Early identification of ground risks in data center development and optimization of LCC.
In the cloud services industry, ensuring the stable operation of data centers and service continuity is the most critical issue. Particularly in large-scale data center development, accurately assessing ground risks in the early planning stages and optimizing long-term life cycle costs (LCC) are essential. Ground uncertainties can lead to unexpected additional construction work and increased future facility renovation costs, potentially resulting in delays in service provision and increased costs. Geotech's dedicated ground survey services are designed to mitigate these risks and balance the reliability and economic efficiency of data centers. 【Usage Scenarios】 - New data center construction projects - Expansion and renovation projects for existing data centers - Development in areas with high risks of ground subsidence or fluctuations - When wanting to reduce long-term operational costs 【Benefits of Implementation】 - Prevention of budget overruns and delays in construction schedules in the early development stages - Mitigation of future facility renovation and repair costs - Cost optimization through the reduction of excessive foundation construction expenses - Reduction of business investment risks and improvement of project profitability - Safe and stable long-term operation of data centers
Inquire About This Product
basic information
【Features】 - Precise measurement of deep supporting layers through deep borehole investigations - Ground strength evaluation using standard penetration tests (N-value measurement) - Clarification of future settlement behavior through staged loading consolidation tests using undisturbed samples of cohesive soil layers - In-situ measurement of ground deformation coefficients through in-hole lateral loading tests (LLT) - Multifaceted stratigraphic analysis utilizing our proprietary database "GEODAS" 【Our Strengths】 Geotech provides a "total ground service," offering a one-stop solution for all ground-related tasks, from ground investigations and reinforcement design/construction for new buildings to settlement correction work for existing structures and soil contamination surveys. With extensive experience and reliable technology, we contribute to our clients' business success by early identification of ground risks in data center development and supporting the optimization of lifecycle costs.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
It is ideal for comprehensive ground risk assessment during the site selection and basic design phases of large-scale data centers and hyperscale DC development. It can be utilized to completely eliminate uncertainties related to deep foundation layers, reduce long-term maintenance costs (LCC) through settlement simulations, and avoid excessive piling work and ground improvement. Additionally, it can be used as a solution for developers and structural designers to quantify investment risks during business planning, provide high-precision evidence in review and structural conformity assessments, and optimize construction costs.