanes!
- Tunnel construction
- Road construction
- Railway Construction
It expresses a unique texture with a deep aging-style finish. [Responsible construction]
- Renovation and repair methods
- Special Construction Method
High weather resistance and ultra durability! The beauty of the past is revived while maintaining the texture of the material. [Responsible construction]
- Renovation and repair methods
- Special Construction Method
A lineup of pipe fittings that cater to a wide range of fields! We are currently offering a comprehensive catalog with dimension tables.
- Railway Construction
- Special Construction Method
- others
Regarding the relocation of the Fukuoka office.
As of October 11th, the Fukuoka office has relocated to the address below. Please note that both the phone number and fax number have also changed. We appreciate your continued support. 〒810-0802 Fukuoka Prefecture, Fukuoka City, Hakata Ward, Nakasu Nakajima Town 2-3, Fukuoka Fujiland Building TEL: 092-273-1960 FAX: 092-273-1980
The welding machine synchronizes to automatically supply shielding gas (argon gas, CO2, etc.) to the back shield fixture and trailer nozzle.
- Metalwork
Improved cleaning performance and drainage flow rate!
- Water and sewerage pipe fittings
- Waterproofing work
- Washing machine and dryer
It harmonizes without compromising its appearance in both urban areas and natural settings.
- Concrete block, ALC panel, extrusion molded cement board construction
- Special flooring/outdoor
Leave the brush cutter to us.
- Agricultural civil engineering works
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
- others
Portable generator with ATS and remote control function: A new feature has been added to the generator that primarily uses LP gas as fuel.
- Prime movers, torque converters, hydraulic equipment, generators
A completely new painting education system using VR technology.
- Plastering and painting work
Adopted by architectural and design offices as well as general contractors. A method capable of rust prevention for large and complex-shaped steel structures that are difficult to hot-dip galvanized.
- paint
- Rust Inhibitor
- Special Construction Method
Planning "real bird damage control" primarily using repellent agents to break the attachment of wild birds, while also understanding the pros and cons of building structures, environments, and various...
- Renovation and repair methods
- others
- Other commercial buildings and service facilities
Speedy construction! Of course, we can create perfectly round dome ceilings, as well as oval-shaped dome ceilings. Based on the assembly diagram, you can construct the base with a model kit feel!
- Special Construction Method
- Earthquake-resistant construction method
For the treatment of floating oil, emulsified oil, and VOCs! Please make use of the treatability test!
- Water Treatment
- Turbid water and muddy water treatment machines
Rapid on-site support! We will customize to your plant and the systems you require!
- Water Treatment
- Turbid water and muddy water treatment machines
- Construction machinery leasing and rental
Environmental restoration with reliable technology and experience! No waste as we combine each unit!
- Water Treatment
- Turbid water and muddy water treatment machines
- Construction machinery leasing and rental
Can be installed in narrow empty spaces within the factory! We have a wide range of models available!
- Water Treatment
- Turbid water and muddy water treatment machines
- Construction machinery leasing and rental
Achieve excellent dehydration treatment! Complete vibration prevention measures with a bolt-on assembly method and a wide range of options!
- Water treatment technology and systems
- Turbid water and muddy water treatment machines
Where there is muddy water, there is the Water General! Installation work is just a matter of placement, enabling stable and high-performance treatment!
- Turbid water and muddy water treatment machines
- Water Treatment
Repairs, cleaning, and emergency rentals! We offer equipment tailored to various conditions and respond to troubles!
- Water Treatment
- Construction machinery leasing and rental
It is a 3-arrow LED sign. Lightweight and easy to carry.
- Road construction
- Tunnel construction
- Bridge Construction
"Securing drinking water" and "line switching" repairs, replacements, and emergencies! Short-term rentals available!
- Rainwater tank
- pump
- Construction machinery leasing and rental
Rental during repairs, cleaning, and replacements! We will respond quickly in case of troubles while driving!
- Turbid water and muddy water treatment machines
- Construction machinery leasing and rental
Always non-weighted construction method! Since no special construction is performed, it can be completed easily and in a short time. [Looking for sales partners]
- Renovation and repair methods
We undertake molding, processing, and surface treatment of your company's products.
- Heat insulation and heat shielding methods
Ideal for temperature management of concrete in hot weather. Rapid cooling system for concrete using liquid nitrogen.
- Bridge Construction
- Tunnel construction
- Dam construction
The specifications comply with the standards of the Geotechnical Engineering Society, and the product range includes a 400mm square model and a sinking rod for buried pipes.
- Ground improvement
The specifications comply with the standards of the Geotechnical Engineering Society, and the product range includes a 600mm square model and a sinking rod for buried pipes.
- Ground improvement
- Site and ground investigation
A groundbreaking improved drilling machine born from mechanical analysis.
- Drilling Machine
We offer a range of products related to concrete construction, including rubber products for construction, rubber wheel stops, and anti-vibration rubber, used at construction sites.
- Rubber sheet
- Earthworks
- Pile and foundation work
Sound-absorbing and condensation prevention material that can be directly sprayed onto roofs and walls.
- Heat insulation and heat shielding methods
- Insulation work
- Roof and gutter construction
Safe transportation is possible without worrying about the falling of the upper column.
- Temporary Construction
- Subsidiary materials