List of Ground foundation construction method products

  • classification:Ground foundation construction method

151~165 item / All 753 items

Displayed results

Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
株式会社吉光組.png

The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.

The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.

Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic information on the mini wall construction method and various case studies are included! It can accommodate narrow sites and can achieve a maximum depth of 20m with small machinery!

  • Ground foundation construction method
  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A ground continuous wall method that can accommodate narrow sites and allows for construction at a maximum depth of 20 meters with small machinery. It can also be adapted for permanent retaining walls...

  • Ground foundation construction method
  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Don't you think it's natural to leave steel sheet piles in place during construction near sewer pipes? With this method, you can safely extract the steel sheet piles and suppress subsidence.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Over 850 construction achievements" The 'GEOTETS method' ensures no underground obstacles are left due to abandonment (burial)! It minimizes impact on the surrounding area and also addresses soil con...

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Announcement of Participation in the Railway Technology Exhibition 2021 [GEOTETS Method]

We will be exhibiting at the Railway Technology Exhibition 2021 held at Makuhari Messe. [Over 400 construction achievements] This is an opportunity to learn more about the 'GEOTETS method' that leaves no underground obstacles due to abandonment (burial)! We look forward to your visit!

No underground obstacles will be left behind due to abandonment (entombment)! The 'GEOTETS method' is effective in such areas.

  • Ground foundation construction method
  • Civil Engineering Method
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
2021-07-28_15h28_34.png

A technology that allows for the safe extraction of steel sheet piles even in locations close to railways: "GEOTETS Method."

The "GEOTETS Method" is a construction technique that allows for simultaneous filling while pulling out from pre-installed filling pipes into the voids created by the extraction process. It highly suppresses ground displacement, enabling safe extraction of retaining materials. In recent years, due to the frequent occurrence of major disasters caused by heavy rain, this method has seen an increase in usage as a countermeasure that does not create water channels in retaining works for rivers and reservoir embankments, and it can also be implemented underwater. In soil contamination countermeasure projects, a two-year groundwater monitoring period is required after the completion of the work, which prevents the extraction of retaining materials. By adopting this method, which has the function of a waterproof wall, retaining materials can be removed early, leading to cost reductions. Additionally, we will be exhibiting at the "Sewerage Exhibition '21 Osaka" to be held at Intex Osaka from August 17 (Tuesday) to August 20 (Friday), 2021. We sincerely look forward to your visit.

The recycled and reused steel sheet piles exceed 86,000 tons. It is a construction method that prevents loosening of the surrounding ground when extracting steel sheet piles!

  • Ground foundation construction method
  • Civil Engineering Method
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A new method that changes the common understanding of existing pile extraction (pile pulling) construction!

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

By constructing the foundations of various pillars with EPS, we achieve lightweight design and significant reduction in construction time!

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filter

classification
Delivery Time
Location