A new method that changes the common understanding of existing pile extraction (pile pulling) construction!
The "Pile Tip Power Chucking (PG) Method" is a technique for lifting existing piles while they are encased in a casing. Since the entire existing pile is removed while being enveloped, it is possible to reliably remove piles that are bent, damaged, or have unconnected joints. Additionally, during the lifting process, a filler material is injected into the pile hole while lifting, allowing for simultaneous pile removal and filling. 【Advantages】 ■ Safe and reliable removal of existing piles ■ Reliable filling from the deepest part of the pile hole *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【New Technology】 ■ Pile Tip Chucking Method ■ Simultaneous Injection Method for Extraction Traces ■ Centralized Management with Control Device *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company is well-equipped with extensive know-how for the removal of underground remnants, including existing pile extraction, and ground environment improvement. We provide safe and reliable construction that creates value for new land use and offers high-quality ground environments. You can entrust us with everything from building demolition to existing pile extraction, obstacle removal, and ground improvement.