The high-precision geo-column method reliably demonstrates surface friction force and thoroughly prevents settlement.
This is a ground improvement method that involves mechanically mixing cement milk with the soil at the original ground level to a specified depth, creating a strong columnar improvement body underground. Due to the large diameter of the improvement body, excellent lateral friction can be ensured, providing reliable settlement prevention effects even in very soft underlying ground with an equivalent N value of around 4. It can be widely applied to thick soft layers, effectively transmitting the load of buildings to stable ground and supporting them from below. During construction, a construction machine equipped with multiple measuring devices is utilized to ensure high-quality construction accuracy based on reliable engineering evidence and high reliability through strict quality control.
Inquire About This Product
basic information
Cement milk produced at the plant is quantitatively discharged from the tip of the mixing blades set at the pouring location while performing insertion and extraction. After thoroughly mixing the original ground and the solidifying agent, the head is meticulously adjusted to the specified level using an auger for pile head treatment. As part of construction specification management, various measurement data during construction is recorded and centrally managed in real-time by a centralized management monitor (construction management device) installed on the construction machine itself. Furthermore, uniaxial compression tests are conducted on mold cores collected from the site to verify the required strength development, ensuring a highly transparent quality management specification.
Price range
Delivery Time
Applications/Examples of results
It is widely applicable for soft ground measures and differential settlement prevention for buildings, including residential structures. The construction process is thoroughly focused on low noise, low vibration, and short-term execution, significantly contributing to the reduction of burdens in sites where high consideration for densely populated residential areas and neighboring properties is required. As examples of quality and safety management in practice, the construction team conducts pre-construction KY meetings (hazard prediction activities) to eliminate risk factors and improve construction accuracy, ensures rapid equipment loading during withdrawal, and prevents mud stains through meticulous cleaning of adjacent roads, demonstrating thorough site management based on professionalism, which strongly supports the site supervision of the main contractor.
catalog(2)
Download All CatalogsCompany information
-







![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)