List of 防止|Other construction industries companies
- Industry : Other construction industries
1~45 item / All 114 items
一般社団法人 全国落石災害防止協会
Okayama/Kita-ku, Okayama-shi/1-1-30 Yamato Town (inside Daini Kensetsu Co., Ltd.)
The Rock Bonding DK Bond Method int...

Stone masonry (stone wall) repair and restoration using the Rock Bond DK method.
Adhering and integrating unstable r...

Rock bonding DK bond method *Presentation of construction performance list!
Over 3,900 construction achievement...

Rockfall prevention work "Rock Adhesive DK Bond Method" *Over 4000 construction achievements
[47 Years of Durability Verificatio...

"Integrated management with BIM to reduce errors" Detailed design of steel structures using BIM
We will create drawings (general dr...

Cost reduction possible! Manufacturing of steel frames, canning, equipment, and piping prefabs from China.
Cost reduction in labor is possible...

Factory and plant equipment manufacturing case study: molten iron ladle
We would like to introduce a case w...
マトリックス
Osaka/Chuo-ku, Osaka-shi/2nd Floor, Sawano Tsurubiru, 1-2 Hiranocho,
A specialist in wireless communicat...

Forklift "Height Restriction Accident" Prevention Measures
Is the mast collision prevention ad...
![Safety measures at construction sites [Predicting contact with workers using magnetic fields and IC tags]](https://image.www.ipros.com//public/product/image/9fc/2000837800/IPROS07727039825148103388.png?w=280&h=280)
Safety measures at construction sites [Predicting contact with workers using magnetic fields and IC tags]
The Hiyari Hunter is a safety senso...

Location Information and Movement Management System "dokoja"
Record and visualize entry and exit...
トーユーエコサポート
Tokyo/Chiyoda-ku/5th Floor, Kanda Sudacho Building, 2-2-2 Kanda Sudacho
Support for creating a quiet living...
エスイー
Tokyo/Shinjuku-ku/6-5-1 Nishi-Shinjuku, Shinjuku Island Tower
Aiming to create a rich social envi...

Performance that withstands salt damage and wind damage: Ouryoku gate.
Achieving rust prevention performan...

Data Center and Critical Facility: Anti-Terrorism Gate 'Guardian Gate'
Industry first! Achieving counter-t...

HI SPEC-GATE Comprehensive Case Collection
[Presenting Case Studies] A large n...

Report on the Eco-Mulfilm Construction Observation Meeting
A report on the construction observ...

Construction report on "Eco-Mulch Film" at Kyoto University National University Corporation.
Because the room was very hot, we i...

Construction report on "Eco-Mulfilm" at Kanazawa University Hospital, a National University Corporation.
The existing film had deteriorated ...
ムライケミカルパック 東京営業所
Tokyo/Bunkyo-ku/3rd Floor, Tamaya Building, 1-16-1 Koishikawa
Extreme heat, leaking roofs, aging....

Chemical Cation Pack Method Ver.2 for Rain Leakage and Extreme Heat Measures
Solve all your factory and warehous...

Special coating for factory and warehouse roofs with double effect of heat insulation and waterproofing.
"Just by applying it, it’s cool wit...

Asbestos Measures: Strength Restoration Coating for Old Slate
"Chemical Cation Pack Method" for h...

ASL Method for Hotels and Inns (Tile and Stone Anti-Slip Construction)
To reduce "slipping and danger," ma...
![[For nursing care facilities] ASL method (anti-slip construction for tiles and stones)](https://image.www.ipros.com//public/product/image/9d1/2001278580/IPROS2079774466088004617.jpeg?w=280&h=280)
[For nursing care facilities] ASL method (anti-slip construction for tiles and stones)
To reduce "slipping and danger," ma...
![[For Golf Business Operators] ASL Method (Tile and Stone Anti-Slip Construction)](https://image.www.ipros.com//public/product/image/43e/2001278579/IPROS17323267861042208317.jpeg?w=280&h=280)
[For Golf Business Operators] ASL Method (Tile and Stone Anti-Slip Construction)
To reduce "slipping and danger," ma...
サービング 東京本社
Tokyo/Taito-ku/1-6-1 Asakusa-bashi, Asakusa-bashi Building 5F
We provide professional services fo...

