List of Earth retaining wall/foundation reinforcement products
- classification:Earth retaining wall/foundation reinforcement
16~30 item / All 118 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Three types are available: net type, close-contact type, and G-spec! You can choose according to the site conditions.
- Earth retaining wall/foundation reinforcement
A method to prevent falling rocks inside the wire mesh and a method to drop rocks into the wire mesh!
- Earth retaining wall/foundation reinforcement
The maximum pull-out force of the reinforcement material can be applied up to 90 kN per unit based on field tests!
- Earth retaining wall/foundation reinforcement
Units can be delivered one piece at a time! They can be divided into smaller portions, saving the hassle of cutting ropes.
- Earth retaining wall/foundation reinforcement
Not heavy anymore! Not dangerous anymore! Significantly reduces the burden during rod attachment and detachment in bowling operations! Rod handling device RHS Eagle Grip Series.
- Earth retaining wall/foundation reinforcement
Not heavy anymore! Not dangerous anymore! Significantly reduces the burden during the attachment and detachment of rods in bowling operations! Rod handling device RHS Eagle Grip Series.
- Earth retaining wall/foundation reinforcement
Stabilizing unstable slopes with a high-strength net woven with wire rope and reinforcement materials.
- Road construction
- Railway Construction
- Earth retaining wall/foundation reinforcement
A case of shipping foundation blocks 600□×H800, Φ318 for disaster response measures!
- Earth retaining wall/foundation reinforcement
Unloading starts at 11 PM! A speedy installation case completed in 30 minutes.
- Earth retaining wall/foundation reinforcement
Anchor bolt positions, FEP pipe specifications, number and positions, etc.! Manufactured to fit the site.
- Earth retaining wall/foundation reinforcement
No underground obstacles will be left behind due to abandonment (entombment)! The 'GEOTETS method' is effective in such areas.
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
A technology that allows for the safe extraction of steel sheet piles even in locations close to railways: "GEOTETS Method."
The "GEOTETS Method" is a construction technique that allows for simultaneous filling while pulling out from pre-installed filling pipes into the voids created by the extraction process. It highly suppresses ground displacement, enabling safe extraction of retaining materials. In recent years, due to the frequent occurrence of major disasters caused by heavy rain, this method has seen an increase in usage as a countermeasure that does not create water channels in retaining works for rivers and reservoir embankments, and it can also be implemented underwater. In soil contamination countermeasure projects, a two-year groundwater monitoring period is required after the completion of the work, which prevents the extraction of retaining materials. By adopting this method, which has the function of a waterproof wall, retaining materials can be removed early, leading to cost reductions. Additionally, we will be exhibiting at the "Sewerage Exhibition '21 Osaka" to be held at Intex Osaka from August 17 (Tuesday) to August 20 (Friday), 2021. We sincerely look forward to your visit.
The recycled and reused steel sheet piles exceed 86,000 tons. It is a construction method that prevents loosening of the surrounding ground when extracting steel sheet piles!
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
High-durability ground anchor with a plate water stop structure and grease-free head, ensuring reliability and ease of maintenance.
- Reinforcement and repair materials
- Water stop
- Earth retaining wall/foundation reinforcement
KJS Association Anchor Repair Association Hokkaido Regional Technical Training Seminar
We have planned a technical training session for the Hokkaido region in collaboration with the KJS Association and the Anchor Repair Association. We are pleased to welcome Mr. Makoto Okuzono, Senior Fellow of the Highway Research Foundation, as a special lecturer, who will give a presentation on slope stabilization using ground anchors. Additionally, we will explain the EHD Anchor HP method, which features high pressure resistance and improved maintenance due to the use of a new type of plate waterproof structure for the head and a transparent cap with grease-free fixtures, utilizing a 100-year durable bonded ECF strand. We will also discuss the KJS wooden load-bearing body removal anchor that uses wood for the load-bearing body, as well as examples of ground anchor repairs from the Anchor Repair Association. For participation registration, please click on the related materials, fill out the necessary information on the application form, and respond via fax or email to the secretariat by Tuesday, October 3rd. Geotechnical Engineering Society CPD Program Certification Number: Keis 23-00211-014, 3 points. National Association of Civil Engineering Construction Managers CPDS Certified Training Program Number: (823684), 3 units.
We will solve everything related to heat pump units, outdoor air conditioning units, and piping support hardware.
- Earth retaining wall/foundation reinforcement
The vending machine is reusable. It is also suitable for home tanks.
- Earth retaining wall/foundation reinforcement