Ground reinforcement using the Tiger Pile method for commercial facilities | Geotech
Ground reinforcement work
By improving high support capacity and construction efficiency, we achieve both early opening of commercial facilities and cost optimization.
In commercial facility development projects, early opening through shortened construction periods is a crucial factor that influences business profitability. Choosing inappropriate construction methods for weak ground can lead to excessive construction lengths and large amounts of construction waste, resulting in risks of delays and budget overruns. The Tiger Pile method enhances the vertical bearing capacity per improved body by placing high-strength stepped steel pipes as core materials in soil cement columns, achieving significant reductions in construction length and overall construction time. 【Usage Scenarios】 - Ground reinforcement in the construction of new commercial facilities - Development projects requiring shortened construction periods - Sites aiming to minimize the generation of construction waste 【Benefits of Implementation】 - Significant compression of construction periods due to reduced construction lengths - Reduction in disposal and transportation costs due to decreased waste generation - Control of total budget through reduced number of pouring locations
Inquire About This Product
basic information
【Features】 - High load-bearing capacity through hybrid technology of soil cement and stepped steel pipes - High quality stability based on GBR performance certification (No. 06-12 Rev. 4) - Rational construction achieved with an efficient component configuration according to required load capacity - Real-time monitoring using the latest construction management equipment 【Our Strengths】 Geotec Co., Ltd. is a specialized company in ground engineering that provides a one-stop service from ground investigation to reinforcement design and construction. Utilizing our nationwide construction network and extensive experience, we support our customers' business plans with services that combine short construction periods, low costs, and high reliability.
Price information
Delivery Time
Applications/Examples of results
It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.
catalog(4)
Download All Catalogs
Company information
-


![Residential foundation reinforcement method "GRR Sheet Method" [Preventing differential settlement of houses!]](https://image.www.ipros.com/public/product/image/000/2000385757/IPROS3502411024306381344.png?w=280&h=280)