Refresh Entrance Tile Construction Case Study: Hot Spring Facility
Completely removed scale! Here are ...

Refresh Entrance Tile Construction Case: Kindergarten / External Deck
A floor that is easy to maintain ha...

Refresh Entrance Tile Installation Case: Kindergarten/Childcare Room
This is an introduction to a case w...
一般社団法人SCFR工法協会
Hyogo/Kita-ku, Kobe-shi/300 Kusakabe, Dojo Town, inside Fukoku Industrial Co., Ltd.
For corrosion prevention, repair, a...

Automatic grass cutting robot 'NEXMOW' mower
Achieve automation and labor-saving...

Business visualization solution for the transportation industry at the worksite.
Streamlining dispatch management th...

Business visualization solution for the fishing industry at the work site.
Increased catch volume! Improved ef...
オーティーオー技術研究所 大阪本社
Osaka/Kita-ku, Osaka-shi/6th Floor, Torishima Office One Building, 1-5-2 Tenma
Comprehensive support for sound and...
札幌施設管理
Hokkaido/Shiroishi-ku, Sapporo-shi/14-3-37 Nangyo-dori, North 14th Street
We have consistently focused on equ...
中村物産
Miyagi/Taihaku-ku, Sendai-shi/1-4 Sunaoshi Minamicho, Seiwa Building 2F
- Resolve labor shortages - Shorten...

Vibration-damping joint fitting "Compass"
Suppresses unpleasant vibrations in...

Disaster recovery and disaster prevention construction method "Expanded Polystyrene Particle Lightweight Concrete"
Packaging improves workability and ...

Disaster Recovery and Disaster Mitigation Technology: "Foam Styrene Light Drain Civil Engineering Method"
Construction done manually! It offe...
エースコン工業
Shizuoka/Aoi-ku, Shizuoka-shi/2-76, Tamachi, Minato-ku
Aiming for effective utilization of...
イシクラ
Tokyo/Shinjuku-ku/4th floor, SC Building, 4 Yotsuya 3-chome
Leave the manufacturing and sales o...
コンフォートテック
Chiba/Chuo-ku, Chiba-shi/1-55 Tōyamachi, C.O. Building 6th Floor
We want to provide comfortable tech...

Blast machine application: Cleaning treatment for construction scaffolding.
We have machines capable of process...

Automatic Vehicle Stopper for Anti-Terrorism: SP400 High-Security Bollard
Bollards (vehicle stops) with numer...

Automatic Vehicle Stopper for Anti-Terrorism: SPTT High-Security Bollard
A bollard (vehicle stop) designed f...
東京ブイテック
Tokyo/Chuo-ku/2-14-7 Nihonbashi Hamacho, Hayashi Building 2nd Floor
A consistent vibration control cons...

High-performance vibration-damping material for interior and exterior walls 'Vibran-E'
We offer solutions with 9 different...

Measures against impact noise from weight! Vibration isolation material 'Bisolate' for wet floating floors.
A clean floating floor vibration is...

Vibration-damping material for floating beds "Vibran-E"
Vibration isolation material for fl...
マルホウ 本社
Aichi/Togo-cho, Aichi-gun/Shunmuki Shitamiranda 446-1098
We provide consistent construction ...

Numerous achievements in public and private sectors! Asbestos removal "Water Clean Method"
【Safe reduction of construction per...

Numerous achievements in public works! Asbestos removal "Water Clean Method"
Reduce the hassle of selecting cont...

Consistent response from preliminary investigation! Asbestos removal "Water Clean Method"
We provide consistent support from ...
高森コーキ
Niigata/Sanjo-shi/4-8-18 Nishi-Yonchome, Minami-Yonemachi
We support the creation of a rich a...